Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAdmitted-Finance | ₹1.7 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Andiappan Contract L1 |
|---|---|---|---|---|
| 1.00Work contract schedule | ||||
| 1.01 | Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or
manual | 107 | Each pit | 390 ₹41,730 Lowest |
| 1.02 | Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by
using JCB or manual | 1,120 | Each pit | 475 ₹5,32,000 Lowest |
| 1.03 | Excavation of Stay pit 4.5' to 5' depth by using JCB or manual | 578 | Each pit | 390 ₹2,25,420 Lowest |
| 1.04 | Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or
manual | 107 | Each pole | 475 ₹50,825 Lowest |
| 1.05 | Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or
maual | 1,118 | Each pole | 550 ₹6,14,900 Lowest |
| 1.06 | Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/
Tubular pole by using JCB or maual | 2 | Each pole | 575 ₹1,150 Lowest |
| 1.07 | Erection of stay set complete | 578 | Each Stay | 210 ₹1,21,380 Lowest |
| 1.08 | Fixing of HT "V" cross arms (all types) / Channel cross arms/ Guarding
Cross arms | 1,174 | Each | 150 ₹1,76,100 Lowest |
| 1.09 | Fixing of LT 3 phase cross arms | 271 | Each | 100 ₹27,100 Lowest |
Tender Value
₹1.4 Cr
EMD Value
₹1.4 L
Closing Date
29 Aug 2022, 2:00 pmClosed
SE/MEDC/Mettur
O/o SE/MEDC/Mettur
RDSSAgri feeder segregation Existing 22 KV Erugalur feeder Work contract Bay extension ,Breaker erection in Iveli 110/22 KV substation and laying of HT UG Cable HT/LTOH lines in Erugalur feeder in Vaikuntham Section East /Sankari subdivision
2022_EB_247118_1
SE/MEDC/RDSSWC/SpecNO 026/22-23
Open Tender
Electrical Works
Works
210 days
SE/MEDC/Mettur Dam
EMD and documents as per BQR condition
3 documents required · 3 mandatory
₹0
₹1.4 L
8 Sept 2022
16 Aug 2022
30 Aug 2022
16 Aug 2022
29 Aug 2022
16 Aug 2022
16 Aug 2022 - 29 Aug 2022
Amount
Work contract schedule
Excavation of pole pit upto 27' (8.0 m) Pole by using JCB or manual
Excavation of pole pit above 8.0 Mtr pole PSC/RCC/RSJ pole by using JCB or manual
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Erection of PSC/ RCC poles/Metal poles upto 8.00m. (27') by using JCB or manual
Erection of PSC/ RCC poles/Metal poles above 8.00m by using JCB or maual
Metal supports above 9.00m/ RSJ/ Rail pole/ Fabricated poles/ Tubular pole by using JCB or maual
Erection of stay set complete
Fixing of HT "V" cross arms (all types) / Channel cross arms/ Guarding Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of Aluminium Knob
Fixing of HT pin Insulators 22 KV
Fixing of HT 22 KV strain disc.
Fixing of LT pin Insulator
Fixing of LT shackle
ACSR 7/4.09 mm Raccoon conductor
ACSR 7/3.35mm / AAAC 3.15 mm Rabbit conductor
paving of conductor ACSR 7/2.59 mm / AAAC 2.50 mm weasel and ACSR 7/2.11 mm Conductor
Sleeve concreting including materials (Cement + River Sand/ M sand and Blue metals and watering)
Stay Concreting including cost of materials and labour 375mmx375mmx50mm
Earthing of pole with coil earthing including burying looping and binding.
Numbering of pole with paint and with base painting.
Painting of RCC/PSC poles (Colour washing)
Flat guarding including fixing of 2 Nos. cross arms.
Transport of Poles /Materials/Conductors and other materials Below 8 Kms (Plains)
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual up to 100 m
Transporting of poles from road side to pole pit including loading and unloading of poles by using JCB or manual beyond 100 m
Loading of poles upto 8.0 M/ 27'
Loading of poles above 8.0 M
Loading of metal poles (All sizes)
Unloading of Metal poles
Unloading of poles
Loading of materials
Unloading of materials
Loading or unloading of Transformer upto 100 KVA
Erection of New Transformer all capacities (with jumpering)
Erection of street light service
Fixing of new CFL/ LED lamp fittings
Clearing of branches of trees
Erection of Single Pole Transformer structure complete in all respects with wiring, Earthing, fixing of open type fuse units, HT/LT LAS and jumpering 3 Nos. Earth pit with collar including painting of metal parts, structure poles, fixing of tapping channel, transformer bed structure including concreting (Except erection of Transformer)
Erection of D.P. structure with AB switch, top channel, cross bracing, earthing, painting, providing stay including concreting
22KV UG Cable works : Earthwork excavation 1.2 Mt.average Depth x 0.6 mt average Depth in hard stiff clay, shales murran gravel, stoney earth and mixed with small sizes boulders and gravelly soil for sand bedding as directed by the Engineer-in-charge at site and including providing labour for watching over the excavated trench during day and night to avoid any accident caused to animal and human being including cost of signal board, danger light, lead and lift etc., complete excluding blacktopping and including trial pits charges.
Providing sand bedding with good quality of river sand to a depth of 6'' in the excavated cable trench including cost of sand, labour, and labour charges for transport,lead, lift, etc., complete
Loading of HT cable drum from stores using crane Lorry, safe transportng to site and safe unloading at the worksite without any damage using crane lorry.This includes labour for loading, unloading, transporting and rent for crane lorry, all T&P suchas crowbars,siling,DShackle etc., that must be brought by the contractor.
Recoiling / Laying / Removal of HT UG cable in the excavated trench including drawing the cable through RCC/G.I.Pipe wherever necessary such as Road Crossing etc.,without any damage , sealing the cable with end caps with suitabl endsand which includes provision of Signal Board, Danger Board, light etc and also loading, transporting charges, unloading of tools and plant etc.,the contractor must bring all tools and plants.
Drawal/Laying of R.C.C."V" Troughs in th excavated cable trench from Stores/ Worksite including transportation without any damage .This includes all Lead ,Lift safe unloading, safe Loading and transport etc. ( Note: Damage if any due to rough handling, the cost of V trough will be be deducted)
Refilling the cable trench and duct with excavated earth in layer,ramming and consolidating properly in layers of 6" and the top brought in line with the existing surface including labour, lead, lift. Etc., complete
Fixing of cable termination with clamp at 3 locations along the structure after completion of termination joint.Termination joint will be done by cable jointer separately.But this includes releasing of cable drum from the cable pit/ structure ,providing and releasing of tent,transporting of tent from office to site and back fixing the cable at structure and back filling the cable pit etc.
Labour for loading,Unloading of iron scrap in Lorry/Drum for devolution(The Scrap may be devoluted by the department Lorry)
Supply and Erection of 160 mm dia ISI PVC Pipe for Road and Drainage crossing for the HT Cable laying ( Note: Normally PVC Pipes will be used for termination structure. Only in specific locations the GI pipe will be used as per the advise of site engineer incharge)
Loading, unloading ,transporting and erection of RCC Cable marker of standard size including painting the word " TNEB/ UG CABLE" and other notations as per the site Engineers instruction. (Includes excavation and laying)
Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Outdoor End termination Kit-Heat shrinkable type,including charges for cable jointer.
Erection of 33 KV 3C x 400 Sq.mm XLPE UG Cable Straight Joint Kit-Heat shrinkable type,including charges for cable jointer.
Laying of PCC 1:3:6 by using 20mm HBG metal for on casing PVC/GI pipes in the road crossing and streets in cable duct and other places wherever necessary including cost of all materials ,lead,lift ,labour charges ,watch and ward ,danger board ,light ,signal board etc
Supply and Erection of cast iron 250 mm dia Pipes at Railway crossings by adopting trenchless method including cost of all materials labour and transportation lead,lift etc complete
22 KV Bay Extn with Bay A.Labour charges towards Erection of Breaker ,CT ,LAS ,AB switch , Control panel, laying & termination of control cables,Erection of Busbar & Jumpering works etc. Including the cost of consumables like cable gland ,lugs ,Tie etc
Bay extension works -B.Supply of Earthing materials and Earthing works ,Junction box ,Supply and Erection of plinth including cement,sand ,cable duct, foundation bolts etc.
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @ 3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
Tendernotice_2.pdf
PDF • 0.15 MB
BOQ_292329.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .