Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.3 LAccepted-Finance | L1 | Accepted-Finance Being lowest bidder i.e L1 | |
| 2 | L2₹5.5 L+₹22,762 (4.32%)Accepted-Finance | L2 | Accepted-Finance Being L2 | |
| 3 | L3₹5.5 L+₹27,162 (5.15%)Accepted-Finance | L3 | Accepted-Finance Being L3 | |
| 4 | L4₹5.7 L+₹44,362 (8.41%)Accepted-Finance | L4 | Accepted-Finance Being L4 | |
| 5 | L5₹6.0 L+₹71,762 (13.6%)Accepted-Finance | L5 | Accepted-Finance Being L5 |
Tender Value
₹7.2 L
Closing Date
8 Jul 2022, 6:00 pmClosed
DFO Doda
Forest Complex Doda
Fencing work using wooden fence post with BABW, Construction of DRSM check walls and Construction of inspection path under CAMPA 2022-23
2022_FD_174941_1
e-NIT No. 03 of 2022 dated 20/06/2022
Open Tender
Civil Works
Item Rate
30 days
In comptt. 58-A and 58-B/K in Kuntwara.
Please refer Tender documents.
2 documents required · 2 mandatory
₹600
Yes
Divisional Forest Officer, Doda
Exempted
13 Jul 2022
20 Jun 2022
9 Jul 2022
20 Jun 2022
8 Jul 2022
20 Jun 2022
Amount
Fencing using wooden fence posts at spacing of 10' & 4 strands of black annealed Barbed wire The Fencing work includes cost of material, Carriage of fencing material both mechanical and head load , loading & unloading, clearance of site, digging of pits of size 1'x1'x1'6",, fixing of poles in dugout pits as per specification, stretching of black annealed Barbed wire in four strands, Painting of fence posts with emulsion paint as per approved design and its numbering, fixing of gate and sign board including painting and writing as per specification and design approved by the Divisional Forest Officer, Doda . Every 8th fence posts along straight line and every fence post at the corner be fixed in a cement concrete block of size 1'x1'x1'6" in ratio 1 cement: 3 sand: 6 stone aggregate of specified grade.
Soil and Moisture conservation works including cost, collection, carriage of stone to work site fencing/dressing of stone and preparation of bed at site ton be identifiied by the Forest staff
Construction of inspection path (2 Mtr & 1.5 Mtr width) with standard verification in comptt. 58/Kunt-A, & 58/Kunt-B of Kuntwara Range under CAMPA for the year 2022-23.
MANGTA WANI
ABDUL BARI NATNOO
KHURSHEED AHMED
farooq ahmed
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .