Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 LAccepted-AOC | ₹2.8 L | L1 | Accepted-AOC Lowest bid |
| 2 | L2₹2.9 L+₹8,910.81 (3.21%)Rejected-Finance ANDHRA POWER HOUSE DIVISION HPSEBL CHIRGAON 171208 | SHIMLA | HIMACHAL PRADESH | 171208 | ₹2.9 L+₹8,910.81 (3.21%) | L2 | Rejected-Finance Higher bidder |
| 3 | L3₹2.9 L+₹15,175.95 (5.46%)Rejected-Finance | ₹2.9 L+₹15,175.95 (5.46%) | L3 | Rejected-Finance Higher bidder |
Tender Value
₹2.5 L
EMD Value
₹6,300
Closing Date
21 Jul 2025, 5:00 pmClosed
Sub Divisional Soil Cons. Officer, Shimla, 171005
O/o Sub Divisional Soil Cons. Officer, Shimla, Distt. Shimla (HP)
Remodeling of Old Defunct Structure of Tank irrigation scheme at PDS Kharapather Tehsil Jubbal Distt. Shimla H.P. Department of Agriculture Himachal Pradesh by the Sub Divisional Soil Conservation Officer Shimla Distt. Shimla H.P
2025_DoA_110081_1
Remodeling of Old Defunct Structure of Tank irrigation scheme at PDS Kharapather TehsilJubbal Shimla
Open Tender
Civil Works
Item Rate
45 days
As Per Tender Document
Please refer Tender documents.
4 documents required · 4 mandatory
₹300
Sub Diviisional Soil Conservation officer Shimla
₹6,300
Yes
4 Aug 2025
14 Jul 2025
22 Jul 2025
14 Jul 2025
21 Jul 2025
14 Jul 2025
Amount
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil.
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :-1:4:8 (1 Cement : 4 coarse sand) : 8 graded stone aggregate 40 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand) : 3 graded stone aggregate 20 mm nominal size)
Walls
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete. 40 mm thick with 20 mm nominal size stone aggregate
15 mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement: 4 fine sand)
Providing 50 mm dia Gate valve along with 6.00 mtr. Long G.I . pipe (medium class) for outlet.
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
ISA 40x40x5 @ 3.00 kg./ m
Fencing with angle iron post placed at required distance embedded in cement concrete blocks, every 15th post, last but one end post and corner post shall be strutted on both sides and end post on one side only and provided with horizontal lines and two diagonals interwoven with horizontal wires, of barbed wire weighing 9.38 kg per 100 m (minimum), between the two posts fitted and fixed with G.I. staples, turn buckles etc. complete. (Cost of posts, struts, earth work and concrete work to be paid for separately). Payment to be made per metre cost of total length of barbed wire used. With G.I. barbed wire
RAJESH KUMAR (BID ID -536451)
Yashpal (BID ID -536595)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .