Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC NO 23 JEEVANANDAM STREET PUDUCHERRY 605 001 | PUDUCHERRY | PUDUCHERRY | PUDUCHERRY | 605001 | L1 | Accepted-AOC Lowest | |
| 2 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹12.1 L
EMD Value
₹24,103
Closing Date
23 Sept 2022, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, SBDII, PWD, Puducherry.
O/o the EE, SBD-II, PWD, No.1, Rue Eveche, Puducherry.
Protection and strengthening of School boundary of Government Primary School, Thuthipet, Villianur Commune, Puducherry.
2022_PWDC2_10963_1
33/PW/SBD-II/2022-23
Open Tender
Civil Works
Item Rate
90 days
GPS, Thuthipet, VCP
Please refer tender documents
3 documents required · 3 mandatory
₹525
₹24,103
9 Nov 2022
12 Sept 2022
23 Sept 2022
12 Sept 2022
23 Sept 2022
12 Sept 2022
Amount
Earth work in excavation by mechanical means (Hydraulic excavation) / manual means over areas (exceeding 30 cm in depth, 1.5m in width as well as 10sqm on plan) including getting out and disposal of excavated earth, lead upto 50m and lift upto 1.5m - all kinds of soil.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - all work upto plinth level - 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40mm nominal size)
Centering and shuttering including strutting , propping etc and removal of form for - foundations, footings, bases of columns etc for mass concrete
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and cantilevers.
Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts.
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (TISCON / VIZAG / IISCO / SAIL / JSW) Fe - 415 or more
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete above plinth level - Thermo - Mechanically Treated bars (TISCON / VIZAG / IISCO / SAIL / JSW) Fe - 415 or more.
Providing and placing M30 grade cover block for RCC work all levels
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve workability without impairing strength and durability . Note:- Cement content considered in this item is @ 330 kg / cum. Excess or less cement used as per design mix is payable or recoverable separately. - All work upto plinth level
Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work , using cement content as per approved design mix , including pumping of concrete to site of laying but excluding the cost of centering , shuttering , finishing and reinforcement , including admixtures in recommended proportions as per IS : 9103 to accelerate, retard setting of concrete , improve workability without impairing strength and durability . Note:- Cement content considered in this item is @ 330 kg / cum. Excess or less cement used as per design mix is payable or recoverable separately. - All work above plinth level upto floor V level
Add for using extra cement in the items of design mix over and above the specified cement content therein
Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 3.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 coarse sand)
Brick work with common burnt clay F.P.S (non modular ) bricks of class designation 3.5 in superstructure above plinth level upto floor five level in all shapes and sizes in - cement mortar 1:6 ( 1 cement : 6 coarse sand)
Steel work welded in built up sections / framed work , including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required – in gratings, frames, guard bar, ladder, railings, brackets,gates and similar works.
12mm cement plaster of mix -1:4 ( 1 cement : 4 fine sand).
15mm cement plaster on the rough side of single or half brick wall of mix - 1:4 (1cement : 4 fine sand).
Finishing walls with acrylic smooth exterior paint of required shade - New work (two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg / 10 sqm.
Removing white or colour wash by scrapping and sand papering and preparing the surface smooth including necessary repairs to scrarches etc.complete
Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade - One or more coats on old work.
Demolishing R.C.C work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead.
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead - in cement mortar.
Supply of Quarry rubbish including stacking to department gauge for premeasurement and spreading required thickness.
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .