| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.7 LAccepted-AOC | ₹20.7 L Quoted ₹21.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹22.5 LRejected-AOC | ₹22.5 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | ASHWATH MARINE INFRA PRIVATE LIMITED |
|---|---|---|---|---|---|
| 1.00 | Providing wooden platform with scaffolding arrangement using 10 to 13cm dia Casurina posts and 40mm thick country wood planks for providing platform over the scaffolding including cost of all materials, labour, lead, lift etc., complete. | 88.59 | M2 | 24,805.2 ₹29,270.14 | 26,541.56 ₹31,319.04 |
| 2.00 | Special plastering in cm 1:3 for reinforced items including cost of materials, labours, lead, lift etc., complete. | 220.58 | M2 | 71,467.92 ₹84,332.15 | 76,470.67 ₹90,235.39 |
| 3.00 | wall Plastering with C.M 1:5, 12 mm thick including cost of all materials, labours, lead, lift, curing, etc. complete. | 554.96 | M2 | 1,56,498.72 ₹1.8 L | 1,67,453.63 ₹2.0 L |
| 4.00 | Chipping and cleaning the existing damaged plastered surface from walls rate including cost of all labour, lead, lift etc., complete. | 775.54 | M2 | 6,979.86 ₹8,236.23 | 7,468.45 ₹8,812.77 |
| 5.00 | Providing PCC 1:1.5:3 50mm thickness using OP/PP cement with 6 to 10mm chips including cost of all materials, labours, lead, lift, curing, etc. complete. | 15.92 | M3 | 1,14,624 ₹1.4 L | 1,22,647.68 ₹1.4 L |
| 6.00 | Providing RCC 1:1.5:3 50mm thickness using OP/PP cement with 12 to 20 mm BG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 2.36 | M3 | 22,325.6 ₹26,344.21 | 23,887.92 ₹28,187.75 |
| 7.00 | Dismantling the spalled / distressed RCC and loose particles from the existing concrete including roughening the surface after thorough cleaning, rate including cost of all labour, lead, lift etc., complete. | 18.28 | M3 | 83,722.4 ₹98,792.43 | 89,582.97 ₹1.1 L |
| 8.00 | Providing centering and shuttering arrangements for supporting the reinforced cement concrete surfaces rate including cost of all labour, lead, lift, tools etc., complete. | 43.82 | M2 | 45,003.14 ₹53,103.71 | 48,153.36 ₹56,820.96 |
| 9.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 165.2 | Kg | 15,198.4 ₹17,934.11 | 16,262.29 ₹19,189.50 |
| 10.00 | Providing two coats with ready mixed plastic emulsion (Interior wall) of first class quality paint and approved colour including cost of materials scaffolding charges through cleaning of surface, labours, lead, lift, curing etc. complete. | 1,556.7 | M2 | 3,48,700.8 ₹4.1 L | 3,73,109.86 ₹4.4 L |
Tender Value
Refer Docs
EMD Value
₹18,500
Closing Date
15 Oct 2025, 2:00 pmClosed
CE TTPS Thoothukudi
Office of the SE Civil TTPS Thoothukudi
Repair and Maintenance Works to the Ash Handling Plant Switch Gear Room 1
2025_EB_610082_1
CE SE C TTPS 264 2025 26
Open Tender
Civil Works - Others
120 days
Tuticorin Thermal Power Station
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹18,500
Yes
7 Apr 2026
29 Sept 2025
16 Oct 2025
29 Sept 2025
15 Oct 2025
29 Sept 2025
stage.html
html • 0.04 MB
techsummary_728974.pdf
BOQ Comparative Chart
xlsx
finsummary_728974.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_728974.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid