Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1Admitted-Finance | ₹1 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Ramesh Kumar Construction L1 |
|---|---|---|---|---|
| 1.00 | Operation and maintenance of tube wellsRegular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing or rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells.It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document or scope of work complete in all respect and as directed by engineer in-charge. | 48 | Per Tube Well Per Month | 1,700 ₹81,600 Lowest |
| 2.00 | Operation and maintenance of pump housesRegular operation and maintenance of pump houses located at WSS Complex or Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal or Monoblock pump or motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction or delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing or rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS or CI or AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | 12 | Per Pump House per Month | 1,750 ₹21,000 Lowest |
| 3.00 | Maintenance of Distribution or Rising Main Pipe Line Network Repair and maintenance of existing distribution or rising main pipe line system consisting of AC Pressure Pipeline or PVC or uPVC or HDPE or CI or DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution or rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil or hard soil including cutting of Bituminous or Cement Concrete or WBM or WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit or trench by excavated soil by ramming it at all sides of pipes and upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T and P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation | 12 | Per Month | 8,000 ₹96,000 Lowest |
Tender Value
₹2.0 L
EMD Value
₹3,974
Closing Date
27 Jul 2026, 6:00 pmClosed
Unit Head RIICO Neermana
Office of The Unit Head RIICO Ltd Neemrana
as per BoQ
2026_RIICO_575235_1
15/2026-2027/01-08/1058/03
Open Tender
Civil Works
Percentage
365 days
Sotanala
AS PER TD
3 documents required · 3 mandatory
₹236
RIICO
₹3,974
30 Jul 2026
17 Jul 2026
28 Jul 2026
17 Jul 2026
27 Jul 2026
17 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation and maintenance of tube wellsRegular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing or rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells.It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document or scope of work complete in all respect and as directed by engineer in-charge. | 48 | Per Tube Well Per Month | - | - |
| 2 | Operation and maintenance of pump housesRegular operation and maintenance of pump houses located at WSS Complex or Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Areaat supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal or Monoblock pump or motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction or delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing or rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pumpsets with regular up-keepment of log books, repair of leakages in pump glans and MS or CI or AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | 12 | Per Pump House per Month | - | - |
| 3 | Maintenance of Distribution or Rising Main Pipe Line Network Repair and maintenance of existing distribution or rising main pipe line system consisting of AC Pressure Pipeline or PVC or uPVC or HDPE or CI or DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution or rising main pipeline of all sizes by digging out suitable size of pit in soft and loose soil or hard soil including cutting of Bituminous or Cement Concrete or WBM or WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit or trench by excavated soil by ramming it at all sides of pipes and upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T and P, however the pipe line and jointing materials, sluice valves, etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of transportation | 12 | Per Month | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
TD3.pdf
Tender Documents • 0.19 MB
BOQ_1022988.xls
BOQ • 0.27 MB
TermsCond.pdf
PDF • 0.08 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].