Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹34 L
EMD Value
₹34,000
Closing Date
16 Aug 2022, 3:00 pmClosed
BDO(B.P)
Panchayat Union Office,Sathankulam
Construction of 2 nos of 60000litre OHT at Sathankulam Panchayat Union of Thoothukudi District under MLACDS 2021-22
2022_RDTN_245665_1
A2/505/2022/MLACDS
Open Tender
Civil Works - Buildings
Item Rate
60 days
Sathankulam Block
As Per Tender schedule
4 documents required · 4 mandatory
₹0
₹34,000
Sathankulam Panchayat Union Office
28 Apr 2023
8 Aug 2022
16 Aug 2022
8 Aug 2022
16 Aug 2022
10 Aug 2022
10 Aug 2022
Amount
Construction of 60000 lit Capacity OHT at Pudhukinaru Village in Pannamparai Panchayat in Sathankulam Panchayat Union of Thoothukudi District under MLACDS - 2021-22
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.. First Depth of 2m for Column Foundation
Second depth of 2m for column foundation
Sand filling for foundation with river sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge-for Column Foundation
Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level.-for Column Foundation
Reinforced cement concrete M30 grade using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure)-From G.L upto 4.50m depth
(i) below 1.50m to 4.50m depth from G.L for Footing
Below G.L upto 1.50m depth for column & G.L brace
Above G.L upto 4.50m height for column & brace
Above 4.50m to 7.32m ht., from G.L for column & brace
Above 7.32m to 10.98m ht., from G.L for column & brace
Above 10.98m to 14.64m ht., from G.L for column
Above 10.98m to 14.64m ht., from G.L for Floorbeam , Floor slab , Side wall & Haunch
Above 14.64m ht., to 18.30m ht., for roof slab & side wall
Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood) joints of 10cm x 6.5cm spaced at about 90cm c/c and supported by Casurina props of 10cm to 13cm dia. at 75cm c/c complying with standard specification and as directed.
Upto 3.30m ht., from G.L for Column footing, G.L brace peripheral & I set of Brace above GL
From 3.30m to 4.30m ht., for brace & roof slab bottom
From 5.30m to 6.30m ht., for brace
From 6.30m to 7.30m ht., for brace
From 8.30m ht., to 9.30m ht., for brace
From 9.30m ht., to 10.30m ht., for brace
From 11.30m to 12.30m ht. for floor beam & floor slab bottom (including 1.5m working space)
Centering for square column
upto 3.30m ht.
From 3.30m to 4.30m ht.,
From 4.30m to 5.30m ht.,
From 5.30m to 6.30m ht.,
From 6.30m to 7.30m ht.,
From 7.30m to 8.30m ht.,
From 8.30m ht to 9.30m ht
From 9.30m ht to 10.30m ht
From 10.30m ht to 11.30m ht
From 11.30m ht to 12.30m ht
Centering for curved surface
From 0 to 3.30m ht from floor level for side wall
From 3.3 to 4.30m ht from floor level for side wall & roof slab sides
From 11.30m to 12.30m ht for sides of floor slab
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer. The rate to include the cost of binding wire also.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing in position of 0.60 x 0.60m water tight CI manhole frame and cove of approved pattern at the roof slab and as directed. The manhole frame and cover should be of light duty and confirming to IS: 1726-1974 (33kg)
Provision for pipe connection arrangements for lnlet, outlrt, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below.65mm Φ GI pipes
65MM dia GI Tee
65MM dia GI 90 Bend
65MM dia GI Coupler
65MM dia GI Union
65MM dia GI Elbow
65MMx50MM dia GI Reducer
50MM dia GM Gate Valve
65MM dia GM Gate Valve
Earth work excavation and depositin on bank with an initial lead of 10m and initial lift of 2 m in hardsitticlay. Stiff black cotton soil, hard red earth, shales,murams, gravel for pipe trenches.
Cost and supply of 63mm 4KSC PVC Pipe
Conveying laying and jointing of 63 mm 4 KSC PVC pipes with specials including all charges etc
Refilling the pipe line trenches with excavated earth including all labour charges
Provision for MS Ladder and Hand rails for 60000 litres - 12m Staging Height Service Reservoirs
Construction of 60000 lit Capacity OHT at Pudhukinaru Village in Pannamparai Panchayat in Sathankulam Panchayat Union of Thoothukudi District under MLACDS - 2021-22
Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.. First Depth of 2m for Column Foundation
Second depth of 2m for column foundation
Sand filling for foundation with river sand including consolidation ramming etc. complete as per standard specifications and as directed by the Engineer-incharge-for Column Foundation
Plain Cement concrete 1:4:8 (one cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course for foundation including the cost of mixing, placing the concrete in position, consolidating finishing and curing etc., complete and as directed for works beyond 1.50m and upto 4.50m depth below ground level.-for Column Foundation
Reinforced cement concrete M30 grade using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure)-From G.L upto 4.50m depth
(i) below 1.50m to 4.50m depth from G.L for Footing
Below G.L upto 1.50m depth for column & G.L brace
Above G.L upto 4.50m height for column & brace
Above 4.50m to 7.32m ht., from G.L for column & brace
Above 7.32m to 10.98m ht., from G.L for column & brace
Above 10.98m to 14.64m ht., from G.L for column
Above 10.98m to 14.64m ht., from G.L for Floorbeam , Floor slab , Side wall & Haunch
Above 14.64m ht., to 18.30m ht., for roof slab & side wall
Centering for soffits of reinforced cement concrete slabs or plain surface including strutting upto 3m ht., using MS sheet of size 90cm x 60cm and BG. 10 gauge stiffened with welded MS angles of size 25mm x 2mm x 3mm laid over silver oak (country wood) joints of 10cm x 6.5cm spaced at about 90cm c/c and supported by Casurina props of 10cm to 13cm dia. at 75cm c/c complying with standard specification and as directed.
Upto 3.30m ht., from G.L for Column footing, G.L brace peripheral & I set of Brace above GL
From 3.30m to 4.30m ht., for brace & roof slab bottom
From 5.30m to 6.30m ht., for brace
From 6.30m to 7.30m ht., for brace
From 8.30m ht., to 9.30m ht., for brace
From 9.30m ht., to 10.30m ht., for brace
From 11.30m to 12.30m ht. for floor beam & floor slab bottom (including 1.5m working space)
Centering for square column
upto 3.30m ht.
From 3.30m to 4.30m ht.,
From 4.30m to 5.30m ht.,
From 5.30m to 6.30m ht.,
From 6.30m to 7.30m ht.,
From 7.30m to 8.30m ht.,
From 8.30m ht to 9.30m ht
From 9.30m ht to 10.30m ht
From 10.30m ht to 11.30m ht
From 11.30m ht to 12.30m ht
Centering for curved surface
From 0 to 3.30m ht from floor level for side wall
From 3.3 to 4.30m ht from floor level for side wall & roof slab sides
From 11.30m to 12.30m ht for sides of floor slab
Supplying, fabricating and placing in position of RTS grills for reinforcement for various members including cost of steel for all RCC works etc., complete as per standard specifications and as directed by Engineer. The rate to include the cost of binding wire also.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing in position of 0.60 x 0.60m water tight CI manhole frame and cove of approved pattern at the roof slab and as directed. The manhole frame and cover should be of light duty and confirming to IS: 1726-1974 (33kg)
Provision for pipe connection arrangements for lnlet, outlrt, scour and overflow etc., including cost of pipes, specials, valve, labour charge for lifting, aligning, cutting, threading, fixing and painting of GI pipes with two coats of approved quality enamel paint etc., complete as detailed below.65mm Φ GI pipes
65MM dia GI Tee
65MM dia GI 90 Bend
65MM dia GI Coupler
65MM dia GI Union
65MM dia GI Elbow
65MMx50MM dia GI Reducer
50MM dia GM Gate Valve
65MM dia GM Gate Valve
Earth work excavation and depositin on bank with an initial lead of 10m and initial lift of 2 m in hardsitticlay. Stiff black cotton soil, hard red earth, shales,murams, gravel for pipe trenches.
Cost and supply of 63mm 4KSC PVC Pipe
Conveying laying and jointing of 63 mm 4 KSC PVC pipes with specials including all charges etc
Refilling the pipe line trenches with excavated earth including all labour charges
Provision for MS Ladder and Hand rails for 60000 litres - 12m Staging Height Service Reservoirs
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Alexander
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .