| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-Finance | L1 | Accepted-Finance Lower Rate | |
| 2 | L2₹7.8 L+₹16,894 (2.20%)Rejected-Finance | L2 | Rejected-Finance Higher Rate | |
| 3 | L3₹8.6 L+₹96,190 (12.5%)Rejected-Finance | L3 | Rejected-Finance Higher Rate |
Tender Value
₹8 L
EMD Value
₹10,000
Closing Date
24 Feb 2020, 1:00 pmClosed
SE, EDC-II, Mathura
Mathura Cantt, Near Kaali Mata Mandir.
shifting of 11 KV line from Gokul to chintaharan mandir.
2020_DVVNL_436456_1
51/EDC-II(M)/2019-20
Open Tender
Electrical Works
Item Rate
60 days
EDSD-Laxmi Nagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Chief Finance and Account Officer,Nagar Nigam
₹10,000
Yes
13 Sept 2021
18 Feb 2020
24 Feb 2020
18 Feb 2020
24 Feb 2020
18 Feb 2020
Amount
Safe Carriage of 9/11 Mtr Long ST Pole from 132 KV Store Center Mathura to JE Store/Substation through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-40 Kms.)
Safe Carriage of 9/11 Mtr Long ST Pole from JE Store/Substation to pit site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-15 Kms.)
Safe Carriage of 11 KV XLPE Cable size 3x120 sq.mm. Cable form Store Center Mathura/Agra to JE Store/Substation including cost of shifting of drum from inside of store, removing of cable from drum and re-rolling of extra removed cable including loading & unloading at both ends.
Safe Carriage of 11 KV XLPE Cable size 3x120 sq.mm. Cable JE Store/Substation to pit site including loading & unloading at both ends.
Safe Carriage of Line material from Store Center at 132 KV substation Mathura to the JE Store/Substation including loading and unloading of material at both ends.
Safe Carriage of Line material from JE Store/Substation to pit site, including loading and unloading of material at both ends.
Erection of 9/11 Mtr ST Pole by digging of pits without fitting of relevant accessories.
Erection of Double pole/Section pole(9/11 Mtrs ST Pole) by digging of pits with fitting of all accessories. .
Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
installation of following pole accessories as per RESPO norms (i) 11 KV cross arms ‘V’ type
(ii) 11 KV pin insulator
(iii) 11 KV pin with nut
(iv) 11 KV disc insulator
(v) Cross arms holding clamps
(VI) T channel
(vii) Dropper channel
Dismantling of old/damaged ACSR weasel conductor from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store.
Dismantling of old/damaged Raccon conductor from the existing line and its bundling and stacking in roll and send to J.E. Store/ Mathura Store.
Dismantling of PCC/STP with all accessories.
Dismantling of old/damaged Dog conductor from the existing line and laying of the same on shifted/new line.
Opening of HT/LT connections & lowering of 25 KVA T/F from D/P and shifting up to Store centre/JE Store.
Laying, sagging, stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual.
Laying of 11 KV XLPE Cable size 3x120 sq.mm. by digging in the trench/G.I pipe/HDPE pipe and re-dressing of trench after laying of XLPE Cable for proper completion of work as per direction of supervising engineer.
Jointing, connecting and commissioning of heat shrinking out door/indoor type jointing kit with H.T. cable 3 core.
Chopping of Tree branches to Clear the route properly.
Grouting of ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material.
Straighting of tilted STP of HT/LT line after opening of nozzling, digging of pit applying anti direction force for making of proper alignment of line.
Repairing/ resagging/ new guarding of HT/LT Line(span of 35-50 mtr)with GI wire as per RESPO Norms.
Safe Carriage of old PCC/STP from pit site to store center Mathura in distance range 0 to 50 km. including loading & unloading and proper stacking.
Re-sagging of loose conductor as per direction of supervising engineer. It includes the cost of labour, T & P carrier etc required for proper completion of work of HT Line.
Opening of 11KV Jumper and Rejumpering after Completion of work.
M/s S.K. Electrical Company
M/s Shri Balaji Traders
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .