Loading…
Loading…
Tender Value
₹8.4 Cr
EMD Value
₹16.8 L
Closing Date
1 Jul 2026, 2:30 pm3d left
Similar tender results from the same govt authority in the past 3 years.
Supertending Engineer
Irrigation Work Circle Banda
Restoration Work of Kharela Rajwaha Km 0.000 to 17.850, Riwai Km 0.000 to 3.500, Santoshpura Km 0.000 to 1.390, KumhRai Km 0.000 to 2.510, Paretha II Km 0.000 to 4.500 and Punnia Alpika from km 0.000 to 3.400 In Irrigation Division Mahoba (LOT-02)
2026_UPIDC_1160582_2
04/SE/2026-27 dt 09-06-2026
Open Tender
Civil Works
300 days
Mahoba
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,900
₹16.8 L
24 Jun 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
1 Jul 2026
24 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work Excavation of Foundation M.K.R. and Kanker Mixed soil including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 5,965.37 | M3 | 92.9 | ₹5,54,182.87 | BI01010001010000000000000515BI0100001113 |
| 2 | Laying Coarse sand in foundation including all labour T & P etc. for proper completion of work. As per direction of Engineer-in-charge. | 349.72 | M3 | 2,539.34 | ₹8,88,057.98 | - |
| 3 | P.C.C. 1:3:6 in foundation with cement, Sand & 22.40-53mm Stone Ballast including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 276.2 | M3 | 5,099.94 | ₹14,08,603.43 | - |
R.C.R. Stone Masonry work with 1:4 Cement Sand Mortar including all labour T&P etc.for proper completion of work.As per direction of Engineer-in-charge | 2,279.69 | M3 | 5,895.59 | ₹1,34,40,117.57 | - | |
| 5 | Raised Struck pointing with 1:3 cement sand Morter including all labour T&P etc. for Proper complection of work. as per direction of Engineer-in charge. | 2,487.62 | Sqm | 133.91 | ₹3,33,117.19 | - |
| 6 | Providing & Laying and fixing R.C.C. hume pipe NP3 of 150 mm dia including making joint by fixing collor with all cost of material, labour, T&P, carriage etc. | 555 | RM | 913.9 | ₹5,07,214.5 | - |
| 7Centering and Shuttering including all Labour T&P etc. for proper complection of work As per direction of Engineer-in-charge | ||||||
| 7.1 | For Plain CC work including all material & T&P | 5,241.11 | Sqm | 312.8 | ₹16,39,419.21 | - |
| 7.2 | For RCC slab, Lintels & simple beam including all material & T&P | 569.52 | Sqm | 572.5 | ₹3,26,050.2 | - |
| 8 | C.C. 1:2:4 with cement coarse Sand Mortar and 10-20mm stone grit including all labour T&P etc. for proper completion of work As per Direction of Engineer-in-charge for coping. | 2,335.15 | M3 | 6,097.26 | ₹1,42,38,016.69 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.02 MB
TD.pdf
Tender Documents • 2.13 MB
BOQ_2181079.xls
BOQ • 0.25 MB
05Retender.pdf
Additional Documents • 0.43 MB
Download all tender documents and submit your bid