Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC Lowest Value. | |
| 2 | L2₹5.8 L+₹19,152.98 (3.39%)Rejected-Finance | L2 | Rejected-Finance Higher Value. | |
| 3 | L3₹5.9 L+₹26,403.33 (4.67%)Rejected-Finance | L3 | Rejected-Finance Higher Value. | |
| 4 | L4₹5.9 L+₹28,759.69 (5.08%)Rejected-Finance | L4 | Rejected-Finance Higher Value. | |
| 5 | L5₹6.0 L+₹29,363.88 (5.19%)Rejected-Finance | L5 | Rejected-Finance Higher Value. |
Tender Value
₹6.0 L
EMD Value
₹12,084
Closing Date
25 Jan 2019, 6:00 pmClosed
Office of the Executive Engineer,Tamluk Division,
Office of the Executive Engineer,Tamluk Division, P.H.Engg. Dte.P.H.E. Complex 1st floor, Parbatipur,Tamluk, Purba Medinipur 721636
Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with water supply sanitary arrangement as per Deptt. drawing at Head work site of Dona zone II Water Supply Scheme under Tamluk Sub Division of Tamluk Division, PHE Dte.
2019_PHED_207406_2
WBPHED/EE/TD/NIeT_20/2018-2019
Open Tender
CIVIL WORKS
Percentage
75 days
Moyna Block
Please refer Tender documents.
5 documents required · 5 mandatory
₹12,084
Office of the Executive Engineer,Tamluk Division,
7 Jan 2020
14 Jan 2019
28 Jan 2019
14 Jan 2019
25 Jan 2019
16 Jan 2019
16 Jan 2019
eProcurement System of Government of West Bengal Created By: SAMIRAN DAS Created Date/Time: 25-Feb-2019 02:18 PM Tender Title: WBPHED/EE/TD/NIeT_20/2018-2019 Tender ID: 2019_PHED_207406_2
Tender Inviting Authority: EXECUTIVE ENGINEER, TAMLUK DIVISION, PHE DTE.
Name of Work: Construction of 5.40 Mtr. X 3.60 Mtr. Switch Room cum Chlorine Room with water supply & sanitary arrangement (as per Deptt. drawing) at Head work site of Dona zone-II Water Supply Scheme under Tamluk Sub- Division of Tamluk Division, PHE Dte. Purba Medinipur.
Contract No: WBPHED/EE/TD/NIeT-20/2018-2019 (Sl No. - 02)
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 LITTLE ENGINEERS CO-OPERATIVE SOCIETY LTD. 604195.15 1.00 610237.10 Six Lakh Ten Thousand Two Hundred and Thirty Seven
2.00 PURNA CHANDRA BARH 604195.15 -3.19 584921.32 Five Lakh Eighty Four Thousand Nine Hundred and Twenty One
3.00 SAYAKA CONSTRUCTION 604195.15 2.50 619300.03 Six Lakh Ninteen Thousand Three Hundred
4.00 HARIPADA PATTANAYAK 604195.15 1.90 615674.86 Six Lakh Fifteen Thousand Six Hundred and Seventy Four
5.00 ALPHA ENGINEERS CO-OPERATIVE SOCIETY LTD 604195.15 2.00 616279.05 Six Lakh Sixteen Thousand Two Hundred and Seventy Nine
6.00 ZENITH CONSTRUCTION 604195.15 -6.36 565768.34 Five Lakh Sixty Five Thousand Seven Hundred and Sixty Eight
7.00 MRITYUNJAY PARIA 604195.15 -1.60 594528.03 Five Lakh Ninty Four Thousand Five Hundred and Twenty Eight
8.00 ANIRUDDHA BAG 604195.15 -1.50 595132.22 Five Lakh Ninty Five Thousand One Hundred and Thirty Two
9.00 SAYANDEEP PYNE 604195.15 -1.99 592171.67 Five Lakh Ninty Two Thousand One Hundred and Seventy One
Lowest Amount Quoted BY: ZENITH CONSTRUCTION(565768.34)
BOQ Summary Details Tender Title: WBPHED/EE/TD/NIeT_20/2018-2019 Tender ID: 2019_PHED_207406_2
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 ZENITH CONSTRUCTION 565768.34 L1
2 PURNA CHANDRA BARH 584921.32 L2
3 SAYANDEEP PYNE 592171.67 L3
4 MRITYUNJAY PARIA 594528.03 L4
5 ANIRUDDHA BAG 595132.22 L5
6 LITTLE ENGINEERS CO-OPERATIVE SOCIETY LTD. 610237.10 L6
7 HARIPADA PATTANAYAK 615674.86 L7
8 ALPHA ENGINEERS CO-OPERATIVE SOCIETY LTD 616279.05 L8
9 SAYAKA CONSTRUCTION 619300.03 L9
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .