Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹56.7 CrAccepted-AOC | L-1 | Accepted-AOC Found L-1 | |
| 2 | L-2₹59.4 Cr+₹2.7 Cr (4.77%)Rejected-Finance VILLAGE FAZALPUR BEHIND FOCAL POINT JALANDHAR | JALANDHAR | JALANDHAR | PUNJAB | L-2 | Rejected-Finance Not found L-1 | |
| 3 | L-3₹60.3 Cr+₹3.6 Cr (6.29%)Rejected-Finance | L-3 | Rejected-Finance Not found L-1 | |
| 4 | L-4₹61.9 Cr+₹5.2 Cr (9.09%)Rejected-Finance SCO 36 SECTOR 7 C MADHYA MARG CHANDIGARH 160019 | CHANDIGARH | CHANDIGARH | CHANDIGARH | 160019 | L-4 | Rejected-Finance Not found L-1 | |
| 5 | L-5₹62.9 Cr+₹6.2 Cr (10.9%)Rejected-Finance | L-5 | Rejected-Finance Not found L-1 |
Tender Value
₹70.9 Cr
EMD Value
₹71.7 L
Closing Date
2 Aug 2025, 10:00 amClosed
Executive Engineer Jal Shakti Divn Haroli
Executive Engineer Jal Shakti Divn Haroli
Construction of Lift Irrigation Scheme Beet Area Phase-II in Tehsil Haroli District Una (HP).
2025_HPIPH_109649_1
No. JSV-Haroli-TA-E-tender/2025- 3592-3620 dt 07-07-2025
Open Tender
Civil Works
Item Rate
547 days
C/O LIS Beet Area Phase-II in Tehsil Distt Una HP
as per NIT
11 documents required · 11 mandatory
₹10,000
Yes
₹71.7 L
Shimla
4 Feb 2026
7 Jul 2025
2 Aug 2025
7 Jul 2025
2 Aug 2025
7 Jul 2025
7 Jul 2025 - 2 Aug 2025
15 Jul 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.01 | SCHEDULE-1:- | - | - | - | - |
| 1 | Excavation in foundation and trenches up to all depths and in all classification of earth work such as Pick work, Jumper work, chiselling or wedging out of soft and hard rock as blasting is prohibited, saturated soil including bailing or pumping out of water, including cutting of bitumenous/concrete surface wherever required, in all lifts including trimming and dressing of sides, levelling of beds to correct grade including shoring, strutting , planking, timbering and dewatering where ever required. Stacking usable and unusable material /soil seperataly and after laying, jointing and testing of pipes (for pipes, Pipe duct, chambers, x-sings etc.), returning the usable soil in 15cm layers by ramming and watering and then disposing of all surplus excavated soil/ unusable material as directed within all leads/ lifts and including cost of diversion for traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects within all leads and lifts as per direction of the Engineer-in-charge. | 99,274.32 | Cum | - | - |
| 2 | Excavation in foundation for digging well in dry excavation from G.L.upto the level,where well curb is placed from natural surface to 1.50 metre depth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 1,995.21 | Cum | - | - |
| 3Earthwork in excavation by mechanical means(Hydraulic excavator/manual means) complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | |||||
| 3.01 | From spring level to 10 mtr depth | 3,297.96 | Cum | - | - |
| 3.02 | Lowering of well curb complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 101.88 | Qtl. | - | - |
| 4 | Providing and laying cement concrete 1:6:12 (1cement : 6 sand : 12 graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 8.13 | Cum | - | - |
| 5 | Providing and laying cement concrete 1:5:10 ( 1 cement,5sand,10 graded stone aggregate 40 mm nominal size )and curing complete excluding cost of form work in foundation and plinth with in all leads and lifts complete in all respect. | 50.96 | Cum | - | - |
| 6 | Providing and laying cement concrete 1:4:8(1cement:4sand :8graded stone aggregate 40mm nominal size) and curing complete excluding cost of form work in foundation and plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 67.52 | Cum | - | - |
| 7 | Providing & laying cement concrete 1:3:6 (1cement : 3 sand : 6 graded stone aggregate40 mm nominal size) (minimum M-10) excluding the cost of centring & shuttering in Foundation & plinth complete in all respect within all leads and lifts and to the entire satisfaction as per the directions of Engineer-in-Charge. | 87.32 | Cum | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_160093.xls
BOQ • 0.67 MB
175069517.pdf
Tender Documents • 0.32 MB
175069518.pdf
Tender Documents • 2.48 MB
175069519.pdf
Tender Documents • 0.35 MB
175069520.pdf
Tender Documents • 0.17 MB
175069521.pdf
Tender Documents • 0.26 MB
175069523.html
Tender Documents • 0.07 MB
176489399.pdf
Tender Documents • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .