| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹6.5 LAccepted-AOC SALEMPUR ROAD SADABAD HATHRAS | HATHRAS | HATHRAS | UTTAR PRADESH | L-1 | Accepted-AOC Accept | |
| 2 | L-2₹6.7 L+₹19,355 (2.98%)Rejected-AOC | L-2 | Rejected-AOC Reject | |
| 3 | L-3₹10.2 L+₹3.7 L (57.4%)Rejected-AOC 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | L-3 | Rejected-AOC Reject | |
| 4 | L-4₹10.5 L+₹4.0 L (61.6%)Rejected-AOC | L-4 | Rejected-AOC Reject |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
22 Jan 2021, 1:00 pmClosed
SE EDC-1 AGRA
B-690 Kamla Nagar Agra
for the work of Construction of New 11 KV and LT Lines and other associated works against time to time Sanctioned B.Plan Packages under EDD 2 Agra
2021_DVVNL_546151_1
22/EDCA/2020-21
Open Tender
Electrical Works
Piece-work
365 days
B-690 Kamla Nagar Agra
As per Tender Documents
2 documents required · 2 mandatory
₹1,000
DVVNL
₹10,000
3 Aug 2021
15 Jan 2021
22 Jan 2021
15 Jan 2021
22 Jan 2021
15 Jan 2021
Carriage of following from 132 KV Taj Agra to work related 33/11 KV S/s through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) A)PCC pole 8.5 Mtr. long
Carriage of following from 132 KV Taj Agra to work related 33/11 KV S/s through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) A) ST pole 9/11 Mtr. long
Carriage of following from 132 KV Taj Agra to work related 33/11 KV S/s through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) H)Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, as required
Carriage of following from work related 33/11 KV S/s to actual site of work i.e. pitpoint through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, Dragging of Pole, T&P, carrier etc. required for proper completion of work.(Distance 00-10Kms.) A)PCC pole 8.5 Mtr. long
Carriage of following from work related 33/11 KV S/s to actual site of work i.e. pitpoint through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, Dragging of Pole, T&P, carrier etc. required for proper completion of work.(Distance 00-10Kms.) A) ST pole 9/11 Mtr. long
Carriage of following from work related 33/11 KV S/s to actual site of work i.e. pitpoint through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, Dragging of Pole, T&P, carrier etc. required for proper completion of work.(Distance 00-10Kms.) H)Line material viz. Aerial bunch conductor/Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, as required
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) B)400 KVA T/F
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) C)250 KVA T/F
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) D)100 KVA T/F
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) E) 63 KVA T/F
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.) F)25 KVA T/F
Carriage of following from 132 KV Taj Agra to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-50Kms.G) 11 KV 3x185/240/300 sq.m.
Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.
Erection and grouting of single pole of 8.5 Mtr. long PCC poles in 1:2:4 (Cement sand, and bricks blast), including fixing of accessories for HT/LT line as per RESPO manual.
Erection and grouting of double pole on 8.5 Mtr. long PCC poles in 1:2:4 (Cement sand, and bricks blast), including fixing of accessories for double pole S/s as per RESPO manual.
Erection and grouting of single pole on 9/11 Mtr. long ST poles including fixing of accessories for HT/LT line as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Erection and grouting of double pole on 9/11.0 Mtr. long ST poles including fixing of accessories for double pole S/s as per RESPO manual and as per direction of Engineer Incharge labour, T &P and carrier etc. required for proper completion of work.
Making HT 'T' off connection on existing mains.
Erection and grouting of stays as per RESPO manual
Fixing of earthing rod as per RESPO manual.
Chopping, triming of tree branches to clear the line route to give 2 mtr. horizontal and vertical clearance to the line coming in the route of different feeders as per direction of supervising engineer
Laying sagging stringing and binding and jumpering etc of following conductor as per RESPO manual (a) ACSR Weasal conductor
Laying sagging stringing and binding and jumpering etc of following conductor as per RESPO manual :- (b) ACSR Dog/Racoon conductor
Laying sagging stringing and binding and jumpering etc of following conductor as per RESPO manual :- (c) AB Conductor 3x50 mm
Laying sagging stringing and binding and jumpering etc of following conductor as per RESPO manual :-(d) AB Conductor 3x95 mm
Laying sagging stringing and binding and jumpering etc of following conductor as per RESPO manual :-(e) AB Conductor 3x120 mm
Removal of following damaged conductor from existing line including opening of jumpers etc and making bundling n Stacking. A) ACSR Weasal conductor
Removal of following damaged conductor from existing line including opening of jumpers etc and making bundling n Stacking. B) ACSR Dog / Racoon conductor
Removal of following damaged conductor from existing line including opening of jumpers etc and making bundling n Stacking. C) 50/95/120 sqmm. Areal Bunch Conductor
Construction of plinth for 250/400 KVA Transformer of size 5’x5’x4’ above the ground lable and 1 feet below the ground. At the bottom there shall be CC pad of brick ballast of size 5x5’x3” thick in ratio 1:3:6 [Cement, sand and brick ballast]. The first class brick wall work shall be 9” thick in ratio 1:4 [Cement and sand]. The hollow portion among the wall shall be filled up with the brick ballast. On the top of the wall of plint there shall be RCC work in ratio 1:3:6 [Cement, Sand and grit stone] by using 12 mm dai MS bar at distance of 9’’. There shall be plastering all over the plinth 12 mm thick in ratio 1:4 [Cement and sand] above the ground level. Proper watering and curing of the plinth shall be carried out.
Fencing of 250/400 KVA T/Fs:- Fabrication of 50x50x6 mm size MS Angle frame of size 3000x2400mm with 450 mm long angle for grouting the frame and fixing of 2"x1.5", 10 SWG welded wire mesh with MS strip of 24x5mm size all round the frame and drilling 9 mm holes insides of frames at as distance of 300mm for jointing of frame with the help of boslts and nuts including cost of material. The width of panal may vary as per site conditions, Grouting and fixing of angle iron frames in ratio 1:2:4 (cement, coarse sand and stone ballast ) in the pocket of 150x150x150mm all round the plinth and bolting of frames with 25x8 mm size bolts and nuts, Making main gate in front of the plinth of size 3000x2400 mm by making two leaves of size 3000x1200mm size and grouting the same in ratio and method mentioned at item (b) above fixing with hinges with dandlas for locking system &Painting of entire wire mesh angle iron etc. with Bus Green super enamelled pain in two coats on the primer two coats of Red oxide.
Earthing of 250 / 400 KVA distribution transformer by maintenance free Earthing Electrods (Chemical) by digging pits 6" dia 3mtr. deep including inserting pipe in pipe technology concept involve two mild steel pipes one inserted inside the other of size ;- 1. Inner pip dia meter 50 Mm. 2. outer pipe dia meter 100 mm. length of the both pipe shall be 3000 mm. The M.S.pipe shall be ISI mark of class B as per IS 1239. Thickness of the pipe shall be 12 swg. The empty space in the pipe shall be filled with the specially developed crystalline material conductiv mixture such as copper and aluminimum powder.conductive carbon and bonding material etc. mixed in diffrent proportions. Conductive mixture contents shall be 70 % carbon powder & 30% metal powder preferably pure copper or aluminum material along with the required quantity of bonding materials. Granule size of the carbon & metal powder shall be 100 mesh. The mixture if forced (pressurized) inside the earth electrode in empty space of inner pipe & in empty space between the inner & outer pipe of the earth electrode, in paste form and after soldification of the same the bottom end cap as well as top end cap is provided. The mixture shall be pressed by machine in the pipe. Precaution shall be taken has to have no air gap inside the pipe while pressing. The back fill compound (earth enhancment material ) shall be superior conductive material that improves earthing effectiveness especially in areas of poor conductivity such as rocky ground, sandy soil & areas of moisture varation. It may contain conductive cement (20%) graphite carbon powder(50%), hydrous aluminum siliacate (10%), Sodium montmorillonite (20%) etc. it shall be placed around earth electrode in the earth pit to improve the conductive of earth electrode & ground contact area. Mild steel electro galavanized Flat 50x6 mm shall welded to earth electrode pips & connected with Trasnformer neutral and body as below with the hlep of steel nut & bolt or through welding as per requirment of site, to GI pipe and filling of chemical mixutre around the GI pipe upto 3 mtr. including making of chamber & connecting the top of the inserted pipe with transformer body & neutral through M.S.flat 50x6mm with the help of nut & bolt or through welding and making a main hole of size 2'×2' and covering the same by a stone pad for the purpose of poring water for moisture.
Providing and fixing of bamboo seperators in LT line.
Installation of 250 KVA T/F on plinth in proper alignment and direction & making HT/LT connection. providing "L" type alminium bus bar and suitable size alminium lugs
Installation of 400 KVA T/F on plinth in proper alignment and direction & making HT/LT connection. providing "L" type alminium bus bar and suitable size alminium lugs
Installation of following T/F on newly erected double pole & making HT/LT connection. A)100 KVA T/F
Installation of following T/F on newly erected double pole & making HT/LT connection. B) 63 KVA T/F
Installation of following T/F on newly erected double pole & making HT/LT connection. C) 25 KVA T/F
Opening of service cable of consummers and re-fixing the same after replacement of conductor.
Removal of 250 KVA T/F from plinth/double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 100 KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 63 KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Removal of 25 KVA T/F from existing double pole after opening HT/LT connections and their cariage to 132 KV taj store agra including loading and unloading at both end.
Laying of cable 3x185/240/300 sq.mm 11 KV XLPE power cable including excavation of earth 600mm deep and brick laying (18 Nos. in One mtr.), sand filling as per RESPO norms including proper filling of earth and leveling at 33/11 KV substation ( The bricks already available from the dismantelled existing trench shall be used.)
providing of 6" dia H.D.P.E./G.I. pipe for laying of 33 KV 3x300 sqmm XLPE cable and 11 KV 3x185/240/300 sqmm XLPE cable.
Road restoration charges for pucca road crossing by drill machine/H.D.D. Machine for Laying of Double Circuit 6" Dia H.D.P.E. pipe for (11 KV XLPE Cable) including the cost of arrangment of labour, T&P & Drill mchine/H.D.D. machine as per site requirment.
Laying of 11 KV XLPE Cable 3x185/240/300 sqmm threw the laid H.D.P.E. Pipe and making proper loops etc as per respo manual.
Fixing of LT dustribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr.
aashirvad contractor
ABHISHEK ENTERPRISES
ASTHA ENGEENEARING WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .