Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹17.7 LAccepted-AOC AT KENDUA PO LALMATIA DIST GODDA JHARKHAND 814165 | LALMATIA | GODDA | JHARKHAND | 814165 | ₹17.7 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹19.1 L+₹1.3 L (7.59%)Rejected-Finance | ₹19.1 L+₹1.3 L (7.59%) | L-2 | Rejected-Finance L-2 |
| 3 | Rejected-Technical KENDWA KENDWA LALMATIA LALMATIA GODDA JHARKHAND 814165 | GODDA | JHARKHAND | 814165 | - | - | Rejected-Technical Not responded in confirmatory cycle |
Tender Value
₹17.7 L
EMD Value
₹22,200
Closing Date
25 May 2026, 6:55 pmClosed
AE(C), RJML AREA
AREA OFFICE RAJMAHAL AREA, DHANKUNDA
Extension of drain north side of inpit weigh bridge along haul road under ROCP.
2026_ECL_359614_1
ECL/RJML/AGM/AE(C)/ e-Ten/26-27/18 Dt-14.05.2026
Open Tender
Civil Works - Others
Percentage
30 days
Rajmahal OCP
Please refer Tender documents.
4 documents required · 4 mandatory
₹22,200
31 Aug 2026
14 May 2026
26 May 2026
14 May 2026
25 May 2026
14 May 2026
14 May 2026 - 18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Item Description/ Heading | - | - | - | - |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m: All kinds of soil. | 333 | cum | 128.35 | ₹42,740.55 |
| 3 | Supplying and filling in plinth with river sand under floors, including watering, ramming, consolidating and dressing complete. | 18 | cum | 1,061.6 | ₹19,108.8 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 18 | cum | 4,932.6 | ₹88,786.8 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 72 | cum | 6,903.9 | ₹4,97,080.8 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 600 | sqm | 562.9 | ₹3,37,740 |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,400 | kg | 95.75 | ₹5,17,050 |
| 8 | Total impact of GST for the purpose of CTC | - | Nos | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.09 MB
Tendernotice_2.pdf
PDF • 1.49 MB
BOQ_372476.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .