Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.0 LAccepted-AOC AT KENDUGADA NILAKAMBERU P S ORKEL DIST MALKANGIRI PIN 764051 ODISHA | KENDUGADA | MALKANGIRI | ODISHA | 764051 | ₹42.0 L | L1 | Accepted-AOC Selected in Transparent Lottery |
| 2 | Rejected-Technical AT BATIMARA PO BIRIDI ROAD PS BIRIDI DIST JAGATSINGHPUR 754111 | BIRIDI | JAGATSINGHPUR | ODISHA | 754111 | - | - | Rejected-Technical Not Selected in Transparent Lottery |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Selected in Transparent Lottery |
Tender Value
₹49.4 L
EMD Value
₹49,430
Closing Date
29 Dec 2025, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, MALKANGIRI
Construction of 2 Nos of D Type Quarters of Tahasil office at Chitrakonda for the year 2025-26 in the District of Malkangiri
2025_CERWI_123350_1
06/RWD-I,MKG/2025-26
Open Tender
Civil Works - Buildings
180 days
Malkangiri
2 documents required · 2 mandatory
₹6,000
₹49,430
Yes
21 Jan 2026
17 Dec 2025
30 Dec 2025
17 Dec 2025
29 Dec 2025
17 Dec 2025
17 Dec 2025 - 26 Dec 2025
Earth work in excavation of foundation trenches in all type of soil including dressing of sides and levelling the bed up to the required depth and depositing the excavated materials away from the work site within 50m initial lead & 1.5m initial lifts with sundries & T&P required for the work complete including cost of all labour,cess,T&P,sundries etc. as directed by the Engineer in charge.
Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge.
Supplying of filling sand in foundation and plinth including watering,ramming, consolidating and dressing, labours, tools, taxes etc., all complete as per the specification and direction of Engineer-In-Charge.
Cement Concrete (1:3:6) using 4cm size hard granite C.B. metal approved quality from approved quarry including cost, carriage, royalty, cost of all labour. etc complete as per the specification and direction of Engineer-In-Charge..(A.R.-2006, Page No - 43, Item No. - 3)
Providing and laying plain cement concrete 1:4:8 (1 cement : 4 sand : 8 stone agregate 40mm nominal size) as levelling course in floor and plinth including tempering, curring, shuttering etc. complete all depth and height including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge
First class Fly ash Brick masonry using bricks of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per. Sqr. Cm. in cement mortar of mix( 1:6) with ordinary Portland slag cement(PSC) and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Foundation & Plinth including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-Charge.
Fly Ash. brick masonry(in Ground Floor) of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge
Fly Ash. brick masonry(in Terrace Floor) of size 23 cm. x 11 cm. x 8 cm. having crushing strength not less than 75 kg. Per Sqr. Cm. in cement mortar of mix (1:6) with approved grade cement and screened & washed sand for mortar after immersing the bricks for 6 (Six) hours in water before use in Superstructure including splays cutting, circular moulding, corbelling, chamfering and similar such type of works, watering and curing etc. including cost, conveyance, loading, unloading, royalties and taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge
Brick work with Fly ash Bricks 25cm x 12cm x 8cm size having crushing strength not less than 75Kg/cm2 with dimensional tolerance ±2 percent in cement mortar (1:4) in Superstructure including watering curing, cost of carriage and royalty of all materials, taxes of all materials, cost of all labour, scaffolding, sundries, T&P required for the works etc. complete in all respect as directed by the Engineer-in-charge
RCC work M-25 grade (in Footings) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Column up to Plinth) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Plinth Beam) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Column up to First Floor) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Lintel Beam GF) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Chajjas GF) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Roof Beam GF) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper position as per direction of the Engineer in charge
RCC work M-25 grade (in Roof Slab GF) as per approved designs and drawings having a minimum compressive strength (in work test) 25 N. / Square mm. in 15 cm. cubes at 28 days after mixing and test conducted in accordance with I.S. 456 and I.S. 516 using 12 mm. to 20 mm. size black hard crusher broken granite stone chips and screened and washed sharp sand for mortar of approved quality from approved quarry, washed and cleaned (20 mm. size chips not to exceed 25 % ) to be mixed in concrete mixture with approved grade cement including hoisting, lowering, laying and compacting concrete by using vibrators, watering and curing for 28 days, centring and shuttering and finishing the exposed surface smooth providing grooves or beads wherever necessary including cost, conveyance, loading, unloading, royalties and taxes of all materials and cost of all labours, sundries, T&P, required for the work etc. complete in all respect but excluding cost and conveyance of M.S. rods or Tor steel and binding wires and labour charges for straightening, cutting, bending etc. of M.S. rods or Tor steel tying the grills and placing in proper posi
INR Three Lakh Sixty Nine Thousands Nine Hundred Seventy One and Paise Forty Eight Only
INR Twelve Lakhs Forty Eight Thousands Two Hundred Eighty Four and Paise Fifty Two Only
INR Fifty Six Thousands Nine Hundred Thirty Seven and Paise Ninety Three Only
INR Eighteen Thousands Eight Hundred Eight and Paise Forty Six Only
INR One Lakh Thirty Four Thousands Seven Hundred Seventy Six and Paise Twenty Four Only
INR Forty Two Thousands Five Hundred Five and Paise Eighty Four Only
INR Two Lakh Three Hundred Eighty Four and Paise Seventy Only
INR Sixty Two Thousands Ninety Nine and Paise Four Only
INR One Lakh Three Thousand Six Hundred Ninety Eight and Paise Seventy Two Only
INR Three Lakh Forty Nine Thousands Five Hundred Three and Paise Sixty Six Only
INR Thirty Eight Thousands Eight Hundred Eighty Four and Paise Twenty Three Only
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.PDF
finance_572039.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_3.pdf
PDF • 0.18 MB
Tendernotice_2.pdf
PDF • 0.69 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_572039.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid