| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹1.8 L+₹16,886.58 (10.1%)Rejected-AOC TAMIL NADU | PUDUKKOTTAI | TAMIL NADU | 613301 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MENAKA CONSTRUCTION ENGINEERS | SUSAND AGENCIES |
|---|---|---|---|---|---|
| 1.00 | Charges for pump down the R22 gas in the condenser at standby compressor, brazing the new gas line valve size at 50 NB, cutting and dismantling the R22 gas line existing valves, positioning and welding the new 50NB brass valves charging of N2 gas for leak testing, vaccumising, commissioning the cooling coil B at unit III AC plant as per the direction of engineer-in-charges. | 2 | Nos | 39,280 ₹46,350.4 | 35,700 ₹42,126 Lowest |
| 1.10 | Contractors’ scope material
Brassomatic Valve | 2 | Nos | 18,500 ₹21,830 | 16,800 ₹19,824 Lowest |
| 2.00 | Charges for dismantling the belt guard 'v' belt, blower pulley with shaft, plumber block bearings at both sides disconnecting the blower housing with air handling unit dismantling the blower shaft with housing, lifting and keeping at nearby, carrying out of patch up and tinkering works inside of the air Handling Unit, positioning of the blower shaft with housing by lifting, renewal of the plumber block bearings in both sides, fixing, tightening, reassembling the pulley with bush, 'v' belt aligning belt guard and commissioning of the Air handling unit 'B' in Unit III AC Plant as per the direction of Engineer-in-charge. | 1 | Opn | 50,250 ₹59,295 | 45,675 ₹53,896.5 Lowest |
| 2.10 | Contractors’ scope material
vinyl sheet 2mm thick | 5.12 | Sqm | 3,328 ₹3,927.04 | 3,020.8 ₹3,564.54 Lowest |
| 2.20 | Contractors’ scope material
Thermocol pad 25mm thick | 10.34 | Sqm | 878.9 ₹1,037.1 | 765.16 ₹902.89 Lowest |
| 2.30 | Contractors’ scope material
GI Sheet | 98 | Kg | 11,270 ₹13,298.6 | 10,290 ₹12,142.2 Lowest |
| 3.00 | Labour Charges for cutting and removing the existing cooling coil from air handling units 'B' in Unit III after cutting the suction and discharges Refrigerant line existing pipe, re-fixing the new cooling coil with Aluminium fins, positioning properly, welding of flanges with Refrigerant suction and discharge pipe lines in both sides, assembling with new bolt & nuts, conducting leak test, commissioning as per the direction of Engineer in charge. | 1 | Opn | 27,150 ₹32,037 | 24,675 ₹29,116.5 Lowest |
| 4.00 | Charges for transporting of blower shaft with both side plumber block bearings after removal of 3 Nos. of impellers to the outside workshop, reconditioning the hallow shaft and providing both end with new stub, aligning, welding, balancing and return to site after completion of works. (Rate inclusive of materials, transporting charges, Rental for machines, T&P's and Consumables). | 1 | Opn | 20,800 ₹24,544 | 18,900 ₹22,302 Lowest |
| 5.00 | Charges for loading and unloading of new cooling coils from central stores to Air Handling unit's of Unit III AC Plant room and devolution of the wornout cooling coils as scraps to store. | 1 | LS | 6,325 ₹7,463.5 | 5,750 ₹6,785 Lowest |
| 6.00 | Charges for One coat of red oxide paint and two coats of enamel painting in AHU unit B both inner and outer side at AC Plant Unit III. | 28.36 | M2 | 6,948.2 ₹8,198.88 | 6,267.56 ₹7,395.72 Lowest |
Tender Value
Refer Docs
EMD Value
₹1,700
Closing Date
28 May 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM II ACP Replacement of defective cooling coil of AHU B and Brassomatic valve of compressor in Unit III AC Plant
2025_EB_557912_1
CE/SE/O/TTPS/Spec.No.104/25-26
Open Tender
Miscellaneous Works
Item Rate
30 days
TTPS
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹1,700
Yes
15 Sept 2025
14 May 2025
29 May 2025
14 May 2025
28 May 2025
14 May 2025
Charges for pump down the R22 gas in the condenser at standby compressor, brazing the new gas line valve size at 50 NB, cutting and dismantling the R22 gas line existing valves, positioning and welding the new 50NB brass valves charging of N2 gas for leak testing, vaccumising, commissioning the cooling coil B at unit III AC plant as per the direction of engineer-in-charges.
Contractors’ scope material Brassomatic Valve
Charges for dismantling the belt guard 'v' belt, blower pulley with shaft, plumber block bearings at both sides disconnecting the blower housing with air handling unit dismantling the blower shaft with housing, lifting and keeping at nearby, carrying out of patch up and tinkering works inside of the air Handling Unit, positioning of the blower shaft with housing by lifting, renewal of the plumber block bearings in both sides, fixing, tightening, reassembling the pulley with bush, 'v' belt aligning belt guard and commissioning of the Air handling unit 'B' in Unit III AC Plant as per the direction of Engineer-in-charge.
Contractors’ scope material vinyl sheet 2mm thick
Contractors’ scope material Thermocol pad 25mm thick
Contractors’ scope material GI Sheet
Labour Charges for cutting and removing the existing cooling coil from air handling units 'B' in Unit III after cutting the suction and discharges Refrigerant line existing pipe, re-fixing the new cooling coil with Aluminium fins, positioning properly, welding of flanges with Refrigerant suction and discharge pipe lines in both sides, assembling with new bolt & nuts, conducting leak test, commissioning as per the direction of Engineer in charge.
Charges for transporting of blower shaft with both side plumber block bearings after removal of 3 Nos. of impellers to the outside workshop, reconditioning the hallow shaft and providing both end with new stub, aligning, welding, balancing and return to site after completion of works. (Rate inclusive of materials, transporting charges, Rental for machines, T&P's and Consumables).
Charges for loading and unloading of new cooling coils from central stores to Air Handling unit's of Unit III AC Plant room and devolution of the wornout cooling coils as scraps to store.
Charges for One coat of red oxide paint and two coats of enamel painting in AHU unit B both inner and outer side at AC Plant Unit III.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .