Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹24.0 L
Closing Date
22 Feb 2021, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINA
EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINAGAR
Construction of Production Tube at Badil Saab Arigam Tral District Pulwama
2021_PHE_116979_1
E-NIT No -PHE/GWDS 58 of 02/2021 Dated 16-02-2021
Open Tender
Drilling Works
Item Rate
30 days
PULWAMA
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
EXECUTIVE ENGINEER PHE GROUND WATER DIVISION SRINA
Exempted
24 Feb 2021
17 Feb 2021
23 Feb 2021
17 Feb 2021
22 Feb 2021
17 Feb 2021
17 Feb 2021 - 22 Feb 2021
180 days
Amount
Description of Work / Item(s)
Amount
Reaming/drilling of pre-drilled Pilot Bore Hole for Construction of production well based on results of exploration data by a suitable method of drilling viz Direct circulation method / Reverse circulation method up to the desired depth as per the relevant IS codes of practice for construction and testing of tube wells /Bore wells, with time to time amendments in all kinds of soils , Boulders , Rocks , Collapsible strata , saturated soils etc with the requisite accessories required there of including Bentonite mud , foam , water Lubricants etc. The drilled bore hole is reamed up for open drilling and completed to the desired depth. Technical Features of Bore Well: Depth of Well ……. < 150 M Dia of Well …….. ≥ 500/550 mm
Providing, fitting of Heavy duty MS Casing pipe confirming to relevant IS Codes with the time to time amendments and the slotted / strainer pipes also confirming to Relevant IS Codes at the site of well Construction of well. The welding electrodes used for welding the casing pipes together are super bond / Esab /L&T only. The jigs and fixtures for lowering the casing pipe are provided by the firm. Providing and fitting of Bail Plug/Bottom Plug of required dia at the bottom of the pipe assy of the well as per IS: 2800 (Part I). Technical Features of Pipe: Min Dia of Casing Pipe ………… 300mm Thickness of Pipe ……… 08 mm Max. depth of Pipe ……… 150 Mts Slotted Pipe ………… At appropriate Aquifer Zones. Acceptable make for pipe ……… Jinadal/Prakash Surya/TATA. Class of pipe …. C class conforming to IS:1239 (Part Ist) 2004, equivalent to BS -1387/1985. Slot Size … 1.6/3.2 mm. For 300 mm dia MS Blind Pipe (80 Mtr) For 300 mm dia MS Slotted Pipe (40 Mtr)
The annular space between the casing pipe and the well surface has to be filled with a gravel pack to act as a filter medium. The Gravel Pack used as pack in tube well is specified as per ISO 4097. (Quantity shall be subject to the actual measurements at site).
Development of Tube Well shall be done in accordance with IS: 2800 Part Ist IS: 11189 to establish usable water yield without sand content with required capacity of Air Compressor. Running the compressor of required capacity till the well is fully developed. After completion of development the well is tested for its performance that is yield characteristics. Measuring of yield by V-Notch method or any other approved method. Job includes measuring of Static and Draw Down Levels of the well. The grounding and sealing of tube well has to be done to ensure safe sanitary conditions. An apron around the well (mix shall be M10 grade) & slopping away from it to protect the well from pollution has to be constructed to prevent contaminated water flowing back into it. The casing pipe is to be anchored within the apron by welding ISMC-150 steel bracing with crates & sufficient welding area 2 mtr length each bracing embedded within the apron (4 bracing). The complete well thus constructed is to be handed over to the territorial mechanical division for harnessing. Technical Specifications:- Minimum Run for Compressor …… 40 Hrs Yield Test for Water (till desired results) …… Min 30 Hrs i. Apron Size= 2.5 mtr × 2.5 mtr. ii. Apron depth at skirt = 300 mm. iii. Apron depth at well casing= 350 mm.
M/S CHINAR DRILLERS
ZAKIR BOREWELLS
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .