| 1 | L1₹10.3 LAccepted-AOC 13 1 3 PUDHUSAMPALLI RAMAN NAGAR METTUR DAM 636 403 | METTUR DAM | SALEM | TAMIL NADU | 636403 | L1 | Accepted-AOC L1 | |
| 2 | Not Admitted-Fee/PreQual/Technical 1 338 BX 1ST STREET UTHUKULI ROAD GOLDEN NAGAR CHENGAPPALLI TIRUPPUR 638 812 | TIRUPPUR | TIRUPPUR | TAMIL NADU | 638812 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | PA and CO L1 |
|---|---|---|---|---|
| 1.00 | Earthwork excavation in hard stiff clay black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete. | 7.5 | m³ | 200 ₹1,500 Lowest |
| 2.00 | Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete. | 7.5 | m³ | 300 ₹2,250 Lowest |
| 3.00 | Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting, as per standard specification, etc., complete.. | 15 | m³ | 600 ₹9,000 Lowest |
| 4.00 | Earth work excavation in Hard rock by weddging and chisseling and trimming to proper shape including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site. | 7.5 | m³ | 2,000 ₹15,000 Lowest |
| 5.00 | Conducting check survey,fixing of location and pit marking for tower foundation as per the approved profile cost of survey equipment tools & plants including cost of all T & Ps, transport, labour, lead lift etc complete as directed by engineer. | 1 | loc | 1,200 ₹1,200 Lowest |
| 6.00 | P.C.C.1:3:6, using 20 mm HB metal for tower foundation concrete with form work including cost of all materials, shuttering labour, curing , lead, lift, etc., complete. | 0.7 | m³ | 5,000 ₹3,500 Lowest |
| 7.00 | Labour charges for Setting of stub & cleats with correct level and Required alignment including transporting of stubs and cleats and templates, dismantling the template, transport from location to location and re-assembling the same including cost of transporting of all materials, labour, lead, lift, etc, complete. | 1 | loc | 30,000 ₹30,000 Lowest |
| 8.00 | PCC 1:2:4 using 20mm metal for foundation of tower concrete for Frustum& chimney with steel formwork including cost of cement and all materials, labour, curing , lead, lift, Vibration, charges etc., complete. | 28 | m³ | 9,000 ₹2,52,000 Lowest |
| 9.00 | supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete. | 1 | Loc | 1,000 ₹1,000 Lowest |
| 10.00 | Re filling with the excavated earth including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete. | 8.5 | M3 | 50 ₹425 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
11 Jul 2025, 2:00 pmClosed
SE GCC CBE
OFFICE OF THE SUPERINTENDING ENGINEER GENERAL CONSTRUCTION CIRCLE 182 Dr SUBBARAYAN STREET TATABAD COIMBATORE 641 012
Providing stub setting concreting erection of tower and stringing of Panther conductor for inserting KCR plus 3 tower in between loc 15 and 16 in the existing 110 KV Arasur to Annur feeder for making Vertical Clearance for the proposed Highways
2025_EB_573287_1
ETS No. 17/25-26 of SE GCC Cbe
Open Tender
Civil Works
Works
coimbatore
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
Yes
14 Oct 2025
24 Jun 2025
11 Jul 2025
24 Jun 2025
11 Jul 2025
24 Jun 2025
Amount
Earthwork excavation in hard stiff clay black cotton hard red earth shales murram gravel stoney earth and earth mixed with small size boulders and hard gravelly soil inlcuding all cost of lead lift etc complete.
Earth work excavating and depositing on bank with initial lead of 10m and initial llift of 2.0m in soft disintegrated rock, laterite, soft rock (or) kankar not requiring blasting, as per standard specification, etc., complete.
Earth work excavating and depositing on Bank with initial lead of 10m and initial lift of 2m in medium rock and dense medium rock not requiring blasting, as per standard specification, etc., complete..
Earth work excavation in Hard rock by weddging and chisseling and trimming to proper shape including all leads, lifts etc., as per standard specification and as per instruction of the Engineer at site.
Conducting check survey,fixing of location and pit marking for tower foundation as per the approved profile cost of survey equipment tools & plants including cost of all T & Ps, transport, labour, lead lift etc complete as directed by engineer.
P.C.C.1:3:6, using 20 mm HB metal for tower foundation concrete with form work including cost of all materials, shuttering labour, curing , lead, lift, etc., complete.
Labour charges for Setting of stub & cleats with correct level and Required alignment including transporting of stubs and cleats and templates, dismantling the template, transport from location to location and re-assembling the same including cost of transporting of all materials, labour, lead, lift, etc, complete.
PCC 1:2:4 using 20mm metal for foundation of tower concrete for Frustum& chimney with steel formwork including cost of cement and all materials, labour, curing , lead, lift, Vibration, charges etc., complete.
supply & Providing earthing as per approved specification and as directed by the site engineer including necessary excavation for fixing 3m long 25mm dia GI "B" class pipe and refilling with excavated earth and connect the earthstrip with the leg of the stub including all cost of materials, lead, lift etc complete.
Re filling with the excavated earth including watering and consolidation in layers each layer not exceeding 150mm thick and spreading the balance earth around the location labour charges ,lead, lift, etc complete.
Disposal of Excess of surplus earth away in low lying area with a lead of 10 Km including spreading and levelling labour, lead, lift as per standard specification, etc., complete.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of all materials,labour,lead,lift etc complete
Transport , erection of GI tower including sorting out of tower parts ,tightening punching of bolt & nuts transport charges to each location ,final checking cost of T &P,labour, lead, lift etc complete .
Providing welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level 1 cm each side at two places opposite to each other after tightening and punching of bolt & nuts including painting the welded portion of bolt and nuts two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost ofwelding rod ,hire charges of diesal generator and welding transformer, paint and all T & P including cost of all materials labour,lead, lift etc complete.
Transporting and hoisting of single disc 120 K N insulator (8 units) with single tension insulator strings including cost of hardware fittings,labour,lead,lift etc complete
Transporting and Hoisting of 9 units of 120 KN insulators for Double Tension fittings including cost of all T &Ps with all labour, lead, lift, etc completeas per std.spen
Transporting ,Labour charges for stringing of 6 Nos of ACSR Panther conductor including cost of loading & unloading transporting , sorting out of drums according to drum schedule providing trusseles ,paying out, jointing,rough sagging, tensioning, clipping, providing vibration dambers at tension locationsand all accessories including jumber connections, cost of T&P ,moving the drum to work spot all labour ,lead, lift, etc complete in all respects @ Under LC Condition
Supplying,Transporting and erection of the OPGW -48 fiber DWSM cable in the tower to the required clerance , clipping and jointing by the using necessary clamp tools and fixing of all hard wares etc including cost of all labour charges transport etc complete.
Providing well supported trussels 7.5 cm to 10 cm and above dia bamboo post with necessary bracing on either side road crossing upto 5m height for supporting to the power conductor and earth wire during paying out of conductor and tensioning operation including cost of all materials lead, lift etc., complete
Painting with anticorrosive black paint, two coats on the tower legs upto 1mtr height from chimney coping including all cost of materials,lead,lift,etc.,complete.
Providing temporary guys for rough sagging and single tensioning with necessary Excavation of pits fixing of rail etc., and dismantling stay after completion of work including major & minor T &Ps steel ropes with all labour, lead, lift, etc., completeas per std.spen.
Releasing and lowering of existing 6 Nos pantherconductor and devoluted to store , including all labour, lead, lifts T& P etc complete
Releasing and lowering of existing 1 No OPGW and devoluted to store , including all labour, lead, lifts T& P etc complete
Releasing and lowering of existing 7/8 insulater and devoluted to store , including all labour, lead, lifts T& P etc complete
Supplying,fabricating and fixing in the tower of name board of size 75cm x 40cm with 18 SWG MS sheet over a frame of same size with 25mm x 25mm x 5mm MS angle with 2 coat of primer paint and 2coat of approved quality enamel paint and lettering as specfied by the Engineer incharge including cost of all materials, labour, lead, lift,, transporting hire charges etc. complete.
Supplying and fixing of Number plate including cost of all materials ,labour,lead,lift etc complete
Supplying and fixing of danger board including cost of all materials ,labour,lead,lift etc complete
Supplying and fixing of Phase plate including cost of all materials ,labour,lead,lift etc complete
Conducting detailed survey,fixing of location with GPS for coordinates survey, preparation of route map and profile optimising tower spotting using soft ware including all labour cost of survey equipment tools & plants including cutting of small trees whereever necessary as directed by engineer and furnishing required number of soft and hard copies for approval including all crossing drawing etc .(profile role in duplicate and soft copy 2 nos.)
SGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone)Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .