| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹20.0 LAdmitted-Finance | +0.00% | ₹20.0 L | L1 | Admitted-Finance |
| 2 | L2₹20.5 L+₹50,000 (2.50%)Admitted-Finance | +2.50% | ₹20.5 L+₹50,000 (2.50%) | L2 | Admitted-Finance |
| 3 | L3₹20.6 L+₹63,999.99 (3.20%)Admitted-Finance | +3.20% | ₹20.6 L+₹63,999.99 (3.20%) | L3 | Admitted-Finance |
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
6 Aug 2026, 11:00 amClosed
Executive Engineer (Works) Z P Kolhapur
Executive Engineer (Works) Z P Kolhapur
Construction of BT Concreting Road From Khochi Fhata to Piracha Darga at Buvache Vathar Taluka Hatkananagle Dist Kolhapur ( Under MLA Fund) (Length 212 and Width 4.00) ( Latitude 16.39 N Longitude 74.38 E)
2026_KOLHA_1320649_9
E TENDER NOTICE NO 24/2026-27
Open Tender
Civil Works
Percentage
KOLHAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,000
₹20,000
14 Aug 2026
23 Jul 2026
7 Aug 2026
23 Jul 2026
6 Aug 2026
23 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50 metre and spreading for embankment or stacking as directed. By Mechanical Means.
Item / Page No : 11 / 23
Specification No : MORTH-301
Spec. Page No : 45-53 | 1 | Cubic Metre | 1 | ₹1 |
| 2 | Supplying trap metal of required size by bringing the boulders / rubble at the road side breaking them to required gradation including conveying the boulders / rubble and stacking the broken metal, excetra complete. (Prior approval of sample stack of broken metal by the Executive Engineer is necessary the date of approval will form part of the measurements) - 60 milimetre metal, by breaking rubble obtained by blasting. (Hand broken).
Item / Page No : 54 / 345
Additional Specifications : 1. Work shall be carried out as per the instructions of Engineer In-Charge. 2. Prior approval of sample stack of broken metal by the Executive Engineer is necessary. The date of approval will form part of the measurements. | 1 | Cubic Metre | 1 | ₹1 |
| 3 | Supplying hard murum / kankar at the road site, including conveying and stacking, excetra complete.
Item / Page No : 29a / 25
Specification No : MORTH-408
Spec. Page No : 139-142 | 1 | Cubic Metre | - | - |
| 4 | Spreading 60 mm metal for road work including sectionong, excetra complete as directed by Engineer in charge.
Item / Page No : 58A / 346
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | 1 | Cubic Metre | - | - |
| 5 | Spreading hard murum / soft murrum / gravel or kankar for side width, excetra complete.
Item / Page No : 30 / 25
Specification No : MORTH-408
Spec. Page No : 139-142 | 1 | Cubic Metre | 1 | ₹1 |
| 6 | Compacting the sub grade/gravel/oversize metal (200 milimetre loose) layers for all width with Power roller having weight 8 to 10 MT. including necessary, labour, materials and artificial watering complete.
Item / Page No : 59 / 346
Additional Specifications : Work shall be carried out as per the instructions of Engineer In-Charge. | - | Square Metre | - | - |
| 7 | Compacting the hard murum side widths including laying in layers on each side with vibratory roller including artificial watering, excetra complete.
Item / Page No : 31 / 25
Specification No : MORTH-408
Spec. Page No : 139-142 | 1 | Square Metre | - | - |
| 8 | Providing and constructing 75 milimetre thick modified penetration macadam road surface including all materials, preparing the existing road surface, spreading 40 milimetre stone metal layers 30 percent crusher broken metal plus 70 percent hand broken (by breaking rubble obtained by blasting), heating and spraying the bitumen of of specified grade at the rate of 2 kilogram per square metre, spreading 12 milimetre size chips, compacting with three wheel static roller having weight 8 to 10 metric tonnes to achive the desired degree of compaction as per technical specification Clause 506, excetra complete. Including picking of existing water bound macadam surface. (Using VG-30 bulk bitumen)
Item / Page No : 35a / 31
Specification No : IRC-SP-20
Spec. Page No : 215 | - | Square Metre | - | - |
| 9 | Providing 20 milimetre thick premix bituminous carpet including supplying all materials, preparing and cleaning the base, heating bitumen, applying tack coat at specified rate, mixing hot bitumen and chips, laying the carpet layer and compacting, excetra complete. By bulk asphalt.. (Excluding Tack Coat) (Cold Mix with prior approval) (Basic Carpet Rate approved by S.E. P.W. Circle, Ratnagiri Vide Letter No 3828 dated 23/09/2022)
Item / Page No : 7-New / 0
Specification No : MORTH-503
Spec. Page No : 168-170
Additional Specifications : The work shall be carried out as directed by Engineer-In-Charge. | - | Square Metre | - | - |
| 10 | Providing bituminous type-A liquid seal coat on bituminous surface including supplying all materials and bitumen of VG-30 grade, preparing existing road surface, heating and applying bitumen at the rate of 0.98 kilogram per square metre by mechanical means, spreading chips and rolling by static roller having weight 8 to 10 metric tonne, excetra complete.
Item / Page No : 1 / 35
Specification No : MORTH-511
Spec. Page No : 149-162, 205-207, 198-205, 417-421, 19-21 | - | Square Metre | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_2262915.xls
BOQ • 0.26 MB
SBD_2026_27.pdf
Tender Documents • 2.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .