| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.7 L+₹47,606.21 (4.63%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | DIVYA ENGINEERING | VIGNESH TRADERS |
|---|---|---|---|---|---|
| 1.00 | Dismantling the existing damaged RCC for the required width & depth as per the instruction of Engineer in charge and disposing the debris 1 Km. away from the site including cost of all materials, labours, lead, lift, curing, etc. complete. | 9.29 | M3 | 48,930.43 ₹57,737.91 | 46,803.02 ₹55,227.56 Lowest |
| 2.00 | Strengthening the damaged steel columns supports using MS Plates cost of Materials, labour, fabrication charges, T & P, etc., complete. | 471 | Kg | 49,455 ₹58,356.9 | 47,100 ₹55,578 Lowest |
| 3.00 | Providing shuttering using steel structures including cost of all materials, labours, lead, lift, etc. complete. | 66 | M2 | 38,940 ₹45,949.2 | 37,290 ₹44,002.2 Lowest |
| 4.00 | Supplying fabricating and fixing in position of RTS rod for reinforcement including cutting bending tying and fixing in position including cost of all materials, labour, binding wire, lead, lift etc., complete. | 1,552 | Kg | 1,64,512 ₹1,94,124.16 | 1,56,752 ₹1,84,967.36 Lowest |
| 5.00 | Providing RCC 1:1.5:3 using OP cement with 12mm to 20mm machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete - excluding cost of reinforcement and form work. | 19.4 | M3 | 2,11,052.6 ₹2,49,042.07 | 2,01,876.4 ₹2,38,214.15 Lowest |
| 6.00 | Providing PCC 1:1.5:3 screed concrete for floor using OP cement with 12mm chips for 50mm thickness machine crushed HBG metal including cost of all materials, labours, lead, lift, curing, etc. complete | 662.7 | M2 | 2,94,238.8 ₹3,47,201.78 | 2,80,984.8 ₹3,31,562.06 Lowest |
| 7.00 | Supplying and Providing Nito floor hard top over the existing PCC concrete surface of 5 Kg/sqm and rubber smooth with power float over the base concrete including cost of all materials, labour, lead, lift etc., complete. | 662.7 | M2 | 2,51,826 ₹2,97,154.68 | 2,41,222.8 ₹2,84,642.9 Lowest |
| 8.00 | Providing two coats of anticorrosive black paint to the newly plastered surface over a one coat of white cement primer including cost of all materials, labour, lead, lift, etc., complete. | 63 | M2 | 13,419 ₹15,834.42 | 12,852 ₹15,165.36 Lowest |
| 9.00 | Painting two coats with ready mixed enamel paint for the old steel surface including cost of all materials, labours, lead, lift, etc. complete. | 16.2 | M2 | 2,608.2 ₹3,077.68 | 2,494.8 ₹2,943.86 Lowest |
Tender Value
Refer Docs
EMD Value
₹8,200
Closing Date
31 Jul 2025, 2:00 pmClosed
CE TTPS TTN 4
O/o SE Civil TTPS TTN 4
Rectification works to the damaged pedestals and Providing encasing concrete to the Structural Steel Columns along Pipe Rack PR 3 along West side of Unit 5 Bottom Ash Hopper up to Mill Operator Room
2025_EB_582343_1
CE SE C TTPS Spec No.185 25 26
Open Tender
Civil Works - Others
Item Rate
90 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,200
Yes
18 Nov 2025
16 Jul 2025
1 Aug 2025
16 Jul 2025
31 Jul 2025
16 Jul 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .