| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.4 L+₹9,736.35 (1.56%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹6.4 L+₹13,263.50 (2.12%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L-4₹6.8 L+₹52,351.25 (8.37%)Rejected-AOC | L-4 | Rejected-AOC L4 | |
| 5 | L5₹8.5 L+₹2.2 L (35.4%)Rejected-AOC | L5 | Rejected-AOC L5 |
Tender Value
Refer Docs
EMD Value
₹14,114
Closing Date
13 Jul 2023, 10:00 amClosed
Manager(C)
Tuirial Hydro Power Station Mizoram
Repairing of approach road to administrative building from junction Point of NH 306A at Tuirial Hydro Power Station Mizoram
2023_NEEPC_156789_1
Tuirial HPS-02/2023
Open Tender
Civil Works - Roads
Item Rate
120 days
Tuirial Hydro Power Station Mizoram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹14,114
Yes
4 Aug 2023
8 Jun 2023
14 Jul 2023
9 Jun 2023
13 Jul 2023
10 Jun 2023
10 Jun 2023 - 14 Jun 2023
Amount
Scarifying Existing Granular Surface to a min. Depth of 50 mm or as directed by the Engineer-in-Charge by Manual Means (Scarifying the existing granular road surface to a depth of 50 mm and disposal of scarified material within all lifts and leads upto 1000 metres)
Filling of Pot Hole with water bound macadam materials. Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including , hand packing, rolling, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
Prime coat: (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer using mechanical means.) Low Porosity
Open - Graded Premix Surfacing Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or cut-back or emulsion to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. Open-Graded Premix Surfacing using cationic Bitumen Emulsion
Tack coat: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at required rate on the prepared bituminous/granular surface cleaned with mechanical broom. Normal Bituminous Surface
Seal Coat: Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats. Using Bitumen 60/70 grade.
Carriage of materials including loading/unloading and stacking for sand,.. Average lead of 40 km
Carriage of materials including loading/unloading and stacking for aggregate below 40mm nominal size,.. Average lead of 80 km from Silchar
RF CONSTRUCTION & CONSULTANCY
RAHIM UDDIN KHAN
CS CONSTRUCTION
AHMED HUSSAIN BARBHUIYA
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .