Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAdmitted-Finance | ₹7.7 L | L1 | Admitted-Finance |
| 2 | L2₹8.5 L+₹84,351 (11.0%)Admitted-Finance | ₹8.5 L+₹84,351 (11.0%) | L2 | Admitted-Finance |
| 3 | L3₹11.2 L+₹3.5 L (45.1%)Admitted-Finance | ₹11.2 L+₹3.5 L (45.1%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S AFZAL ENTERPRISES, SITAPUR L3 | M/S MAA SHEETLA ENTERPRISES L1 | M/S PRAVEEN KUMAR PANDEY L2 |
|---|---|---|---|---|---|---|
| 1.00For 11 KV Line with T/F and LT Line Shifting Kuchlai to Rasoolpur .The following works involves. | ||||||
| 1.01 | Supply of Nut Bolt with washer off size | 50 | kg | 240 ₹12,000 | 200 ₹10,000 Lowest | 220 ₹11,000 |
| 1.02 | Supply of IPC Connector For ABC | 160 | No. | 300 ₹48,000 | 200 ₹32,000 Lowest | 245 ₹39,200 |
| 1.03 | Supply of Distribution Box Clamp | 37 | No. | 320 ₹11,840 | 220 ₹8,140 Lowest | 245 ₹9,065 |
| 1.04 | Supply of Stay Insulator | 35 | No. | 100 ₹3,500 | 45 ₹1,575 Lowest | 60 ₹2,100 |
| 1.05 | Supply of Holding Clamp for Round Pole | 18 | No. | 320 ₹5,760 | 220 ₹3,960 Lowest | 245 ₹4,410 |
| 1.06 | Supply of LTMS Clamp for PCC Pole | 60 | No. | 320 ₹19,200 | 220 ₹13,200 Lowest | 265 ₹15,900 |
| 1.07 | Supply of Danger Board with Clamp | 46 | No. | 461 ₹21,206 | 450 ₹20,700 Lowest | 461 ₹21,206 |
| 1.08 | Supply of F Clamp For ST Pole | 9 | No. | 400 ₹3,600 | 245 ₹2,205 Lowest | 250 ₹2,250 |
| 1.09 | Supply of Barbed Wire | 92 | kg | 300 ₹27,600 | 200 ₹18,400 Lowest | 220 ₹20,240 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
12 Jun 2026, 5:00 pmClosed
SE EDC SITAPUR
sitapur
42/EDCS/2026-27
2026_MVVNL_1155702_1
42/EDCS/2026-27
Open Tender
Electrical Works
Item Rate
120 days
sitapur
as per tender notice norms
2 documents required · 2 mandatory
₹1,180
SE EDC SITAPUR
₹8,000
20 Jun 2026
30 May 2026
13 Jun 2026
30 May 2026
12 Jun 2026
30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1For 11 KV Line with T/F and LT Line Shifting Kuchlai to Rasoolpur .The following works involves. | |||||
| 1.01 | Supply of Nut Bolt with washer off size | 50 | kg | - | - |
| 1.02 | Supply of IPC Connector For ABC | 160 | No. | - | - |
| 1.03 | Supply of Distribution Box Clamp | 37 | No. | - | - |
| 1.04 | Supply of Stay Insulator | 35 | No. | - | - |
| 1.05 | Supply of Holding Clamp for Round Pole | 18 | No. | - | - |
| 1.06 | Supply of LTMS Clamp for PCC Pole | 60 | No. | - | - |
| 1.07 | Supply of Danger Board with Clamp | 46 | No. | - | - |
| 1.08 | Supply of F Clamp For ST Pole | 9 | No. | - | - |
| 1.09 | Supply of Barbed Wire | 92 | kg | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.86 MB
emd.pdf
Tender Documents • 2.84 MB
BOQ_2165089.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .