Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.2 LAccepted-Finance | L1 | Accepted-Finance Rate quoted is lowest | |
| 2 | L2₹6.0 L+₹2.8 L (86.4%)Accepted-Finance | L2 | Accepted-Finance Rate quoted is second lowest | |
| 3 | L3₹6.2 L+₹3.0 L (93.1%)Accepted-Finance | L3 | Accepted-Finance Rate quoted is third lowest | |
| 4 | L4₹6.3 L+₹3.1 L (96.0%)Accepted-Finance | L4 | Accepted-Finance Rate quoted is highest |
Tender Value
₹6.0 L
EMD Value
₹7,000
Closing Date
18 Sept 2023, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer
SE ETC Sultanpur 400KV S/S Campus Payagipur Sultanpur
CENTRIFUGING OF TRANSFORMER OIL INCLUDING OTHER ASSOCIATED WORKS OF 50MVAR REACTOR OF 400KV OBRA LINE AT 400KV S/s SULTANPUR UNDER ELECTY. 400KV S/s DIVISION, SULTANPUR
2023_UPTCL_831249_2
T.No. 24/ETCS/2023-24
Open Tender
Electrical Works
Item Wise
15 days
Sultanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹826
SE ETC Sultanpur
₹7,000
22 Sept 2023
12 Sept 2023
18 Sept 2023
12 Sept 2023
18 Sept 2023
12 Sept 2023
Amount
Safe loading of Transformer oil Drum (50KL) on truck/trailers at 400KV S/S Sarojninagar, Lucknow and carriage to 400KV S/S Sultanpur and its unloading and stacking work. Distance approx 150KM
Drain out of complete oil from 50 MVAR Obra Line Reactor in 209 Ltr. Capacity Oil drums and their shifting to storage place
Complete evacuation of air of the 50 MVAR reactor main tank and filling Dry Air of deo point -50°C are better in vacuum up to pressure of 0.25Kg/Cm2 and the again evacuating the Transformer tank after required time interval (approx. 12/24 Hrs) and filling of dry Air of due point -50°C are better dry air cycle. The work shall including connecting pipe of machine as required measuring due point values of Dry Air after every cycle till the required value is achieved. (Dry air plant and other related equipments to be provided by the contractor including its to and fro transportation)
Create the vaccum inside the 50MVAR Reactor before filling the transformer oil and maintain it for 24 Hrs. filling the oil step by step in 50MVAR reactor.
Filling the Transformer oil in oil tank its centrifuging up to required BDV.
Centrifuging of transformer oil of main tank, Radiator tank, Conservator tank, taking IR value at a period of 4 hrs. with BDV value at a period of 12 hrs. till satisfactory results are obtained. Labour, T&P, Centrifuging Technician and Centrifuging machine shall be provided by contactor at his own cost. However Electricity supply for the centrifuging machine shall be provided by M/s UPPTCL free of cost.
Testing of Centrifuged T/F oil from Govt. approved Laboratery, of 50MVAR Reactor including collection of oil sample from site with all necessary labour and T&P before & after centrifuging of T/F oil.
Water Content
Dielectric Dissipation Factor.
Gupta Elect and Engg Works
Meena Elect & Engg. Works
Preeti Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .