| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC R O HOUSING COLONY LEH | LEH LADAKH | LADAKH | 194101 | L1 | Accepted-AOC Found lowest one bidder | |
| 2 | L2₹9.4 L+₹2.4 L (34.6%)Rejected-AOC | L2 | Rejected-AOC Quoted high rate as compared to L1 | |
| 3 | L3₹9.6 L+₹2.5 L (36.2%)Rejected-AOC R O RONGO LADAKH AUTONOMOUS HILL DEVELOPMENT COUNCIL LEH | L3 | Rejected-AOC Quoted high rate as compared to L1 | |
| 4 | L4₹9.9 L+₹2.9 L (41.8%)Rejected-AOC MUDH | UDHAMPUR | JAMMU AND KASHMIR | 182101 | L4 | Rejected-AOC Quoted high rate as compared to L1 |
Tender Value
₹10 L
Closing Date
3 Oct 2022, 2:00 pmClosed
Executive Engineer
REW Leh
Construction of C Walling for public gathering center at Dungti
2022_RDD_7784_5
NIT 30 - UTL REWL 2022-23
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Payable To Executive Engineer
Exempted
27 Dec 2022
24 Sept 2022
5 Oct 2022
24 Sept 2022
3 Oct 2022
24 Sept 2022
Amount
Earth work in excavation by manual means over areas (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and sturts, etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement. 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
Centring and shuttering including strutting, propping etc. and removal of form for, Columns, piers, abutments, pillars, posts and struts.
RR- Stone masonry with hard stone from nallah laid in mud mortar in the foundation and plinth, complete.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size.
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) Crushed
15 mm Cement plaster on the rough side of sungle or half brick wall of mix: 1 : 4 ( 1 cement : 4 fine sand)
Finishing wall with water proofing cement paints required shade. New work 2 or more coat applied @ 3.84kgs/ 10 sqm.
Steel work in built up tubular round, square or rectangular including cutting , hoisting , fixing in position and applying a priming coat of approved steel primer including welding and bolting with special shaped washers etc.complete. Hot finished welded type tubes
Carriage of cement, steel and TMT-Bars at a distance of 272 km
Carriage of sand and aggregate at a distance of 20 km
Carriage of stone at a distance of 20 km
M/S LOBZANG TANBA
M/S SKALZANG DORJAI
M/S TSEWANG OTSAL
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .