Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance NO 13 26 VINAYAGAR KOVIL STREET SASTHRI NAGAR WEST SAIDAPET CHENNAI 15 | 15 | -5.00% | ₹7.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.0 L+₹66.63 (<0.01%)Admitted-Fee/PreQual/Technical/Finance | -4.99% | ₹7.0 L+₹66.63 (<0.01%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.4 L
EMD Value
₹7,500
Closing Date
20 Aug 2026, 3:00 pmClosed
ZONAL_OFFICER_ZONE_14
No_ 6_64_ Puzhuthivakkam Main road Puzhuthivakkam Chennai 600 091
RETENDER Z.O.XIV.C.NO.E1/0349/2026 Construction of Road Side Compound wall at Annai Sathya Nagar Main Road IN DIVISION- 182, UNIT-41, ZONE-14.
2026_CoC_694254_1
RETENDER Z.O.XIV.C.NO.E1/0349/2026
Open Tender
Civil Works
Works
60 days
GREATER_CHENNAI_CORPORATION_ZONE_14
REFER TENDER DOCUMENT
5 documents required · 5 mandatory
₹0
₹7,500
21 Aug 2026
14 Aug 2026
21 Aug 2026
14 Aug 2026
20 Aug 2026
14 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing RCC 25cm (10") dia under reamed piles of...fications (excluding costof steel reinforcement). | 26 | NOS | 5,107 | ₹1,32,782 |
| 2 | Earth work excavation for foundation in all kinds ...lling the sides with excavated earth etc. complete | 6 | CUM | 151.3 | ₹907.8 |
| 3 | Supplying stone dust and filling in regular laye...ting etc. complete for foundation, basement, etc. | 3 | CUM | 492.73 | ₹1,478.19 |
| 4 | Plain Cement concrete work 1:4:8 (1 cement, 4 Crus..., etc. complete for foundation, etc. upto basement | 3 | CUM | 5,616 | ₹16,848 |
| 5 | Supplying and erecting shuttering including necess...dia spaced at 75cmcentre to centre etc. complete. | 113 | SQM | 836.55 | ₹94,530.15 |
| 6 | Supplying and placing of Ready Mix M20 Graded of C...finishing etc as directed by departmental officers | 10 | CUM | 8,847 | ₹88,470 |
| 7 | Brick work using best quality II class Ground mou...tc complete complying with standard specification. | 12 | CUM | 7,612 | ₹91,344 |
| 8 | Supplying, fabricating and placing in position Rib...ngements for the supply of steel and binding wire) | 1,453 | KGS | 94 | ₹1,36,582 |
| 9 | Plastering with cement mortar 1:4 (1 cement and 4 ... sand)12mm thick including curing, etc., complete. | 169 | SQM | 283.76 | ₹47,955.44 |
| 10 | Painting the new plastered walls with two coats of...tion and the durability period should be 5 years. | 169 | SQM | 269.38 | ₹45,525.22 |
stage.html
html • 0.02 MB
finance_834664.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.85 MB
0349.pdf
Tender Documents • 1.70 MB
BOQ_834664.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .