| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.7 CrAccepted-AOC | ₹6.7 Cr | L1 | Accepted-AOC accept |
| 2 | L2₹7.0 Cr+₹22.5 L (3.35%)Rejected-Finance | ₹7.0 Cr+₹22.5 L (3.35%) | L2 | Rejected-Finance RATE |
| 3 | L3₹7.5 Cr+₹73.9 L (11.0%)Rejected-Finance BELDEI GARAPUR SAHSON PHULPUR PRAYAGRAJ | PHULPUR | PRAYAGRAJ | UTTAR PRADESH | ₹7.5 Cr+₹73.9 L (11.0%) | L3 | Rejected-Finance RATE |
| 4 | L4₹8.0 Cr+₹1.2 Cr (18.3%)Rejected-Finance | ₹8.0 Cr+₹1.2 Cr (18.3%) | L4 | Rejected-Finance RATE |
| 5 | L5₹8.0 Cr+₹1.3 Cr (19.2%)Rejected-Finance | ₹8.0 Cr+₹1.3 Cr (19.2%) | L5 | Rejected-Finance RATE |
| Sl No | Description | Qty | Unit | M/S KUMAR CONSTRUCTION Co L6 | M/S MAHENDRA KUMAR SINGH L1 | M/S DHYAN SINGH L4 | M/S SATYA PRAKASH SINGH CONSTRUCTION CO L2 | M/s JAYSINGH L3 | K V M INDUSTRIES PRIVATE LIMITED L5 | Shivam Construction And Suppliers L7 | M/S BRAHMDEEEN AND SONS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | (A) For Road Work :- Construction of embankment with ordinary soil obtained from borrowpit with all lifts and lead up to 2 Km, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 19,548 | Cum | 100 ₹19,54,800 | 10 ₹1,95,480 Lowest | 35 ₹6,84,180 | 65 ₹12,70,620 | 90 ₹17,59,320 | 57 ₹11,14,236 | 40 ₹7,81,920 | 55 ₹10,75,140 |
| 2.00 | Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2..including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 12,852 | Cum | 50 ₹6,42,600 | 10 ₹1,28,520 Lowest | 25 ₹3,21,300 | 35 ₹4,49,820 | 30 ₹3,85,560 | 42 ₹5,39,784 | 40 ₹5,14,080 | 100 ₹12,85,200 |
| 3.00 | Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections..including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 12,852 | Cum | 50 ₹6,42,600 | 10 ₹1,28,520 Lowest | 25 ₹3,21,300 | 35 ₹4,49,820 | 25 ₹3,21,300 | 37 ₹4,75,524 | 40 ₹5,14,080 | 100 ₹12,85,200 |
| 4.00 | Construction of granular sub-base by providing close graded material grade-I, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as persr no 4.1B and clause 401..including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 10,728.6 | Cum | 1,350 ₹1,44,83,610 | 950 ₹1,01,92,170 | 850 ₹91,19,310 Lowest | 900 ₹96,55,740 | 1,100 ₹1,18,01,460 | 1,285 ₹1,37,86,251 | 1,250 ₹1,34,10,750 | 1,825 ₹1,95,79,695 |
| 5.00 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.[WMM] sr no 4.14 morth specification 406 A.including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 4,884.69 | Cum | 1,500 ₹73,27,035 | 950 ₹46,40,455.5 Lowest | 1,295 ₹63,25,673.55 | 1,000 ₹48,84,690 | 1,246 ₹60,86,323.74 | 1,350 ₹65,94,331.5 | 1,600 ₹78,15,504 | 2,200 ₹1,07,46,318 |
| 6.00 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. Sr no 5.10 morth specificatoin no 502 A .including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 33,495 | Sqm | 25 ₹8,37,375 | 20 ₹6,69,900 | 20 ₹6,69,900 | 20 ₹6,69,900 | 20 ₹6,69,900 | 18 ₹6,02,910 Lowest | 25 ₹8,37,375 | 34 ₹11,38,830 |
| 7.00 | Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.25 kg per sqm with Bitumen VG-10 on the prepared granular /bituminous surface cleaned with mechanical broom befor DBM sr no 5.2 morth specification 503(i) A.including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 66,990 | Sqm | 14 ₹9,37,860 | 10 ₹6,69,900 | 8 ₹5,35,920 | 7 ₹4,68,930 Lowest | 7 ₹4,68,930 Lowest | 10 ₹6,69,900 | 10 ₹6,69,900 | 10 ₹6,69,900 |
| 8.00 | Providing and laying dense graded bituminous macadam Grade II with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder V.G. 30 @ 4.50 .per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. sr no5.4 MoRTH specification 505 B ..including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 4,049.1 | Cum | 7,800 ₹3,15,82,980 | 7,500 ₹3,03,68,250 | 8,800 ₹3,56,32,080 | 7,000 ₹2,83,43,700 Lowest | 7,825 ₹3,16,84,207.5 | 8,000 ₹3,23,92,800 | 8,000 ₹3,23,92,800 | 8,000 ₹3,23,92,800 |
| 9.00 | Providing and applying Tack coat with bitumen Pressure distributor at the rate of 0.20 kg per sqm with Bitumen VG-10 on the prepared bituminous surface cleaned with mechanical broom befor BC. sr no 5.2 MoRTH specification 503 (ii)..including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 66,990 | Sqm | 14 ₹9,37,860 | 10 ₹6,69,900 | 8 ₹5,35,920 | 7 ₹4,68,930 Lowest | 7 ₹4,68,930 Lowest | 10 ₹6,69,900 | 10 ₹6,69,900 | 10 ₹6,69,900 |
| 10.00 | Providing and laying bituminous concrete Grade II with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binderVG30 @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per sr no 5.5 MORTH specification clause No. 507 B complete in all respects. including cost of material , all taxes ,labour ,t&p etc as per direction of engineer in chrage | 2,009.7 | Cum | 8,800 ₹1,76,85,360 | 8,000 ₹1,60,77,600 Lowest | 9,950 ₹1,99,96,515 | 8,500 ₹1,70,82,450 | 8,000 ₹1,60,77,600 Lowest | 9,030 ₹1,81,47,591 | 11,000 ₹2,21,06,700 | 11,000 ₹2,21,06,700 |
Tender Value
₹11.3 Cr
EMD Value
₹22.6 L
Closing Date
15 Sept 2025, 12:00 pmClosed
SE MZP CIRCLE PWD MIRZAPUR
SE MZP CIRCLE PWD MIRZAPUR
W/S
2025_CEMRZ_1069613_2
3803/53MZP CIRCLE dt 12-08-2025
Open Tender
Civil Works
Item Wise
365 days
MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,720
Yes
₹22.6 L
Yes
SE MZP CIRCLE PWD MIRZAPUR
21 Nov 2025
4 Sept 2025
15 Sept 2025
4 Sept 2025
15 Sept 2025
4 Sept 2025
4 Sept 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.84 MB
BOQ_1954686.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .