Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
5 Mar 2021, 11:15 amClosed
EE EnM WS NW
MU BLOCK PITAMPURA DELHI 110034
Strengthening of pump foundation of pump set No. 1 installed at Mangol Puri BPS
2021_DJB_200595_5
NIT NO. 25
Open Tender
Miscellaneous Works
Item Rate
30 days
EE EnM WS NW
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Account No 50448339804
₹4,000
Yes
12 Mar 2021
26 Feb 2021
5 Mar 2021
26 Feb 2021
5 Mar 2021
26 Feb 2021
Strengthening of foundation of set no 1 at Mangol Puri BPS by carrying out following work. Dismantling of pump set no 1 by disconnecting of power connections from motor, de- coupling of motor and pump , cutting of foundation bolt, dismantling of suction and delivery pipes, / special, closing of valves taking out pump motor and specials from dry sump/ pump house with the help of crane and labour and keep it at safe place of pump house.
Providing and fixing of MS blind flanged of 300 mm dia. on suction and delivery side with rubber insertion sheet nut and bolt.
Dewatering of water coming from suction & delivery side
Removing of rusted base frame from the RCC foundation by cutting with gas cutter etc. and taking out of complete damage frame with the help of EOT crane to outside of pump house.
Breaking of RCC foundation by hydraulic hammer and manual labour to take out foundation bolts and taken out malva.
Re- casting/ strengthen of RCC foundation, re-grouting foundation bolt with the help of PMC , plastering and making wet layer of cement of the foundation i/c. Shuttering etc. as required.
Making / fabrication and supply of MS base frame with suitable for pump and motor existing at site. The base frame should be made MS channel of required/ existing size of channel, drilling/ machining and painting as required ( As per sample)
Supply of nut bolts washers and studs for re-fixing of pump and motor.
Supply of rubber neoprene packing sheet as per required size.
Fixing of newly fabricated MS foundation base frame on the RCC foundation plastering/ filling the gap of RCC foundation and MS foundation after fixing of base frame with the help of nut as required.
Re- assembling of suction and delivery / specials after removing of blind flange from suction and delivery side, fixing of pump motor to couple the motor with pump with the help of coupling re-alignment of pump and motor making electric connection of motor.
Testing and commissioning of pump set on load and no load i.e cartage, painting etc. as required
RISHABH ENGINEERS
Goodwill Enterprises
Ajay Prakash Mishra
Cantilever Engineers
J.S Industrial work
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .