Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAccepted-AOC 44 82 LIG COLONY 1 MAHALINGAPURAM POLLACHI | COIMBATORE | TAMIL NADU | 638459 | ₹5.1 Cr Quoted ₹5.4 Cr | L1 | Accepted-AOC Lowest Rate Quoted |
| 2 | L2₹5.5 Cr+₹12.2 L (2.25%)Rejected-Finance | ₹5.5 Cr+₹12.2 L (2.25%) | L2 | Rejected-Finance Highest rate quoted |
| 3 | L3₹5.6 Cr+₹13.5 L (2.49%)Rejected-Finance 101 LAKSHMIPURAM PALANI 624 601 | DINDIGUL | TAMIL NADU | 624601 | ₹5.6 Cr+₹13.5 L (2.49%) | L3 | Rejected-Finance Highest rate quoted |
Tender Value
₹5.1 Cr
EMD Value
₹2.6 L
Closing Date
8 Jul 2020, 3:00 pmClosed
Superintending Engineer , Coimbatore
Superintending Engineer Office Highways Department Construction and Maintenance Coimbatore 641018
Widening and strengthening Strengthening and Up Keeping for a period of 60 months to Government Highways roads in VALPARAI H CM Sub Division Jurisdiction Package No 46
2020_HWAY_166180_1
p19
Open Tender
Civil Works - Highways
Percentage
270 days
Pollachi
Refer pre qualification document volume I
12 documents required · 12 mandatory
₹0
₹2.6 L
Yes
15 Dec 2020
5 Jun 2020
10 Jul 2020
8 Jun 2020
8 Jul 2020
15 Jun 2020
10 Jun 2020 - 12 Jun 2020
eProcurement System Government of Tamil Nadu Created By: kala Govindharajan Created Date/Time: 14-Jul-2020 06:21 PM Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_166180_1
Tender Inviting Authority: Superintending Engineer Highways Construction and Maintenance Coimbatire Circle
Name of Work :- Widening and strengthening, Strengthening and Up Keeping for a period of 60 months to Government Highways roads in VALPARAI (H) C&M Sub Division Jurisdiction – Package No. 46 A) Strengthening in km 7/4 - 10/2 of Valparai - Manickagurangumudi road (MD 534) including upkeeping for a period of 60 Months B) Widening from Intermediate lane to Double lane and strengthening in Km 0/0 -2/0 of Stanmore - Sirukundra road including upkeeping for a period of 60 Months C) Widening from Intermediate lane to Double lane and strengthening in Km2/0 -4/0 of Stanmore - Sirukundra road including upkeeping for a period of 60 Months D) Widening from Intermediate lane to Double lane and strengthening in Km 4/0 - 5/0 of Stanmore - Sirukundra road including upkeeping for a period of 60 Months
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words
1.00 M/s Senthilraj and co 45409661.970 9.150 55512404.000 Five Crore Fifty Five Lakh Tweleve Thousand Four Hundred and Four
2.00 S PARTHIBARAJAN 45409661.970 6.500 54164645.000 Five Crore Fourty One Lakh Sixty Four Thousand Six Hundred and Fourty Five
3.00 KCP Engineers Private Limited 45409661.970 8.900 55385257.000 Five Crore Fifty Three Lakh Eighty Five Thousand Two Hundred and Fifty Seven
Lowest Amount Quoted BY: S PARTHIBARAJAN(54164645.000)
BOQ Summary Details Tender Title: CRIDP - 2020-2021 Tender ID: 2020_HWAY_166180_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 S PARTHIBARAJAN 54164645.000 L1
2 KCP Engineers Private Limited 55385257.000 L2
3 M/s Senthilraj and co 55512404.000 L3
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .