Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.6 L+₹1.7 L (12.8%)Rejected-AOC | L2 | Rejected-AOC L2 |
Tender Value
₹13.1 L
EMD Value
₹13,100
Closing Date
27 Feb 2024, 3:00 pmClosed
The Block Development Officer(BP), Pappireddipatti
The Block Development Office, Pappireddipatti
Pappireddipatti Block - Construction of Culvert (3.00m Span) at Vachathi to Kalasapadi Road km 2/0 - 3/0 (Ch-2670m) H/O Sitheri in Package No TN04-01/ Sitheri Grama Village Account No.1 (2023-2024) Pappireddipatti Block P01
2024_RDTN_428132_1
TN04-01/805/A4/2024/Sitheri Vill Pts Acct No.1/P01
Open Tender
Civil Works
Item Rate
90 days
The Block Development Office, Pappireddipatti
Can be seen in the tender documents
3 documents required · 3 mandatory
₹0
₹13,100
Yes
27 May 2024
20 Feb 2024
27 Feb 2024
20 Feb 2024
27 Feb 2024
20 Feb 2024
Amount
Construction of Culvert ( 3.00m Span) @ Vachathi to Kalasapadi Road KM 2/0-3/0 (Ch-2670m) H/O Sitheri
Earth work excavation and depositing on bank with an initial lead of 10m and initial lift of 2m in hard stiff clay stiff block cotton, hard red earth and hard gravelly soil etc., as per Rural schedule of rates Above 0.60m
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement concrete in CC 1:4:8 mix using 40mm ISS HBG metal for foundation including watering whenever necessary and laid in layers not more than 15cm thick compacting ect., completed with standard specification and directed by the departmental officers.
Cement conerete 1:3:6 (one cement three sand six jelly)using 40.m.m.H.B.G.Jelly for foundation including watering wherever necessary sand laid in layers not more than 15 c.m. thick compacting etc. complete complying with standard specification and an
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete. Below Sill
Centring charges fo Steel centring for RCC work including cost and conveyance of all materials etc., complete. Above Sill
Fabrication and places in positing mild steel on rubbed for steel and all ream forced cement concrete work as per type designed given including cost of steel binding wire in all floors etc., complete with standard specification.
C.C. 1:2:4 Mix using 20mm HBG metal including cost and conveyance of all etc., completed.,
Reinforcement Concrete 1: 1 1/ 2: 3 Mix using 20mm ISS HG metal including cost and conveyance of all materials and Labours charges ect., completed.
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for filling etc.complete,
Provision for Wepholes
Provision for Expansion Joints (Bituman Pad)
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
K.Sakthivel
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .