Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-Finance NEW MADHOPUR COLONY SURAJKUND GORAKHPUR UTTAR PRADESH 273001 | GORAKHPUR | UTTAR PRADESH | 273001 | L1 | Accepted-Finance 1st Lowest Bidder | |
| 2 | L2₹3.8 L+₹1.1 L (44.0%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest Bidder | |
| 3 | L3₹4.3 L+₹1.6 L (62.7%)Rejected-Finance 98 PANIYARE PURWA MAKRAND NAGAR SARAIMEERA KANNAUJ KANNAUJ UTTAR PRADESH 209726 | KANNAUJ | UTTAR PRADESH | 209726 | L3 | Rejected-Finance 3rd Lowest Bidder |
Tender Value
₹3.6 L
EMD Value
₹4,000
Closing Date
24 Jun 2024, 5:00 pmClosed
Superintending Engineer
Electricity Transmission Circle, UPPTCL, 132 KV S/s Mohaddipur Old , Gorakhpur
WORK OF CARRIAGE OF 01 No. 40 MVA , 132/33 KV TRANSFORMER AND ITS ACCESSORIES ON TRAILOR / TRUCK FROM 132 KV S/S KHURRAMNAGAR , ETD-II , LUCKNOW TO 132 KV SUBSTATION BHAGWANPUR , GORAKHPUR UNDER ETD-II , GORAKHPUR
2024_UPTCL_927023_1
E-Tender No. 11-ETC(G)/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC, Gorakhpur
₹4,000
5 Jul 2024
8 Jun 2024
25 Jun 2024
8 Jun 2024
24 Jun 2024
8 Jun 2024
Amount
Shifting / dragging of 40 MVA Transformer from existing place to near safe loading place at 132 KV Substation , Khurramnagar, Lucknow approx. distance 20 Mtrs.
Loading of 40 MVA T/F main tank along with accessories , making the wooden sleeper plateform , Jacking the T/F tank up to Trailor height placing the rail under T/F tank and shifted up on trailor , removed the rail under T/F tank and proper tightening the main tank with trailor bed with the help of steel rope and turn buckle at 132 KV S/s Khurramnagar, Lucknow.
Carriage of 40 MVA T/F tank from source of Substation 132 KV Khurramnagar , Lucknow to 132 KV Substation Bhagwanpur , Gorakhpur via NH-28 best road along with all accessories by private Truck / Trailor distance approx. 300 Km.
Unloading of main tank of 40 MVA Transformer loaded on Trailor jacking the tank for packing the rail under the T/F tank and shifting it of wooden to platform removing the rail under the T/F tank on wooden sleeper , lowering the tank towards ground by slowly and removing the wooden sleeper under the tank and unloading of various Transformer accessories of above 40 MVA T/F like oil filled drums, bushing , conservator tank , cooling fan etc. from Truck / Trailor at side of 132 KV S/s Bhagwanpur.
Shifting / dragging of oil filled 40 MVA Transformer from unloading place to plinth less than 20 Mtrs. Distance at 132 KV S/s Bhagwanpur including turning of Transformer if required including all T&P and other work to complete the job satisfactorily.
HARE KRISHNA ENERGY PROJECTS
rbs engineering
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .