Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹78,788.38Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹87,500
EMD Value
₹1,750
Closing Date
21 Sept 2026, 6:00 pmClosed
XEW REW UDHAMPUR
XEW REW UDHAMPUR
BOQ
2026_RDPR_324563_5
3RD TIME e-NIT No. 181 REW UDHAMPUR of 2026-27 Dated 14-09-2026
Open Tender
Civil Works
Percentage
60 days
Udhampur
NIT
2 documents required · 2 mandatory
₹600
XEW REW UDHAMPUR
₹1,750
25 Sept 2026
14 Sept 2026
22 Sept 2026
14 Sept 2026
21 Sept 2026
14 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as10 sqm on plan including disposal of excavated earth, leadupto50meterand lift upto 1.5m, as directed by Engineer-in-Charge. All kinds of soil (IN- Stretches). | 51.39 | sqm | 91.75 | ₹4,715.03 |
| 2 | Earth Work in Excavation by manual labour in foundation trenches including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil. 1m from cutting edge.100% in All kinds of soil. (in-stretches). | 4.3 | cum | 479.3 | ₹2,060.99 |
| 3 | Providing and lying in position 1:5:10 graded crushed stone aggregates 40mm size.excluding the cost of centring and shuttering all work upto plinth Level (in-stretches) | 1.68 | cum | 4,826.5 | ₹8,108.52 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 8.75 | cum | 4,774.28 | ₹41,774.95 |
| 5 | Dry stone pitching (any thickness) including cost of stones On Horizontal. | 6.71 | cum | 1,242.52 | ₹8,337.31 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of forms for: Foundations, footings, bases of columns etc. for mass concrete. | 40 | sqm | 286.35 | ₹11,454 |
| 7 | Carriage of sand and agg. | 11.93 | cum | 520.34 | ₹6,207.66 |
| 8 | Carriage of stone | 7.14 | cum | 405.31 | ₹2,893.91 |
| 9 | Add CIB in all respects | 1 | No | 2,000 | ₹2,000 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
BOQ_1094993.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .