| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.1 CrAccepted-AOC | ₹6.1 Cr | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹6.1 CrRejected-Finance | ₹6.1 Cr | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹6.5 CrRejected-Finance | ₹6.5 Cr | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹6.6 CrRejected-Finance | ₹6.6 Cr | L-4 | Rejected-Finance L-4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical All Bid Rejected in Technical Evaluation |
| Sl No | Description | Qty | Unit | M/S LODHI ENTERPRISES L1 | GHANARAM INFRA ENGINEERS PRIVATE LIMITED L2 | M/S VAISHNAVI CONSTRUCTION COMPANY L4 | VIVEK KUMAR SINGH THEKEDAR L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work Excavation of Foundation M.K.R. and Kanker Mixed soil including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 5,965.37 | M3 | 70 ₹4,17,575.9 | 40 ₹2,38,614.8 Lowest | 76.18 ₹4,54,441.89 | 76.18 ₹4,54,441.89 |
| 2.00 | Laying Coarse sand in foundation including all labour T & P etc. for proper completion of work. As per direction of Engineer-in-charge. | 349.72 | M3 | 2,000 ₹6,99,440 | 1,000 ₹3,49,720 Lowest | 2,082.26 ₹7,28,207.97 | 2,082.26 ₹7,28,207.97 |
| 3.00 | P.C.C. 1:3:6 in foundation with cement, Sand & 22.40-53mm Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 276.2 | M3 | 4,500 ₹12,42,900 | 3,400 ₹9,39,080 Lowest | 4,181.95 ₹11,55,054.59 | 4,181.95 ₹11,55,054.59 |
| 4.00 | R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 2,279.69 | M3 | 4,200 ₹95,74,698 Lowest | 5,200 ₹1,18,54,388 | 4,834.38 ₹1,10,20,887.74 | 4,834.38 ₹1,10,20,887.74 |
| 5.00 | Raised Struck pointing with 1:3 cement sand Morter including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 2,487.62 | Sqm | 130 ₹3,23,390.6 | 120 ₹2,98,514.4 | 109.81 ₹2,73,165.55 Lowest | 109.81 ₹2,73,165.55 Lowest |
| 6.00 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 150 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 555 | RM | 950 ₹5,27,250 | 900 ₹4,99,500 | 749.4 ₹4,15,917 Lowest | 749.4 ₹4,15,917 Lowest |
| 7.00Centering and Shuttering including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge | |||||||
| 7.10 | For Plain CC work including all material & T&P | 5,241.11 | Sqm | 300 ₹15,72,333 | 300 ₹15,72,333 | 256.5 ₹13,44,344.72 Lowest | 256.5 ₹13,44,344.72 Lowest |
| 7.20 | For RCC slab, Lintels & simple beam including all material & T&P | 569.52 | Sqm | 500 ₹2,84,760 | 500 ₹2,84,760 | 469.45 ₹2,67,361.16 Lowest | 469.45 ₹2,67,361.16 Lowest |
| 8.00 | C.C. 1:2:4 with cement coarse Sand Mortar and 10-20mm stone grit including all labour T&P etc. for proper completion of work As per Direction of Engineer-in-charge for coping. | 2,335.15 | M3 | 5,007 ₹1,16,92,096.05 | 5,300 ₹1,23,76,295 | 4,999.75 ₹1,16,75,166.21 Lowest | 4,999.75 ₹1,16,75,166.21 Lowest |
Tender Value
₹8.4 Cr
EMD Value
₹16.8 L
Closing Date
1 Jul 2026, 2:30 pmClosed
Supertending Engineer
Irrigation Work Circle Banda
Restoration Work of Kharela Rajwaha Km 0.000 to 17.850, Riwai Km 0.000 to 3.500, Santoshpura Km 0.000 to 1.390, KumhRai Km 0.000 to 2.510, Paretha II Km 0.000 to 4.500 and Punnia Alpika from km 0.000 to 3.400 In Irrigation Division Mahoba (LOT-02)
2026_UPIDC_1160582_2
04/SE/2026-27 dt 09-06-2026
Open Tender
Civil Works
Item Wise
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹16.8 L
21 Aug 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work Excavation of Foundation M.K.R. and Kanker Mixed soil including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 5,965.37 | M3 | 92.9 | ₹5,54,182.87 |
| 2 | Laying Coarse sand in foundation including all labour T & P etc. for proper completion of work. As per direction of Engineer-in-charge. | 349.72 | M3 | 2,539.34 | ₹8,88,057.98 |
| 3 | P.C.C. 1:3:6 in foundation with cement, Sand & 22.40-53mm Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 276.2 | M3 | 5,099.94 | ₹14,08,603.43 |
| - | R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 2,279.69 | M3 | 5,895.59 | ₹1,34,40,117.57 |
| 5 | Raised Struck pointing with 1:3 cement sand Morter including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 2,487.62 | Sqm | 133.91 | ₹3,33,117.19 |
| 6 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 150 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 555 | RM | 913.9 | ₹5,07,214.5 |
| 7Centering and Shuttering including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge | |||||
| 7.1 | For Plain CC work including all material & T&P | 5,241.11 | Sqm | 312.8 | ₹16,39,419.21 |
| 7.2 | For RCC slab, Lintels & simple beam including all material & T&P | 569.52 | Sqm | 572.5 | ₹3,26,050.2 |
| 8 | C.C. 1:2:4 with cement coarse Sand Mortar and 10-20mm stone grit including all labour T&P etc. for proper completion of work As per Direction of Engineer-in-charge for coping. | 2,335.15 | M3 | 6,097.26 | ₹1,42,38,016.69 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
TD.pdf
Tender Documents • 2.13 MB
BOQ_2181079.xls
BOQ • 0.25 MB
05Retender.pdf
Additional Documents • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].