Tender Value
₹1.9 Cr
EMD Value
₹4.5 L
Closing Date
30 Sept 2026, 5:00 pm3d left
General Manager
General Manager, UPSIDA Head Office Kanpur
P/L Interlocking tile on road patries from Gate no-A-529, Gate no-2 to Rotary, Infront O.H.T. and Service Lane at I..A. Surajpur Site-C, Housing Distt- G.B. Nagar.
2026_SIDC_1184279_1
CD_II_184_DT_27082026
Open Tender
Civil Works
Percentage
180 days
G.B. Nagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,586
UPSIDA
₹4.5 L
10 Sept 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
30 Sept 2026
10 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in Foundation in ordinary soil (Loam clay, or sand) including lift upto 1.5meter and lead upto 30m. including filling, watering and ramming of excavated earth into the trenches or into the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in-charge upto a distance of 30M. (100fts) from the foundation trenches. | 459.5 | Cum | 110 | ₹50,545 |
| 2 | Earth work in cutting or in embankment in ordinary soil excavation to be in the form of regular pits not exceeding 0.50 M.in depth and earth work in embankment to be in 20 cm. layers Including remming and dressing the surface to required levels and slopes and also including 1.50 M. lift and 30 M. lead. The earth from cutting to be used in making embankment or to be deposited as spoil banks with-in 30 M. distance as directed by the Engineer incharge. excluding Royallity. Wherever applicable for small work or Abadi area. (Where machine con not reach/move) | 3,043.15 | Cum | 100 | ₹3,04,315 |
| 3 | Supply & Stacking of 90-45 mm gauge approved stone ballast (15cm loose) for patches & Soling coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 1,455.3 | Cum | 2,724.65 | ₹39,65,183.15 |
| 4 | Supply & Stacking of 63-45 mm gauge approved stone ballast (10cm loose) for patches & Inter coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octol royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 34.2 | Cum | 2,775.25 | ₹94,913.55 |
| 5 | Supply & Stacking of 53-22.4 mm gauge approved stone ballast (10cm loose) for patches & top coat duly stacked on road side true to template including dressing surface where materials is to be staked including cost of materials its cartage octoi royalty, labour T&P etc. required for proper completion of the work as per direction of Engineer-in-Charge. | 34.2 | Cum | 2,835.75 | ₹96,982.65 |
| 6 | Consolidation of 90-45 mm gauge hard stone ballast for 15cm (loose) thick Soling coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge. | 1,455.3 | Cum | 180 | ₹2,61,954 |
| 7 | Consolidation of 63-45 mm gauge hard stone ballast for 10cm (loose) thick inter coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water also including labour for spraying screening material to be used for blinding purpose and also including cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor himself at his own cost as per direction of Engineer-in-charge. | 34.2 | Cum | 180 | ₹6,156 |
| 8 | Consolidation of 53-22.4mm gauge hard stone ballast for 10cm (loose) thick top coat by road roller including hire and fuel charges of road roller excluding cost of stone ballast but including opening out stacks, sorting ballast into different sizes spreading making medhi to retain water aiso including labour for spraying screening material to be used for blinding purpose and also ineluding cost of carriage of materials & water and T & P etc. required for proper completion of the work water for consolidation to be arranged by the contractor hinself at his own cost as per direction of Engineer-in-charge. | 34.2 | Cum | 180 | ₹6,156 |
| 9 | Providing and laying factory made chamfered edge Cement Concrete paver blocks (80mm thick M-40 grade) in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in- Charge. | 9,040 | Sqm | 939.23 | ₹84,90,639.2 |
| 10 | First Class Brick Work in 1:4 one Cement : 4 Coarse sand mortar in foundation & plinth including supply of all material, labour and T&P etc. required for proper completion of the work as per direction of Engineer-in-charge. | 516.68 | Cum | 5,170 | ₹26,71,235.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_2227835.xls
BOQ • 0.30 MB
feeformat.xls
Tender Documents • 0.02 MB
etenderdocuments.pdf
Tender Documents • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .