Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.34Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹3.37+₹0.03 (0.90%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹3.43+₹0.09 (2.69%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L3₹3.43+₹0.09 (2.69%)Admitted-Finance | L3 | Admitted-Finance | |
| 5 | L3₹3.43+₹0.09 (2.69%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Hybrid Power ventures L2 | MIHIR YADAV L5 | anurag bhadana L1 | VEDVATI YADAV L5 | ETRICA POWER L14 | NACOF OORJA PRIVATE LIMITED L15 | jaspreet kaur L3 | ashok kumar L9 | Suresh Yadav L6 | abhisek meena L7 | VIKAS YADAV L8 | KASLIWAL TRADING CORPORATION L11 | RAJENDRA YADAV L3 | VIPUL BHARDWAJ L4 | ANCHI YADAV L13 | SHARWAN LAL SANKHALA L8 | JAGAN NATH JAT L10 | YAJWA SUNPOWER L12 | Udisha Hansaria L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | AASTI | 2.68 | MW | - | - | - | - | - | - | 3.43 ₹3.43 Lowest | - | - | - | - | - | - | - | - | - | - | - | - |
| 2.00 | BADHAL ROHI | 2.54 | MW | - | - | - | - | - | 3.45 ₹3.45 Lowest | - | - | - | - | - | - | - | - | - | 3.98 ₹3.98 | - | - | - |
| 3.00 | BEGUS | 4.76 | MW | - | - | - | - | - | 3.51 ₹3.51 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 4.00 | BEGUS | 4.78 | MW | - | - | - | - | - | 3.51 ₹3.51 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 5.00 | BEGUS | 2.9 | MW | - | - | - | - | - | 3.46 ₹3.46 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 6.00 | BHAISLANA | 1.27 | MW | - | - | - | - | - | 3.43 ₹3.43 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 7.00 | BICHOON | 1.41 | MW | - | - | 3.34 ₹3.34 Lowest | - | - | 3.41 ₹3.41 | - | - | - | - | - | 3.39 ₹3.39 | - | - | - | - | - | - | - |
| 8.00 | BOBAS | 2.73 | MW | - | - | - | - | - | 3.46 ₹3.46 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 9.00 | CHAKSU | 4.6 | MW | - | - | - | - | 3.47 ₹3.47 | 3.41 ₹3.41 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
| 10.00 | CHIMANPURA | 3.47 | MW | - | - | - | - | - | 3.51 ₹3.51 Lowest | - | - | - | - | - | - | - | - | - | - | - | - | - |
Tender Value
Refer Docs
EMD Value
₹2.5 Cr
Closing Date
20 Sept 2023, 5:00 pmClosed
ACE(PPM),JVVNL, Jaipur
Office of the Addl.Chief Engineer (PPM), Old Power House Ram Mandir, Jaipur-302006
Design, survey, supply, installation, testing, commissioning, operation and maintenance for 25 years from COD of grid connected solar power plants through RESCO mode, its associated 33kV OR, 11kV line to connect the plant various 33/11kV sub-stations
2023_JVVNL_335615_1
TN 03
Open Tender
Solar Power Plants
Item Wise
270 days
Jaipur Discom
As per Tender Documents
3 documents required · 3 mandatory
₹11,800
As per Tender Documents
₹2.5 Cr
Yes
Conference Hall, 1st Floor, Vidyut Bhawan,
7 Dec 2023
13 May 2023
22 Sept 2023
15 May 2023
20 Sept 2023
10 Jun 2023
13 May 2023 - 5 Jun 2023
5 Jun 2023
AASTI
BADHAL ROHI
BEGUS
BEGUS
BEGUS
BHAISLANA
BICHOON
BOBAS
CHAKSU
CHIMANPURA
DANGARWARA
DEHLALA
DOONGARI KHURD
DOULATPURA
GARUDWASI
HANUTPURA
HASANPURA
JAGATPURA
KALADERA RURAL
KARANSAR
KHEJROLI
Khelna
KISHANMANPURA
KOTKHAWADA
LADANA
LOCHU KA BAS
RATANPURA
GOVINDPURA BASRI
Kariri
ASALPUR
SAIWAD
JAWANPURA
JAWANPURA
CHAK MANOHARPUR
Hybrid Power ventures
jaspreet kaur
RAJENDRA YADAV
Udisha Hansaria
VIPUL BHARDWAJ
VEDVATI YADAV
MIHIR YADAV
Suresh Yadav
abhisek meena
VIKAS YADAV
SHARWAN LAL SANKHALA
ashok kumar
JAGAN NATH JAT
KASLIWAL TRADING CORPORATION
YAJWA SUNPOWER
ANCHI YADAV
ETRICA POWER
NACOF OORJA PRIVATE LIMITED
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
120824411.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .