| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹68.6 CrAdmitted-Finance 7TH FLOOR KALPATARU SYNERGY OPP GRAND HYATT SANTACRUZ EAST MUMBAI 400055 MAHARASHTRA INDIA | MUMBAI | MUMBAI | MAHARASHTRA | 400055 | ₹68.6 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Kalpataru Power Transmission Limited L1 |
|---|---|---|---|---|
| 1.00Construction Phase: | ||||
| 1.01 | Design, Construction, supply, installation, testing and commissioning (Civil, Mechanical, Electrical, Piping ,Instrumentation and automation Works etc.) for up-gradation of existing 30.0 MLD STP at Gajadharpura from ASP to SBR process followed by DAF Clarifier and filtration system including construction of additional grit separators, construction of SBR Basin , Replacement of chlorination system, Replacement of gas holder, construction of Bio Gas Power generation system, construction of DAF Clarifier and Installation of filtration system, Construction of OHSR, Repairing/replacement of existing STP civil, mechanical, electrical, Piping , Instrumentation and automation components, etc. to upgrade and operate the plant up to desired parameters as per NGT/CPCB/RSPCB Norms during 10 years O&M as per scope of work mentioned in Tender Document. | 1 | Lumpsum | 53,53,00,000 ₹53.5 Cr |
| 2.00O &M Phase: | ||||
| 2.01 | Operation and Maintenance of the entire Sewerage Treatment facilities (Excluding Electricity & Diesel) at the site for 10 years after satisfactory commissioning and trial run of entire system (STP) including plant acceptance. | 1 | Lumpsum | 15,08,00,000 ₹15.1 Cr |
Tender Value
₹59.2 Cr
EMD Value
₹1.2 Cr
Closing Date
15 May 2023, 6:00 pmClosed
Executive Engineer (PHE-II)
307, CCC Building, Third Floor, JDA, Jaipur
Upgradation of existing 30 MLD STP Gajadharpura from ASP to SBR Technology as per latest NGT norms including design, construction, supply, installation, testing and commissioning (Civil, Mechanical, electrical, instrumentation, SCADA and other
2023_JDAJP_328062_1
EE PHE-II_12_2022-2023
Open Tender
Civil Works
456 days
30 MLD STP Gajadharpura
Please refer tender documents
3 documents required · 3 mandatory
₹5,000
Secretary, JDA (Only Online JDA Portal)
₹1.2 Cr
Yes
Manthan Hall, Main Building, JDA, Jaipur
4 Jul 2023
6 Apr 2023
19 May 2023
6 Apr 2023
15 May 2023
6 Apr 2023
19 Apr 2023
Amount
Construction Phase:
Design, Construction, supply, installation, testing and commissioning (Civil, Mechanical, Electrical, Piping ,Instrumentation and automation Works etc.) for up-gradation of existing 30.0 MLD STP at Gajadharpura from ASP to SBR process followed by DAF Clarifier and filtration system including construction of additional grit separators, construction of SBR Basin , Replacement of chlorination system, Replacement of gas holder, construction of Bio Gas Power generation system, construction of DAF Clarifier and Installation of filtration system, Construction of OHSR, Repairing/replacement of existing STP civil, mechanical, electrical, Piping , Instrumentation and automation components, etc. to upgrade and operate the plant up to desired parameters as per NGT/CPCB/RSPCB Norms during 10 years O&M as per scope of work mentioned in Tender Document.
O &M Phase:
Operation and Maintenance of the entire Sewerage Treatment facilities (Excluding Electricity & Diesel) at the site for 10 years after satisfactory commissioning and trial run of entire system (STP) including plant acceptance.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.43 MB
BOQ_582624.xls
BOQ • 0.22 MB
td12.pdf
Tender Documents • 35.88 MB
Download all tender documents and submit your bid