| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.1 CrAccepted-Finance | ₹22.1 Cr | L1 | Accepted-Finance Lowest bidder |
| 2 | L2₹25.4 Cr+₹3.4 Cr (15.4%)Accepted-Finance PLOT 09 SECTOR 155 NOIDA GAUTAM BUDDHA NAGAR UTTAR PRADESH 201310 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201310 | ₹25.4 Cr+₹3.4 Cr (15.4%) | L2 | Accepted-Finance 2nd Lowest bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical Techno-commercial requirements not complied |
| Sl No | Description | Qty | Unit | NEC ENERGY PRIVATE LIMITED L1 | Nelumbo Technologies Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00DIVERSION WEIR | |||||
| 1.01 | Excavating trenches of required width for pipes cables etc | 72.8 | Meter | 2,097.02 ₹1,52,663.06 Lowest | 2,334.82 ₹1,69,974.9 |
| 1.02 | Providing and fixing RCC Pipe NP4 (1000mm dia) | 72.8 | Meter | 16,445.13 ₹11,97,205.46 Lowest | 18,310.04 ₹13,32,970.91 |
| 1.03 | Earth work in excavation (Ordinary rock) | 1,804.58 | cum | 571.42 ₹10,31,173.1 Lowest | 636.22 ₹11,48,109.89 |
| 1.04 | Providing 100 mm thick soiling with quality stone | 80.87 | cum | 5,121.53 ₹4,14,162.77 Lowest | 5,702.32 ₹4,61,129.51 |
| 1.05 | Providing and laying CC 1:3:6 in foundation and footing | 808.67 | cum | 10,974.84 ₹88,75,023.86 Lowest | 14,315.13 ₹1,15,76,216.18 |
| 1.06 | Providing and laying RCC 1:1.5:3 in foundation upto plinth | 756.08 | cum | 13,056.96 ₹98,72,106.32 Lowest | 15,612 ₹1,18,03,920.96 |
| 1.07 | RCC work in columns of proportion 1:1.5:3 | 1.01 | cum | 12,660.81 ₹12,787.42 Lowest | 14,096.57 ₹14,237.54 |
| 1.08 | RCC work in Beams and slabs | 7.76 | cum | 15,087.2 ₹1,17,076.67 Lowest | 16,798.12 ₹1,30,353.41 |
| 1.09 | Tor steel reinforcement for RCC work | 18,958.87 | Kg | 109.36 ₹20,73,342.02 Lowest | 121.76 ₹23,08,432.01 |
Tender Value
Refer Docs
EMD Value
₹37 L
Closing Date
14 Oct 2025, 11:00 amClosed
Chief Engineer Transmission and Generation
Electricity House, Power Department, Lower A.G Colony
Design, Manufacture, Construction, Testing and Commissioning of 1.5MW Dzuna SHP with associated Civil and Electromechanical Works
2025_DP_784_1
CEL/TB/CIVIL/DZUNA/175
Open Tender
Power/Energy Projects/Products
Turn-key
730 days
Dzuna, Jotsoma
Please refer Tender documents.
2 documents required · 2 mandatory
₹30,000
Chief Engineer T and G
₹37 L
22 Oct 2025
12 Sept 2025
14 Oct 2025
12 Sept 2025
14 Oct 2025
18 Sept 2025
12 Sept 2025 - 18 Sept 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1DIVERSION WEIR | |||||
| 1.01 | Excavating trenches of required width for pipes cables etc | 72.8 | Meter | - | - |
| 1.02 | Providing and fixing RCC Pipe NP4 (1000mm dia) | 72.8 | Meter | - | - |
| 1.03 | Earth work in excavation (Ordinary rock) | 1,804.58 | cum | - | - |
| 1.04 | Providing 100 mm thick soiling with quality stone | 80.87 | cum | - | - |
| 1.05 | Providing and laying CC 1:3:6 in foundation and footing | 808.67 | cum | - | - |
| 1.06 | Providing and laying RCC 1:1.5:3 in foundation upto plinth | 756.08 | cum | - | - |
| 1.07 | RCC work in columns of proportion 1:1.5:3 | 1.01 | cum | - | - |
| 1.08 | RCC work in Beams and slabs | 7.76 | cum | - | - |
| 1.09 | Tor steel reinforcement for RCC work | 18,958.87 | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_911.xls
BOQ • 0.60 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .