| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.0 CrAdmitted-Finance UTTAR PRADESH UP | -9.99% | ₹2.0 Cr | L1 | Admitted-Finance |
| 2 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-FY 2025-26 Turnover/Financial details missing |
| 3 | Not Admitted-Fee/PreQual/Technical NAYAPURWA POST BAHARPUR SHUKUL BAZAR DISTRICT AMETHI | - | - | - | Not Admitted-Fee/PreQual/Technical Others-(i) No minor/major bridge exp. (ii) Two machinery missing |
Tender Value
₹2.2 Cr
EMD Value
₹5.1 L
Closing Date
6 Aug 2026, 5:00 pmClosed
GM(C)
UPSIDA Complex, A-1/4 Lakhanpur Kanpur-208024
Construction of Bridge at K.M. 2.722 of Kathaura of Village Utelwa I.A. Jagdishpur, in Distt. Amethi.
2026_SIDC_1173651_1
CD-6(30) Dt.20.05.2026
Open Tender
Civil Works
Percentage
365 days
Jagdishpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,979
UPSIDA
₹5.1 L
31 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres | 138 | Ton | 1,846.4 | ₹2,54,803.2 |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 549.36 | Cum | 131.68 | ₹72,339.72 |
| 3 | Filling with available fly ash and earth (excluding rock) in trenches or
embankment in layers (each layer should not exceed 15 cm), with
intermediate layer of compacted earth (Soil density of 98%) after every
four layers of compacted depth of fly ash, sides & top layer of filling shall
be done with earth having total minimum compacted thickness 30 cm or
as decided by Engineer -in-charge, including compacting each layer by
rolling/ ramming and watering, all complete as per drawing and direction
of Engineer -in - charge. | 24.34 | Cum | 228.65 | ₹5,565.34 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 24.78 | Cum | 6,755.65 | ₹1,67,405.01 |
| 5 | Providing bored cast-in-situ M35 grade RCC piles excluding reinforcementand technical specifications | 361.6 | Rmt | 11,179.08 | ₹40,42,355.33 |
| 6 | Providing and laying in position ready mixed M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separate. | 225.82 | Cum | 8,263.75 | ₹18,66,120.03 |
| 7 | Providing and laying in position ready mixed M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separate. | 117.88 | Cum | 8,263.75 | ₹9,74,130.85 |
| 8 | Providing and laying in position ready mixed M-35 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying , excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer- in - charge. Note: - Cement content considered in this item is @ 330 kg/ cum. Excess/ less cement used as per design mix is payable/ recoverable separate. | 108.82 | Cum | 8,263.75 | ₹8,99,261.27 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 62.39 | MT | 79,800 | ₹49,78,722 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13.84 | MT | 79,800 | ₹11,04,432 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.09 MB
feeformat.xls
Tender Documents • 0.02 MB
BOQ_2204393.xls
BOQ • 0.35 MB
etenderdocument.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .