| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹75.9 L+₹44,037 (0.58%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹75.9 L+₹46,577.04 (0.62%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Rejected-Technical VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION | |
| 5 | Rejected-Technical AZAMGARH | FARRUKHABAD | UTTAR PRADESH | 209501 | - | Rejected-Technical NOT QUALIFIED WITH TECHNICAL SPECIFICATION |
| Sl No | Description | Qty | Unit | devendra kumar pandey L3 | M/S DHIRENDRA KUMAR PANDEY L1 | Ms Ram Nath Shukla Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling of C.C. Lining at the point of old V.R.B. and its stacking/proper disposal as disected by engg. incharge within distance of 60M. | 904.45 | SQM | 37 ₹33,464.65 | 37 ₹33,464.65 | 30 ₹27,133.5 Lowest |
| 2.00 | Dismantling of Cement Concrete and its stacking/proper disposal as disected by engg. incharge within distance of 60M. | 50.04 | CUM | 331 ₹16,563.24 | 280 ₹14,011.2 | 250 ₹12,510 Lowest |
| 3.00 | Dismantling of R.C.C. Slab and its stacking/proper disposal as disected by engg. incharge within distance of 60M. | 13.07 | CUM | 703 ₹9,188.21 | 703 ₹9,188.21 | 600 ₹7,842 Lowest |
| 4.00 | Dismantling of brick work in cement mortar and its stacking/proper disposal as disected by engg. incharge within distance of 60M. | 166.3 | CUM | 518 ₹86,143.4 | 518 ₹86,143.4 | 400 ₹66,520 Lowest |
| 5.00 | E/W in excavation in foundation for Re- Construction of V.R.B. including cost of dismantalling of Old F.B. with proper disposal of dismantalled material on diversion road and approach road / ramp . | 694.02 | CUM | 119 ₹82,588.38 Lowest | 119 ₹82,588.38 Lowest | 119 ₹82,588.38 Lowest |
| 6.00 | De-watering as per required including cost of all Expenditure with proper completion of work. | 3 | JOB | 10,000 ₹30,000 Lowest | 10,000 ₹30,000 Lowest | 10,000 ₹30,000 Lowest |
| 7.00 | Laying C.C. 1:3:6 (M-10) in foundation with hard stone ballast 20-40mm size with coarse sand including cost of all material, labour and T&P etc. | 117 | CUM | 7,750 ₹9,06,750 Lowest | 7,750 ₹9,06,750 Lowest | 7,750 ₹9,06,750 Lowest |
| 8.00 | Supplying & filling of local sand below wing and below Bed level from lining including cost of all material, labour and T&P etc. | 304.72 | CUM | 1,140 ₹3,47,380.8 | 1,140 ₹3,47,380.8 | 900 ₹2,74,248 Lowest |
| 9.00 | Ist class brick work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P | 219.82 | CUM | 6,400 ₹14,06,848 Lowest | 6,400 ₹14,06,848 Lowest | 6,605 ₹14,51,911.1 |
| 10.00 | Ist class brick work in 1:3 C.M. with coarse sand including cost of all material, labour and T&P | 122.64 | CUM | 6,811 ₹8,35,301.04 Lowest | 6,811 ₹8,35,301.04 Lowest | 6,811 ₹8,35,301.04 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
14 Oct 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
O/O SE XITH CIRCLE IW AYODHYA
AS PER NIT04 LOT1
2025_UPIDC_1080307_1
04/SE-XI/2025-26
Open Tender
Civil Works - Bridges
Item Rate
45 days
AMBEDKAR NAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,358
₹1.6 L
O/O SE XITH CIRCLE IW AYODHYA
31 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
14 Oct 2025
7 Oct 2025
8 Oct 2025
Amount
Dismantling of C.C. Lining at the point of old V.R.B. and its stacking/proper disposal as disected by engg. incharge within distance of 60M.
Dismantling of Cement Concrete and its stacking/proper disposal as disected by engg. incharge within distance of 60M.
Dismantling of R.C.C. Slab and its stacking/proper disposal as disected by engg. incharge within distance of 60M.
Dismantling of brick work in cement mortar and its stacking/proper disposal as disected by engg. incharge within distance of 60M.
E/W in excavation in foundation for Re- Construction of V.R.B. including cost of dismantalling of Old F.B. with proper disposal of dismantalled material on diversion road and approach road / ramp .
De-watering as per required including cost of all Expenditure with proper completion of work.
Laying C.C. 1:3:6 (M-10) in foundation with hard stone ballast 20-40mm size with coarse sand including cost of all material, labour and T&P etc.
Supplying & filling of local sand below wing and below Bed level from lining including cost of all material, labour and T&P etc.
Ist class brick work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P
Ist class brick work in 1:3 C.M. with coarse sand including cost of all material, labour and T&P
Centering & Shuttering for R.C.C work including cost of all material labour and T&P
Supplying & Laying Reinforcement of steel including cutting, bending, proper placing and binding with binding wire with cost of all material labour and T&P
R.C.C. 1:1.5:3 (M-20) with dala stone grit 10 mm to 20 mm gauge & coarse sand including cost of all material, labour and T&P etc.
C.C. 1:1.5:3 (M-20) with dala stone grit 4.75 mm to 20 mm gauge with coarse sand including cost of all material, labour and T&P etc.
Deep struck cement pointing in 1:2 C.M. with fine coarse sand including cost of all material, labour and T&P etc.
Supplying and fixing joint filler board 20mm thick.
Supplying & fixing of drainage spout 75 mm dia and 0.50 m long.
Ist class Brick on edge soling including preparation of subgrade and filling joint with local sand in approch Road.
Costing & fixing RCC wheel guard in parapet corner.
Painting two coat of white cement on parapet wall and painting two coat of surface weather coat enamel paint on new surface.
Supplying & fixing Sign board for information for work
E/W in making canal section including all lead lift and mauuanl compaction with dressing etc.
Making sub grade for lining work including watering and compaction for perparation of sub grade.
Shutering for 150 mm thick CC work in canal lining sleeper costing and other works.
Painting top of Sleeper with bitumin cost of all materials labour, fuel for heating, T&P etc.
S/L LDPE Film 200 micron in Bed with cost of all material Labour and T&P etc.
S/L P.V.C. rubber Seal (150 mm x 6 mm) on joints of sleeper with cost of material labour and T&P etc.
Repairing and Re-Construction of C.C. Lining with curing Drain cum daula after construction of V.R.B. including cost of all material, labour and T&P etc with proper complition of work.
Making construction joint Painting with Sealing primer and filling with sealing compound including cost of all material labour and T&P etc
C.C. 1:2:4 (M-15) with dala stone grit 4.75 mm to 20 mm gauge with coarse sand including cost of all material, labour and T&P etc.
12 mm thick cement plaster in curing drain work in 1:4 C.M. with coarse sand including cost of all material, labour and T&P
Ms Ram Nath Shukla Contractor (BID ID -5601055)
devendra kumar pandey (BID ID -5601101)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .