Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.4 LAccepted-Finance | ₹24.4 L | L1 | Accepted-Finance L1 |
| 2 | L2₹24.4 LRejected-Finance | ₹24.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹24.4 LRejected-Finance | ₹24.4 L | L3 | Rejected-Finance L3 |
Tender Value
₹24.4 L
EMD Value
₹48,798
Closing Date
2 Apr 2026, 2:00 pmClosed
EO NP DOSTPUR
NAGRA PANCHAYAT DOSTPUR
Mo Firozpur Kala me Usma Antyeshti Asthal ka nirman karya.
2026_DOLBU_1124922_1
385/NPDSUL/2025-26
Open Tender
Civil Works
NP DOSTPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,879
Yes
FC
₹48,798
Yes
10 Apr 2026
13 Mar 2026
2 Apr 2026
13 Mar 2026
2 Apr 2026
13 Mar 2026
Earth work in surface excavation not exceeding 30 cm.in depth but exceeding 1.5 m in width etc. complete Footing, Wall As per DSR 2.1.1.
Earth work in soil cutting &filling of tractor trally of 5 km.distance etc. complete. As per Analysis
P/L cement concrete 1:5:10 cement coarse sand & 40 mm graded stone aggregate etc.complete. Footing, Apran As per DSR.4.1.10.
P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc.complete. Footing, column Below Plinth , Plinth Beam Up to plinth level .As per DSR.5.1.2
P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc.complete. Plinth level to flore level .As per DSR.5.2.2.
Mild Steel in R.C.C. Work etc. complete. As per Analysis
Centering & Shuttering in form work etc. complete. Footing As per DSR.5.9.1.
Centering & Shuttering in form work etc. complete. Column As per DSR. 5.9.6
Centering & Shuttering in form work etc. complete. Plinth Beam As per DSR.5.9.5
Centering & Shuttering in form work etc. complete. Slab, Slab Beam As per DSR 5.9.3
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete. Below Plinth As per DSR 6.1.1.
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete. Above Plinth As per DSR 6.4.1.
12 mm thick cement plaster 1:4 ratio cement coarse sand labour materials T&P etc. complete.As per DSR.13.4.1.
Kota Stone slab flooring over 20 mm thick base laid over and jointed with gray cement slurry mixed with pigment the slab etc complete. Stair Case As per DSR.11.26.1
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.As per DSR.13.26
Finishing walls with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade Including supply of all material, labour and T & P etc required for proper completion of the work.As per DSR.13.44.1.
Marble stone flooring with 18 mm thick marble stone, as per sample of marble approved by Engineer-in-charge, over 20 mm (average) thick base of cement mortar 1:4 (1 cement: 4 coarse sand) laid and jointed with grey cement slurry, including rubbing and polishing complete with: ded Black Zebra As per DSR 11.23.4
Earth work in surface excavation not exceeding 30 cm.in depth but exceeding 1.5 m in width etc. complete As per DSR 2.1.1.
Earth work in soil cutting &filling of tractor trally of 5 km.distance etc. complete. As per Analysis
P/L cement concrete 1:5:10 cement coarse sand & 40 mm graded stone aggregate etc.complete. As per DSR.4.1.10.
P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc.complete. Up to plinth level .As per DSR.5.1.2
P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc.complete. Plinth level to flore level .As per DSR.5.2.2.
Mild Steel in R.C.C. Work etc. complete. As per Analysis
Centering & Shuttering in form work etc. complete. Footing As per DSR.5.9.1.
Centering & Shuttering in form work etc. complete. Column As per DSR. 5.9.6
Centering & Shuttering in form work etc. complete. Plinth Beam As per DSR.5.9.5
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete.As per DSR 6.1.1.
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete.As per DSR 6.4.1.
Kota Stone slab flooring over 20 mm thick base laid over and jointed with gray cement slurry mixed with pigment the slab etc complete. As per DSR.11.26.
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.As per DSR.13.26
Finishing walls with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade Including supply of all material, labour and T & P etc required for proper completion of the work.As per DSR.13.44.1.
Steel work welded in builtup sections / frem work including cutting hoisting itc.complete. DSR.10.16.1
Providing corrugated G.S. sheet roofing including courv /vertical serface with polymer coated JR hooks etc.complete.As per DSR 12.1.1.
ridge plain As per DSR 12.1.2.
P/L damp-proof coarse 50 mm thick with cement concrete 1:2:4 cement coarse sand & 20 mm stone aggregate etc complete. As per DSR.4.11
Mild steel or Cost iron work of small size such as build up record racks etc.completion.
Earth work in surface excavation not exceeding 30 cm.in depth but exceeding 1.5 m in width etc. complete As per DSR 2.1.1.
P/L cement concrete 1:5:10 cement coarse sand & 40 mm graded stone aggregate etc.complete. As per DSR.4.1.10.
P/L cement concrete 1:1.5:3 cement coarse sand &20 mm graded stone aggregate etc.complete. Plinth level to flore level .As per DSR.5.2.2.
Mild Steel in R.C.C. Work etc. complete. As per Analysis
Centering & Shuttering in form work etc. complete. Plinth Beam As per DSR.5.9.5
Centering & Shuttering in form work etc. complete. slab As per DSR 5.9.3
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete.As per DSR 6.1.1.
M-150 brick Work in 1:4 cement coarse sand mortor in i/c labour material T&P etc.complete.As per DSR 6.4.1.
12 mm thick cement plaster 1:4 ratio cement coarse sand labour materials T&P etc. complete.As per DSR.13.4.1.
Kota Stone slab flooring over 20 mm thick base laid over and jointed with gray cement slurry mixed with pigment the slab etc complete. As per DSR.11.26.1
Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.As per DSR.13.26
Finishing walls with one coat of water proof cement paint of approved quality on previously old treated surface with this paint to give an even shade Including supply of all material, labour and T & P etc required for proper completion of the work.As per DSR.13.44.1.
Plumbering work all plumb cock and pipe fitting etc complete.
Handpump with submerciable
HIGH MAST
Earth work in soil cutting &filling of tractor trally of 5 km.distance etc. complete. As per Analysis
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2096542.pdf
techsummary_2096542.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.07 MB
BOQ_2096542.xls
BOQ • 0.26 MB
385.pdf
Tender Documents • 1.06 MB
Download all tender documents and submit your bid