Loading…
Loading…
Tender Value
₹48.6 L
EMD Value
₹97,200
Closing Date
21 Sept 2026, 4:00 pm6d left
Executive Engineer PWD (RnB) Division Doda
Executive Engineer PWD (RnB) Division Doda
As per NIT/SBD
2026_PWDJK_323632_2
e-NIT 35 of 2026-27
Open Tender
Civil Works
Percentage
90 days
Doda
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Yes
Treasury Challan under MH 0059
₹97,200
Yes
7 Sept 2026
7 Sept 2026
22 Sept 2026
7 Sept 2026
21 Sept 2026
7 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for
foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides
and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and
disposal of surplus excavated earth as directed, within a lead of 50 metres:
All kinds of soil : | 640 | cum | 256.85 | ₹1,64,384 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 48 | cum | 5,202.9 | ₹2,49,739.2 |
| 3 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth leve 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 384 | cum | 7,788.4 | ₹29,90,745.6 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 1,800 | kg | 123.2 | ₹2,21,760 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 1,000 | sqm | 286.35 | ₹2,86,350 |
| 6 | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded . | 2,400 | cum | 138.2 | ₹3,31,680 |
| 7 | Providing and laying of PVC piping system AQUAFIT leadfree non Toxic u PVC pipe of 400mm (16 inch) dia class I having weight 4k /mtr sqm including all leads lift carriage jointing and testing complete. | 120 | mtr | 3,600 | ₹4,32,000 |
| 8CARRIAGE OF Materials by way of Mechanical Transport including loading ,unloading and stacking all complete job. | |||||
| 8.1 | Carriage ofSand at an avg. lead of 22.00km by MT | 186.91 | cum | 432.02 | ₹80,748.86 |
| 8.2 | Carriage of Bajree at an avg. lead of 10.00 km by MT | 367.49 | cum | 279.04 | ₹1,02,544.41 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_1089989.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .