| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹62.2 LAdmitted-Finance | -35.64% | ₹62.2 L | L1 | Admitted-Finance |
| 2 | L2₹73.5 L+₹11.3 L (18.1%)Admitted-Finance | -23.99% | ₹73.5 L+₹11.3 L (18.1%) | L2 | Admitted-Finance |
Tender Value
₹96.6 L
EMD Value
₹1.9 L
Closing Date
4 Aug 2026, 4:00 pmClosed
Executive Engineer Rnb Divisdion Dalgate Srinagr
Executive Engineer Rnb Divisdion Dalgate Srinagr
Construction of facilitation Centre Cum Accommodation facility at Dalgate Srinagar
2026_PWDJK_318578_1
Nit-41/e-tend/2026-27/5033-40 dtd.29-07-2026
Open Tender
Civil Works
Percentage
180 days
Dalgate Srinagar
as per Nit
2 documents required · 2 mandatory
₹1,600
Executive Engineer Rnb Divisdion Dalgate Srinagr
₹1.9 L
8 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
4 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Engagement of JCB for leveling of ground removal of undulations, slops, ridges as per direction of EIC complete in all respects. | 7 | Hrs | 847.46 | ₹5,932.22 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: Ordinary Rock. | 147.26 | Cum | 418.22 | ₹61,587.08 |
| 3 | P/L stone soling (Hand packed) in trenches incl. ramming, dressing, watering etc. incl. all leads, lifts and carriage upto site of work complete. | 26.32 | Cum | 805.08 | ₹21,189.71 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 18.14 | Cum | 4,409.24 | ₹79,983.61 |
| 5 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size). | 31.74 | Cum | 6,165.47 | ₹1,95,692.02 |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 98.26 | Cum | 5,585.81 | ₹5,48,861.69 |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 78.2 | Cum | 8,323.6 | ₹6,50,905.52 |
| 8 | Brick work with common burnt clay selected bricks of class designation 7.5 in exposed brick work including making horizontal and vertical grooves 10mm wide 12mm deep complete in cement mortar 1:6 (1 cement: 6 coarse sand) including curing complete in: Above plinth level and upto floor V level. | 169.35 | Cum | 7,650.17 | ₹12,95,556.29 |
| 9 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in: Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 5.94 | Cum | 6,416.57 | ₹38,114.43 |
| 10 | Providing and fixing factory made UPVC white colour casement/casement cum fixed glazed windows comprising of UPVC multi-chambered frame, sash and mullion (where ever required) extruded profiles duly reinforced with 1.60 ± 0.2 mm thick galvanized mild steel section made from roll forming process of required length (shape & size according to uPVC profile), uPVC extruded glazing beads of appropriate dimension, EPDM gasket, stainless steel (SS 304 grade) friction hinges, zinc alloy (white powder coated) casement handles, G.I fasteners 100 x 8 mm size for fixing frame to finished wall, plastic packers, plastic caps and necessary stainless steel screws etc. Profile of frame & sash shall be mitred cut and fusion welded at all corners, mullion (if required) shall be also fusion welded including drilling of holes for fixing hardware's and drainage of water etc. After fixing frame the gap between frame and adjacent finished wall shall be filled with weather proof silicon sealant over backer rod of required size and of approved quality, all complete as per approved drawing & direction of Engineer-in-Charge. (Single / double glass panes and silicon sealant shall be paid separately) Note: For UPVC frame, sash and mullion extruded profiles minus 5% tolerance in dimension i.e. in depth & width of profile shall be acceptable. Variation in profile dimension in higher side shall be accepted but no extra payment on this account shall be made. Casement window single panel with S.S. friction hinges (300 x 19 x 1.9 mm), made of (small series) frame 47 x 50 mm &sash 47 x 68 mm both having wall thickness of 1.9 ± 0.2 mm and single glass pane glazing bead of appropriate dimension. (Area of window upto 0.75 sqm.) | 55.19 | Sqm | 8,958.35 | ₹4,94,411.34 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1050722.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .