| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 LAdmitted-Finance DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹2,185.75 (0.96%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹2.3 L+₹7,233.40 (3.18%)Admitted-Finance | L3 | Admitted-Finance | |
| 4 | L4₹2.3 L+₹7,355 (3.24%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹2.4 L+₹13,632.40 (6.00%)Admitted-Finance | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MH CONSTRUCTION COMPANY L3 | ISHTIAQ AHMAD MALIK L4 | LATFULLAH SHEIKH L2 | SAQIB SAJJAD L5 | KULDEEP SINGH L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing and Fixing of PVC Panel having dimensions 3048 mm x 406 mm x 12 mm in the Office Building of Mechanical & Hospital Sub Division Complex Kishtwar by way of P/ Fixing of MS Steel frame made out of 20 x 15 x 05 mm thick channel section duly fixed with fastners, self drilling screws extruded out for aluminium frames in the walls. The job includes cost of material, tools and tackles, carriage, transportation and all taxes.
Area
16 x 6 = 96 x 04 Walls = 384 ft2
12 x 6 = 72 x 02 Walls = 144 ft2
14 x 6 = 84 x 02 Walls = 168 ft2
14 x 6 = 8 x 04 Walls = 336 ft2
45 x 06 = 270 ft2
08 x 06 = 48 x 02 Walls = 96 ft2
14 x 10 = 140 ft2
22 x 16 = 352 ft2
Total Area = 1890 ft2 = 175.58 M2 | 175.58 | m2 | 750 ₹1,31,685 | 850 ₹1,49,243 | 560 ₹98,324.8 Lowest | 850 ₹1,49,243 | 700 ₹1,22,906 |
| 2.00 | Providing and Fixing of PVC Panel in the Office Building of Mechanical & Hospital Sub Division Complex Kishtwar by way of P/ Fixing of MS Steel frame made out of 20 x 15 x 05 mm thick channel section duly fixed with fastners, self drilling screws, ceiling holding wire extruded out for aluminium frames in the ceiling. The job includes P/F of PVC ceiling panel 3048 mm x 204 mm x 08 mm thick on the by means of fastners and screws. The job includes cost of material, tools and tackles, carriage, transportation and all taxes.
Area
16 x 16 = 256 ft2
14 x 14 = 196 ft2
14 x 12 = 168 ft2
10 x 14 = 140 ft2
14 x 06 = 84 ft2
Total Area = 844 ft2 = 78.41 M2 | 78.41 | m2 | 470 ₹36,852.7 | 430 ₹33,716.3 Lowest | 525 ₹41,165.25 | 570 ₹44,693.7 | 630 ₹49,398.3 |
| 3.00 | Providing and Fitting of Premium vertical window blinds (07 feet x 06 feet) – 06 No along with allied accessories. The job also includes cost of hydraulic door closer – 03 No, door curtain 09 feet – 06 No along with rod and clamps. The job includes cost of material, tools and tackles, skilled labour, carriage and all taxes as applicable. | 1 | job | 23,000 ₹23,000 | 22,500 ₹22,500 Lowest | 35,000 ₹35,000 | 25,000 ₹25,000 | 30,000 ₹30,000 |
| 4.00 | Providing / Laying of electrical circuit by way of laying of electric copper wire 2.5 sqm – 02 rolls, electric copper wire 1.5 sqm – 06 rolls, copper wire 1.0 sqm – 04 rolls along with LED Ceiling Panels (01 x 01) feet 12 watt – 24 No., Office Deluxe Table 2.5 feet x 03 feet – 01 No. The job includes dismantling the existing electric switch boards and fixing in alignment with the wall panels. The job includes cost of material, skilled labour charges, testing the circuit on load, tools and tackles, carriage, transportation and all taxes. Complete Job | 1 | job | 43,000 ₹43,000 | 29,200 ₹29,200 | 55,000 ₹55,000 | 22,000 ₹22,000 Lowest | 25,000 ₹25,000 |
Tender Value
₹2.9 L
EMD Value
₹5,800
Closing Date
25 Jul 2026, 12:00 pmClosed
EXECUTIVEV ENGINEER M AND H DIVISION DODA
KHELLANI
Renovation Renovation Fixing of Renovation Renovation Fixing of PVC Wall Paneling and allied works in the Mechanical Hospital Complex in Kishtwar
2026_PWDJK_315123_1
MHDD/TS/2026-27/19
Open Tender
Civil Works - Others
Turn-key
20 days
KISHTWAR
AS PER SBD
2 documents required · 2 mandatory
₹500
EXECUTIVEV ENGINEER M AND H DIVISION DODA
₹5,800
30 Jul 2026
8 Jul 2026
25 Jul 2026
8 Jul 2026
25 Jul 2026
8 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and Fixing of PVC Panel having dimensions 3048 mm x 406 mm x 12 mm in the Office Building of Mechanical & Hospital Sub Division Complex Kishtwar by way of P/ Fixing of MS Steel frame made out of 20 x 15 x 05 mm thick channel section duly fixed with fastners, self drilling screws extruded out for aluminium frames in the walls. The job includes cost of material, tools and tackles, carriage, transportation and all taxes.
Area
16 x 6 = 96 x 04 Walls = 384 ft2
12 x 6 = 72 x 02 Walls = 144 ft2
14 x 6 = 84 x 02 Walls = 168 ft2
14 x 6 = 8 x 04 Walls = 336 ft2
45 x 06 = 270 ft2
08 x 06 = 48 x 02 Walls = 96 ft2
14 x 10 = 140 ft2
22 x 16 = 352 ft2
Total Area = 1890 ft2 = 175.58 M2 | 175.58 | m2 | 100 | ₹17,558 |
| 2 | Providing and Fixing of PVC Panel in the Office Building of Mechanical & Hospital Sub Division Complex Kishtwar by way of P/ Fixing of MS Steel frame made out of 20 x 15 x 05 mm thick channel section duly fixed with fastners, self drilling screws, ceiling holding wire extruded out for aluminium frames in the ceiling. The job includes P/F of PVC ceiling panel 3048 mm x 204 mm x 08 mm thick on the by means of fastners and screws. The job includes cost of material, tools and tackles, carriage, transportation and all taxes.
Area
16 x 16 = 256 ft2
14 x 14 = 196 ft2
14 x 12 = 168 ft2
10 x 14 = 140 ft2
14 x 06 = 84 ft2
Total Area = 844 ft2 = 78.41 M2 | 78.41 | m2 | 100 | ₹7,841 |
| 3 | Providing and Fitting of Premium vertical window blinds (07 feet x 06 feet) – 06 No along with allied accessories. The job also includes cost of hydraulic door closer – 03 No, door curtain 09 feet – 06 No along with rod and clamps. The job includes cost of material, tools and tackles, skilled labour, carriage and all taxes as applicable. | 1 | job | 100 | ₹100 |
| 4 | Providing / Laying of electrical circuit by way of laying of electric copper wire 2.5 sqm – 02 rolls, electric copper wire 1.5 sqm – 06 rolls, copper wire 1.0 sqm – 04 rolls along with LED Ceiling Panels (01 x 01) feet 12 watt – 24 No., Office Deluxe Table 2.5 feet x 03 feet – 01 No. The job includes dismantling the existing electric switch boards and fixing in alignment with the wall panels. The job includes cost of material, skilled labour charges, testing the circuit on load, tools and tackles, carriage, transportation and all taxes. Complete Job | 1 | job | 100 | ₹100 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.93 MB
BOQ_1021222.xls
BOQ • 0.29 MB
cor1.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .