| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹55.1 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹69.0 L+₹13.9 L (25.1%)Rejected-Finance | L-2 | Rejected-Finance L-2 | |
| 3 | L-3₹70.0 L+₹14.8 L (26.9%)Rejected-Finance | L-3 | Rejected-Finance L-3 | |
| 4 | Not Admitted-Fee/PreQual/Technical MOHALLA SARASWATI NAGAR DISTRICT BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | SHASHANK SINGH L3 | M/S SHREE ANSH CONSTRUCTION L2 | MAHIPAL PANDEY L1 |
|---|---|---|---|---|---|---|
| 1.00Bed Lining work | ||||||
| 1.01 | Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal. | 648 | M3 | 60 ₹38,880 Lowest | 70 ₹45,360 | 129.79 ₹84,103.92 |
| 1.02 | Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 805 | M3 | 100 ₹80,500 | 55 ₹44,275 Lowest | 250 ₹2,01,250 |
| 1.03 | Dismentling of R.C.C. (M15) in flooring including stacking of scraped material within 60 m including T&P and labour charges etc. | 141.75 | M3 | 600 ₹85,050 | 75 ₹10,631.25 Lowest | 750 ₹1,06,312.5 |
| 1.04 | Laying C.C. M-10 below foundation including cost of all lead lift material, labour T&P etc. | 11.88 | M3 | 11,400 ₹1,35,432 | 11,800 ₹1,40,184 | 9,000 ₹1,06,920 Lowest |
| 1.05 | S/L LDPE 200 Micron thick Polythene below CC lining | 1,890 | M2 | 10 ₹18,900 Lowest | 16 ₹30,240 | 40 ₹75,600 |
| 1.06 | Laying C.C. 1:1.5:3 (M-20) in Lining with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc. | 302.22 | M3 | 12,351 ₹37,32,719.22 | 11,800 ₹35,66,196 | 8,000 ₹24,17,760 Lowest |
| 1.07 | Centering & shuttering including cost of all complete. | 329.25 | M2 | 1,000 ₹3,29,250 | 650 ₹2,14,012.5 Lowest | 800 ₹2,63,400 |
| 1.08 | Laying C.C. 1:2:4 (M-15) in Toe wall and below wing wall with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc. | 53.14 | M3 | 12,000 ₹6,37,680 | 11,800 ₹6,27,052 | 10,000 ₹5,31,400 Lowest |
| 1.09 | S/L of Local sand Below Lining as filter media | 189 | M3 | 1,000 ₹1,89,000 | 45 ₹8,505 Lowest | 1,000 ₹1,89,000 |
Tender Value
₹74.6 L
EMD Value
₹1.5 L
Closing Date
20 Jan 2026, 1:00 pmClosed
SUPERINTENDING ENGINEER
Rapti Nahar Nirman Mandal 1 Balrampur
As Per Tender Notice
2025_UPIDC_1099616_2
07/SE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Tulsipur Balrampur
As Per Tender Notice
2 documents required · 2 mandatory
₹2,354
₹1.5 L
Yes
28 Jan 2026
10 Jan 2026
21 Jan 2026
10 Jan 2026
20 Jan 2026
10 Jan 2026
Earth work in excavation of foundation including cost digging & refilling the trenches with its proper disposal.
Earth work in making coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
Dismentling of R.C.C. (M15) in flooring including stacking of scraped material within 60 m including T&P and labour charges etc.
Laying C.C. M-10 below foundation including cost of all lead lift material, labour T&P etc.
S/L LDPE 200 Micron thick Polythene below CC lining
Laying C.C. 1:1.5:3 (M-20) in Lining with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.
Centering & shuttering including cost of all complete.
Laying C.C. 1:2:4 (M-15) in Toe wall and below wing wall with crushed stone grit size 20-40 mm and chopan coarse sand and including cost of all lead lift material, labour T&P etc.
S/L of Local sand Below Lining as filter media
S/L 40-60 Kg boulder for pitching including cost of all lead, lift, material, labour, T&P etc.
Dewatering including cost of all Pumps lead lift material labour T&P etc
Cutting bending and binding of steel bar for reinforcement including cost of lead and lift etc..
Earth work for removing coffer dam by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.21 MB
BOQ_2038880.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .