| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical DVC MORE PANDAVESWAR BURDWAN BARDDHAMAN 713346 WEST BENGAL INDIA | PANDAVESWAR | BARDDHAMAN | WEST BENGAL | 713346 | - | Rejected-Technical As per TCR | |
| 3 | Rejected-Technical SALBAGAN ROAD BENACHITY DURGAPUR BARDHAMAN BARDHAMAN 713213 WEST BENGAL INDIA | DURGAPUR | BARDHAMAN | WEST BENGAL | 713213 | - | Rejected-Technical As per TCR |
Tender Value
₹4.5 L
EMD Value
₹5,600
Closing Date
25 Sept 2023, 5:00 pmClosed
Area Engineer(EandM)
Office of the General Manager Pandaveswar Area , P.O. Pandaveswar, Dist.-Burdwan, West Bengal-713346
Repairing of Boiler No. Wbl-10589 at Pit No. 9 of Madhaipur Colliery.
2023_ECL_288899_1
GM-PND/EandM/23-24/89/3172 dated 15/09/2023
Open Tender
Electrical and Maintenance Works
Item Rate
30 days
Madhaipur
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,600
11 Oct 2023
15 Sept 2023
26 Sept 2023
15 Sept 2023
25 Sept 2023
15 Sept 2023
15 Sept 2023 - 18 Sept 2023
Amount
Repairing of Boiler No. Wbl-10589 at Pit No. 9 of Madhaipur Colliery. (Inclusive of CMPF and Contractor Profit)
Damaged furnace plate - gas cutting, out dressing grinding with consumable Materials & Labour charge
New furnace BQ Plate size 1 mX 1m of thickness 16mm + 10% all ounaceweight 150kgs @Rs.225/-
Rolling Furnance Plate ,Proper fabricated 'V' & fitting at same position with consumable material and labour
B.Q. plate welding both side Shell plate and furnace plate 4 meter
Rivet work 50 nos., gas cutting, heated hammering and out by manual with consumable & labour charges @Rs. 100 each
Rivet hole BQ welding built up and hole removing with consumable & labour charges @Rs. 100 each
Same positioning riveting, cocking with materials, consumable & labour charges 50 nos. X Rs.8 = 100
Boiler cross tube gas cutting opening, dismantling out and dressing, grinding proper -V cutting with consumable and Labour charges
Boiler cross tube same positioning erection, fitting BQ welding with side 350mmX1825mmX13mm @Rs. 224.80 x 360 Kg
Stage Inspection Arrangement by Boiler inspector
Hydraulic test arrangment by Boiler inspector Director
Water filling
Valve Drilling, steam joint, nut bolt, old Valve opening, same positioning, fitting with consumables & labour Charges
Boiller fitting and commissioning steaming & running condition
Transportation Charges
Contractor profit 10%
Total impact of GST for the purpose of CTC
UNITED ENGINEERING ENTERPRISE
SABIR CONSTRUCTION
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .