| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.4 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹11.4 L−₹1,302.52 (0.11%)Rejected-Finance | L2 | Rejected-Finance Highest price |
| Sl No | Description | Qty | Unit | A K CONSTRUCTIONS L1 | K.RAJENDRAN L2 |
|---|---|---|---|---|---|
| 1.00 | Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 1,280 | M2 | 26 ₹33,280 Lowest | 30 ₹38,400 |
| 2.00 | Providing and laying 50 mm compacted thick Dense Bituminuous Macadam using 0.24cum of 26.50-13.20 mm IRC size HBG metal 0.25 cum of 13.20-2.36 mm IRC size HBG metal.0.23 cum of 2.36 mm and below .01 cum of quarry fine with 53.20 kgs of bitumen for premixing per sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant20-30 tons capacity,conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grade and cross sections and compaction by vibratory/ roller to the required density etc., including labour for loading for loading bitumen into bitumen tank and metal feeder unit,labour for attending to paver site etc including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks paver finisher,power rollers and all other tools and plant required including all other incidental charges etc., complete as per specification using CMP clause MORTH OF 511 & 501 | 64 | M3 | 10,390 ₹6,64,960 Lowest | 10,400 ₹6,65,600 |
| 3.00 | Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5 | 39 | M3 | 11,341 ₹4,42,299 Lowest | 11,350 ₹4,42,650 |
Tender Value
₹14 L
EMD Value
₹14,000
Closing Date
20 May 2025, 3:00 pmClosed
Executive officer
Perur Town Panchayat office Coimbatore District
Strengthening of BT road at ward no. 3 Vadakailayar street in Perur Town Panchayat
2025_DTP_557501_1
62/2025
Open Tender
Civil Works
Works
180 days
Perur Town Panchayat Coimbatore District
As per norms
2 documents required · 2 mandatory
₹0
₹14,000
11 Sept 2025
13 May 2025
20 May 2025
13 May 2025
20 May 2025
13 May 2025
13 May 2025 - 20 May 2025
Amount
Providing and laying Tack Coat over existing B.T Surface using 2.00 Kg of Bitumen Emulsion (RS1) per 10 sqm for prparatory to another bituminous construction over it, including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying 50 mm compacted thick Dense Bituminuous Macadam using 0.24cum of 26.50-13.20 mm IRC size HBG metal 0.25 cum of 13.20-2.36 mm IRC size HBG metal.0.23 cum of 2.36 mm and below .01 cum of quarry fine with 53.20 kgs of bitumen for premixing per sqm including cost and conveyance of all materials to CMP site,heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant20-30 tons capacity,conveying the mix by tipper trucks to paver site,spreading the mix in required temperature for uniform thickness of 50 mm with mechanical paver to the specified grade and cross sections and compaction by vibratory/ roller to the required density etc., including labour for loading for loading bitumen into bitumen tank and metal feeder unit,labour for attending to paver site etc including hire charges and fuel charges for 20-30 CMP with bitumen tipper trucks paver finisher,power rollers and all other tools and plant required including all other incidental charges etc., complete as per specification using CMP clause MORTH OF 511 & 501
Providing and laying Bituminous Concrete 40mm Consolidated thick using 0.13 cum of 19.00 – 9.50mm,0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 mm & below with 45.27kgs of 60/70 Grade Bulk bitumen and 5.03 kg of shredded Plastic waste for premixing per 10 Sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20 – 30 ton capacity, Conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40 mm with mechanical pavers to the specified grades and cross sections and compaction by Vibratory/Pneumatic rollers to the required density etc., including labour for loading bitumen into bitumen tank and Metal to feeder unit, labour for attending to paver site etc., including hire charges and fuel charges for 20 – 30 ton CMP With bitumen boiler tipper,trucks, paver Finisher/9M, Vibrator rollers and all other tools and plants required,including all other incidental charges etc., complete as per standard specification using CMP Clause 507 of MORTH Rev-5
K.RAJENDRAN (BID ID -1344684)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .