| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.5 LAccepted-AOC | ₹7.5 L | L1 | Accepted-AOC L1 |
| 2 | L2₹7.7 L+₹22,050.24 (2.95%)Rejected-Finance | ₹7.7 L+₹22,050.24 (2.95%) | L2 | Rejected-Finance L2 |
| 3 | L3₹8.0 L+₹49,677.51 (6.65%)Rejected-Finance | ₹8.0 L+₹49,677.51 (6.65%) | L3 | Rejected-Finance L3 |
| 4 | L4₹8.0 L+₹49,776.88 (6.67%)Rejected-Finance | ₹8.0 L+₹49,776.88 (6.67%) | L4 | Rejected-Finance L4 |
| 5 | L5₹8.0 L+₹49,777.09 (6.67%)Rejected-Finance | ₹8.0 L+₹49,777.09 (6.67%) | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | SARATHA & CO L11 | M JEGAN L4 | RENGAMMAL CONTRACTOR L5 | M RAVICHANDRAN L3 | A CHANDRU L8 | KARTHIKEYAN C L9 | P SEKAR L7 | A NALLATHAMBI L13 | G KULANDAIVELU L10 | BALAKRISHNAN A L14 | PALANIAPPAN MADHAVAN L12 | P.LAKSHMI WORKS CONTRACTOR L1 | MARI and CO L6 | S SOPHIYA MONICA L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Providing Paver Block road in Frond of PHC & BPHU Building at Sembanur Village in Sembanur Panchayat | |||||||||||||||||
| 2.00 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 8.04 | M3 | 206 ₹1,656.24 | 105.5 ₹848.22 | 105.52 ₹848.38 | 105.51 ₹848.3 | 105.51 ₹848.3 | 106.17 ₹853.61 | 105.5 ₹848.22 | 250 ₹2,010 | 106.83 ₹858.91 | 119.36 ₹959.65 | 204 ₹1,640.16 | 98.9 ₹795.16 Lowest | 105.51 ₹848.3 | 190 ₹1,527.6 |
| 3.00 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 6.41 | M3 | 4,494.2 ₹28,807.82 | 4,700.6 ₹30,130.85 | 4,700.38 ₹30,129.44 | 3,720 ₹23,845.2 Lowest | 4,646.05 ₹29,781.18 | 4,685.84 ₹30,036.23 | 4,701.2 ₹30,134.69 | 4,800 ₹30,768 | 4,759.4 ₹30,507.75 | 5,267.93 ₹33,767.43 | 5,100 ₹32,691 | 4,406.61 ₹28,246.37 | 4,700.64 ₹30,131.1 | 4,900 ₹31,409 |
| 4.00 | Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.74 | M3 | 5,522 ₹81,394.28 | 5,739.1 ₹84,594.33 | 5,738.88 ₹84,591.09 | 5,320 ₹78,416.8 Lowest | 5,682.7 ₹83,763 | 5,730.89 ₹84,473.32 | 5,739.9 ₹84,606.13 | 6,200 ₹91,388 | 5,810.94 ₹85,653.26 | 6,442.81 ₹94,967.02 | 5,550 ₹81,807 | 5,380.21 ₹79,304.3 | 5,739.2 ₹84,595.81 | 5,700 ₹84,018 |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane | 128.14 | M2 | 433 ₹55,484.62 | 219 ₹28,062.66 | 218.99 ₹28,061.38 | 219 ₹28,062.66 | 438 ₹56,125.32 | 220.37 ₹28,238.21 | 219 ₹28,062.66 | 350 ₹44,849 | 221.74 ₹28,413.76 | 247.74 ₹31,745.4 | 402 ₹51,512.28 | 205.3 ₹26,307.14 Lowest | 219 ₹28,062.66 | 360 ₹46,130.4 |
| 6.00 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers w | 66.43 | M3 | 2,433 ₹1,61,624.19 | 2,429 ₹1,61,358.47 | 2,428.89 ₹1,61,351.16 | 2,583.54 ₹1,71,624.56 | 2,217.36 ₹1,47,299.22 | 2,480 ₹1,64,746.4 | 2,429.91 ₹1,61,418.92 | 2,400 ₹1,59,432 | 2,459.37 ₹1,63,375.95 | 2,864.36 ₹1,90,279.43 | 2,519 ₹1,67,337.17 | 2,277.04 ₹1,51,263.77 | 2,429.01 ₹1,61,359.13 | 1,500 ₹99,645 Lowest |
| 7.00 | Flooring with Paver block with Interlocking precast cc blocks of 60 mm thickness as per standard specification | 664.35 | M2 | 568 ₹3,77,350.8 | 556.75 ₹3,69,876.86 | 556.77 ₹3,69,890.15 | 559.93 ₹3,71,989.5 | 539.62 ₹3,58,496.55 | 559.42 ₹3,71,650.68 | 556.83 ₹3,69,930.01 | 636 ₹4,22,526.6 | 563.77 ₹3,74,540.6 | 628.91 ₹4,17,816.36 | 600 ₹3,98,610 | 521.97 ₹3,46,770.77 Lowest | 556.81 ₹3,69,916.72 | 585 ₹3,88,644.75 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 1,27,137 ₹1,27,137 | 1,21,477 ₹1,21,477 | 1,21,477 ₹1,21,477 | 1,21,462 ₹1,21,462 | 1,21,736 ₹1,21,736 | 1,22,400 ₹1,22,400 | 1,21,500 ₹1,21,500 | 1,35,175 ₹1,35,175 | 1,23,003 ₹1,23,003 | 1,38,516 ₹1,38,516 | 1,32,048 ₹1,32,048 | 1,13,884 ₹1,13,884 Lowest | 1,21,484 ₹1,21,484 | 1,17,247 ₹1,17,247 |
Tender Value
₹10.1 L
EMD Value
₹10,100
Closing Date
21 Aug 2026, 3:00 pmClosed
Special Officer
Union Office,Kallal
Providing Paver Block road in Frond of PHC and BPHU Building at Sembanur Village in Sembanur Panchayat
2026_RDTN_692505_1
SembanurPaverBlock
Open Tender
Civil Works
Item Rate
180 days
Sembanur
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,100
Yes
28 Aug 2026
8 Aug 2026
21 Aug 2026
8 Aug 2026
21 Aug 2026
8 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Paver Block road in Frond of PHC & BPHU Building at Sembanur Village in Sembanur Panchayat | - | - | - | - |
| 2 | Earth work excavation for pavement & drain in all soils and sub soils and to full depth as may be directed except rock requiring blasting but inclusive of shoring strutting and baling out water wherever necessary etc., complete. | 8.04 | M3 | - | - |
| 3 | Cement concrete 1:4:8 (One cement four sand and eight aggregate) using 40mm gauge hard broken granite stone including all incidental charges, dewatering if found necessary etc., complete. | 6.41 | M3 | - | - |
| 4 | Cement concrete 1:2:4mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.74 | M3 | - | - |
| 5 | Supplying and erecting centering shuttering including necessary supports for plane | 128.14 | M2 | - | - |
| 6 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers w | 66.43 | M3 | - | - |
| 7 | Flooring with Paver block with Interlocking precast cc blocks of 60 mm thickness as per standard specification | 664.35 | M2 | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_832645.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
SembanurPaverBlock.pdf
Tender Documents • 1.05 MB
BOQ_832645.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .