Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-Finance SABITGANJ SABITGANJ SABITGANJ SABITGANJ ETAWAH UTTAR PRADESH 206001 | ETAWAH | UTTAR PRADESH | 206001 | L-1 | Accepted-Finance ACCEPT | |
| 2 | L-2₹2.0 L+₹4,925.27 (2.46%)Accepted-Finance 0 VILLAGE CHAMPANER NAGLA BALLAM POST SANTOSHPUR GHAT ETAWAH UTTAR PRADESH 206253 | ETAWAH | UTTAR PRADESH | 206253 | L-2 | Accepted-Finance ACCEPT | |
| 3 | L-3₹2.1 L+₹6,993.29 (3.50%)Accepted-Finance | L-3 | Accepted-Finance ACCEPT |
| Sl No | Description | Qty | Unit | INDIAN ELECTRICALS L1 | M/s Radha Krishan L2 | M/S Pradeep Kumar Dohare L3 |
|---|---|---|---|---|---|---|
| 1.00 | Carriage of PCC Pole 8.5 Mtr. Long from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | 29 | Nos. | 1,003 ₹29,087 Lowest | 1,027.72 ₹29,803.99 | 1,038.11 ₹30,105.05 |
| 2.00 | Safe carriage of Line material Conductor G.I. wire TPMO, stay rod, disc insulator, cross arm, Angle channel and other required. from store center Etawah to site of work. Including loading & unloading at both ends. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. | 10 | Qtl | 413 ₹4,130 Lowest | 423.18 ₹4,231.8 | 427.45 ₹4,274.55 |
| 3.00 | Erection and grouting of Single pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. | 19 | Nos. | 2,065 ₹39,235 Lowest | 2,115.9 ₹40,202.14 | 2,137.28 ₹40,608.22 |
| 4.00 | Erection and grouting of Double pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms. | 2 | Nos. | 4,130 ₹8,260 Lowest | 4,231.8 ₹8,463.61 | 4,274.55 ₹8,549.1 |
| 5.00 | Mounting of 16 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. | 2 | Nos. | 1,593 ₹3,186 Lowest | 1,632.27 ₹3,264.53 | 1,648.76 ₹3,297.51 |
| 6.00 | Mounting of 25 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. | 1 | Nos. | 2,065 ₹2,065 Lowest | 2,115.9 ₹2,115.9 | 2,137.28 ₹2,137.28 |
| 7.00 | Mounting of 63 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof. | 1 | Nos. | 3,127 ₹3,127 Lowest | 3,204.08 ₹3,204.08 | 3,236.45 ₹3,236.45 |
| 8.00 | Installation of stay set with grouting and Nuzzling etc. as per Resspo drawing /norms along with all routine material to be used for such works. | 10 | Nos. | 938.1 ₹9,381 Lowest | 961.22 ₹9,612.24 | 970.93 ₹9,709.34 |
| 9.00 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. | 14 | Nos. | 247.8 ₹3,469.2 Lowest | 253.91 ₹3,554.72 | 256.47 ₹3,590.62 |
| 10.00 | Laying, sagging and stringing and jumpering / binding etc. of ACSR Weasel conductor in 11 KV/ LT lines as per Resspo manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work | 995 | Mtr | 5.9 ₹5,870.5 Lowest | 6.05 ₹6,015.21 | 6.11 ₹6,075.97 |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
16 Feb 2025, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EDC ETAWAH
STATION ROAD ETAWAH
DEPOSIT WORKS
2025_DVVNL_1003744_2
82/EDCE/2024-25
Open Tender
Repair and Maintenance Works
Item Wise
180 days
EDD II ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
DVVNL.ORG
₹2,000
8 Sept 2025
11 Feb 2025
17 Feb 2025
11 Feb 2025
16 Feb 2025
11 Feb 2025
Carriage of PCC Pole 8.5 Mtr. Long from Store Center Kunera Etawah to site of work through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Safe carriage of Line material Conductor G.I. wire TPMO, stay rod, disc insulator, cross arm, Angle channel and other required. from store center Etawah to site of work. Including loading & unloading at both ends. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
Erection and grouting of Single pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms.
Erection and grouting of Double pole structure. It also includes its grouting with cement, sand and brick for support, along with all relevant accessories, clamps and complete fixing of HT/LT fittings as per RESPO norms.
Mounting of 16 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Mounting of 25 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Mounting of 63 Kva Transformer on the Single Pole/Double pole/Plinth structures and connections thereof.
Installation of stay set with grouting and Nuzzling etc. as per Resspo drawing /norms along with all routine material to be used for such works.
Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work.
Laying, sagging and stringing and jumpering / binding etc. of ACSR Weasel conductor in 11 KV/ LT lines as per Resspo manual and as per direction of Executive engineer including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Laying of Arial Bunch Conductor including it's sagging, stringing, jumpering and binding as per Resspo manual or as per direction of Executive engineer. including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work
Digging, laying and back filling of 3X185 Sqmm XLPE cable including the cost of Cable hoisting and making loops/ HDPE pipe/clamps as per RESPO manual and as per direction of supervising engineer including the cost of arrangement of brick, sand, labour and T&P etc. required for proper completion of the work.
Replacement of 11 KV Heat Shrinkable Kit with Supply.
Installation & Fixing of following accessories.
Dropper Channel
Top Channel
11 Kv Composite Polymer Pin Insulator
11 Kv Polymer Disc Insulator
Nut Bolt with Washer Off Size
11 Kv Cross Arm
11 Kv X-Arm Clamp
Holding Clamp
MS T-Off Channel
11 Kv DP Clamp for PCC 8.5 Mtr. Long
M/s Radha Krishan (BID ID -4951297)
M/S Pradeep Kumar Dohare (BID ID -4950958)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .