Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical BOGDANG NUBRA BOGDANG BOGDANG LEH LEH JAMMU KASHMIR 194401 UDYAM LA 02 0000020 | LEH LADAKH | LADAKH | 194401 | Accepted-Technical admitted |
| 2 | Accepted-Technical | Accepted-Technical admitted |
| 3 | Accepted-Technical R O THANG NOBRA | Accepted-Technical admitted |
| 4 | Accepted-Technical | Accepted-Technical admitted |
| 5 | Accepted-Technical | Accepted-Technical admitted |
Tender Value
₹14.2 L
EMD Value
₹33,440
Closing Date
6 Jul 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal from Zinkha to Khotigo Tyakshi. (Parduk) (Under Capex)
2026_PWD_19086_3
16 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
60 days
LEH
Please refer to tender document
2 documents required · 2 mandatory
₹500
Payable To Executive Engineer InFC division Leh
₹33,440
29 Jul 2026
19 Jun 2026
8 Jul 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
A. All kinds of soil. | 637.5 | Cum | 445.85 | ₹2,84,229.38 |
| 2 | B. Ordinary rock 50% | 637.5 | Cum | 986.45 | ₹6,28,861.88 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6
gradedstone aggregate 40 mm nominal size derived from natural sources) | 7.2 | Cum | 6,417.78 | ₹46,208.02 |
| 4 | Random rubble masonry with hard stone laid dry in foundation, plinth &
walls. Laid without bond stone | 84 | Cum | 4,010.89 | ₹3,36,914.76 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form
work for : Foundations, footings, bases for columns | 8 | sqm | 306.15 | ₹2,449.2 |
| 6 | Providing and fixing HDP pipe for water supply with complete fitting and carriage. | 90 | mtr | 974.58 | ₹87,712.2 |
| 7 | Carriage of material by mechanical transport. A. Cement an lead of 220 kms. | 1.58 | M.T | 1,965.78 | ₹3,105.93 |
| 8 | B. Sand and stone agg an avg lead of 20 kms. | 9.78 | Cum | 384.74 | ₹3,762.76 |
| 9 | Carriage of material by head load. A. Sand and stone agg an avg lead of 500 mtrs. | 9.78 | Cum | 560.29 | ₹5,479.64 |
| 10 | B. Stone an avg lead of 50 mtrs. | 84 | Cum | 222.72 | ₹18,708.48 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
cancelled_1.pdf
pdf • 0.41 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_45495.xls
BOQ • 0.28 MB
corri19.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .