Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹7.0 L+₹12,693.50 (1.85%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹8.3 L+₹1.4 L (20.9%)Admitted-Finance ERIKKADU THERMAL POST METTUR DAM 636 406 | METTUR DAM | SALEM | TAMIL NADU | 636406 | L3 | Admitted-Finance | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Has not furnished relevant acceptance order | |
| 5 | Not Admitted-Fee/PreQual/Technical 28 1 THURAIYUR PUTHUCHINNAKAVUR METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | - | Not Admitted-Fee/PreQual/Technical Others-Has not furnished relevant acceptance order |
| Sl No | Description | Qty | Unit | NVS and Co L3 | ARP Engineering Contractor L1 | SURIYA ENGINEERING CONTRACTORS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete as directed by the Engineer at site including cost of all materials, labour charges, curing, leads, lifts, etc., complete. | 6 | 1 M³ | 575 ₹3,450 | 475 ₹2,850 Lowest | 483 ₹2,898 |
| 2.00 | Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 25 | 1 M³ | 250 ₹6,250 | 205 ₹5,125 Lowest | 208 ₹5,200 |
| 3.00 | Refilling with excavated earth well-watered and consolidated in layers of in foundation and basement as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 4 | 1 M³ | 50 ₹200 | 42 ₹168 Lowest | 42 ₹168 Lowest |
| 4.00 | Providing PCC 1:3:6 using 20mm HBG metal for foundation as directed by the Engineer at site including cost of all materials,labourcharges, curing, leads, lifts, etc.complete. | 1.5 | 1 M³ | 7,000 ₹10,500 | 5,794 ₹8,691 Lowest | 5,906 ₹8,859 |
| 5.00 | Providing RCC 1:1 1/2 :3 using 12mm to 20mm HBG metal for raft, side walls, slab etc., as directed by the Engineer incharge at site including cost of all materials,Shuttering, labour charges, curing, T&P, lead, lift, etc., complete. | 13 | 1 M³ | 16,200 ₹2,10,600 | 13,399 ₹1,74,187 Lowest | 13,657 ₹1,77,541 |
| 6.00 | Providing steel reinforcement for all RCC works including cutting, bending, binding, typing and placing in position including cost of steel, binding wire, lead, lift etc., complete as directed by the Engineer in charge at site | 3.55 | 1MT | 1,01,100 ₹3,58,905 | 83,630 ₹2,96,886.5 Lowest | 85,240 ₹3,02,602 |
| 7.00 | Plastering in C.M1:3, 20 MM thick in tank wall surface & raft bottom including applying of waterproof compund (Dr.Fixit Pidiproof LW+ or eqiuvalent) directed by the Engineer at site , cost of all materials, labour charges, curing, lead, lift and charged for removing the old plastering, T&P`s etc., complete. | 46 | 1 M2 | 680 ₹31,280 | 563 ₹25,898 Lowest | 574 ₹26,404 |
| 8.00 | Supplying and erection of 0.5HP submergible motor & pumpset including electrification i.e laying of 2.50 sq.mm cable, electronic starter, food valve etc., including cost of all materials, lead, labour, transporting, etc, complete | 3 | 1No | 15,500 ₹46,500 | 12,740 ₹38,220 Lowest | 12,985 ₹38,955 |
| 9.00 | Charges for laying and jointing PVC pipes of the 32 mm size including cutting, of pipe, PVC specials and fixing to wall with necessary teakwoods plugs, PVC slamps and screws, making good the dismantled portions to the original condition with necessary brick work and plastering whereever necessary scaffolding charges. (internal watersupply arrangement) CM-20835 | 300 | 1RM | 350 ₹1,05,000 | 290 ₹87,000 Lowest | 294 ₹88,200 |
| 10.00 | Supply and providing 1000 litres capacity Priming Tank made up of PVC (three layer) in position including cost of materials, lead, lift etc., complete as directed by the Engineer in charge at site. | 3 | 1No | 12,100 ₹36,300 | 10,010 ₹30,030 Lowest | 10,202 ₹30,606 |
Tender Value
Refer Docs
EMD Value
₹8,000
Closing Date
26 Feb 2026, 2:00 pmClosed
CE/MTPS-II
O/o Chief Engineer/ MTPS-II
Construction of 3000 liters capacity ground level tank to store the treated municipal water and other allied works in U-105, U-106 and U-107 quarters at Thermal Nagar-1 of MTPS-II.
2026_EB_655996_1
CE / MTPS-II / SE / Civil / OT.No. 55 / 2025-26
Open Tender
Civil Works
Works
120 days
MTPS-II- Mettur Dam
Tender Specification
4 documents required · 4 mandatory
₹0
₹8,000
Yes
15 Sept 2026
12 Feb 2026
27 Feb 2026
12 Feb 2026
26 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Dismantling Plain Cement Concrete as directed by the Engineer at site including cost of all materials, labour charges, curing, leads, lifts, etc., complete. | 6 | 1 M³ | - | - | 18% |
| 2 | Earth work excavation for foundation and depositing on bank with initial lead of 10m & initial lift of 2m as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 25 | 1 M³ | - | - | 18% |
| 3 | Refilling with excavated earth well-watered and consolidated in layers of in foundation and basement as directed by the Engineer in charge including all labour charges, lead, lift, T&Ps etc., complete. | 4 | 1 M³ | - | - | 18% |
| 4 | Providing PCC 1:3:6 using 20mm HBG metal for foundation as directed by the Engineer at site including cost of all materials,labourcharges, curing, leads, lifts, etc.complete. | 1.5 | 1 M³ | - | - | 18% |
| 5 | Providing RCC 1:1 1/2 :3 using 12mm to 20mm HBG metal for raft, side walls, slab etc., as directed by the Engineer incharge at site including cost of all materials,Shuttering, labour charges, curing, T&P, lead, lift, etc., complete. | 13 | 1 M³ | - | - | 18% |
| 6 | Providing steel reinforcement for all RCC works including cutting, bending, binding, typing and placing in position including cost of steel, binding wire, lead, lift etc., complete as directed by the Engineer in charge at site | 3.55 | 1MT | - | - | 18% |
| 7 | Plastering in C.M1:3, 20 MM thick in tank wall surface & raft bottom including applying of waterproof compund (Dr.Fixit Pidiproof LW+ or eqiuvalent) directed by the Engineer at site , cost of all materials, labour charges, curing, lead, lift and charged for removing the old plastering, T&P`s etc., complete. | 46 | 1 M2 | - | - | 18% |
| 8 | Supplying and erection of 0.5HP submergible motor & pumpset including electrification i.e laying of 2.50 sq.mm cable, electronic starter, food valve etc., including cost of all materials, lead, labour, transporting, etc, complete | 3 | 1No | - | - | 18% |
| 9 | Charges for laying and jointing PVC pipes of the 32 mm size including cutting, of pipe, PVC specials and fixing to wall with necessary teakwoods plugs, PVC slamps and screws, making good the dismantled portions to the original condition with necessary brick work and plastering whereever necessary scaffolding charges. (internal watersupply arrangement) CM-20835 | 300 | 1RM | - | - | 18% |
| 10 | Supply and providing 1000 litres capacity Priming Tank made up of PVC (three layer) in position including cost of materials, lead, lift etc., complete as directed by the Engineer in charge at site. | 3 | 1No | - | - | 18% |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
BOQ_786643.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .