Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.1 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹16.1 L+₹99,573.39 (6.61%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹16.1 L+₹1.0 L (6.87%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
12 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE OFFICER
JHARSUGUDA MUNICIPALITY
SHED AND ROAD
2026_ORULB_144273_10
EO/JMC/09/2026-27
Open Tender
Civil Works - Others
Percentage
60 days
ROHIDASPADASARASMAL
Scan copy of regd. cert, PAN, GST clearance cert., experience cert., and other documents as per DTCN
2 documents required · 2 mandatory
₹6,000
₹20,000
Yes
16 Nov 2026
27 Oct 2026
13 Nov 2026
27 Oct 2026
12 Nov 2026
27 Oct 2026
90 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth Work excavation in hard soil including moorum stony earth and earth mixed with boulder within 50 m initial lead and 1.5 m initial lift including dressing and breaking clods levelling the bed up to required depth and depositing the excavated materials with all leads and lifts T and P etc. complete as per direction of Engineer-in-charge. | 38.86 | cum | 286.5 | ₹11,133.39 |
| 2 | Supplying and filling in foundation and plinth with sand well watered and rammed with cost, conveyance, royalty taxes of all materials etc. complete as per direction of engineer-in-charge. | 29.36 | cum | 601.2 | ₹17,651.23 |
| 3 | Cement Concrete (1:4:8) using with 4 cm size CBHG metal of approved quality from approved quarry including lowering laying concrete water curing to required level not exceeding 150 mm thick including cost, conveyance, royalty taxes of all materials etc. complete as per direction of Engineer-in-charge. | 11.14 | cum | 5,759.8 | ₹64,164.17 |
| 4 | Cement Concrete (1:2:4) using 12 mm size hard crusher broken chips of approved quality from approved quarry including hoisting and laying compacting watering curing including cost, conveyance, royalties taxes of all materials etc. completed as per direction of Engineer-in-charge. | 5.25 | cum | 7,719.6 | ₹40,527.9 |
| 5 | Brick work with Flyash bricks 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ±8 percent in cement mortar (1:6) in foundation and plinth. | 12.35 | cum | 5,646.6 | ₹69,735.51 |
| 6 | RCC work of M 20 grade with 20 mm and down grade black hard granaite ( Crusher Brocken ) stone chips including hosting and laying | 16.25 | cum | 6,139.2 | ₹99,762 |
| 7 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas | 72.67 | cum | 773.5 | ₹56,210.25 |
| 8 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor for R.C.C. foundation , plinth band and footings bases of columns mass concrete pre-cast slabs etc | 12.27 | cum | 250.7 | ₹3,076.09 |
| 9 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor for R.C.C.beams, column, grider and bressmer, etc. (See Page no-54,Item no 10 (v)of AoR-06) | 30.51 | cum | 1,228.8 | ₹37,490.69 |
| 10 | Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor for R.C.C. Lintels (See Page no-54,Item no 10 (vi)of AoR-06) | 22.53 | cum | 583.1 | ₹13,137.24 |
stage.html
html • 0.02 MB
finance_615553.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.13 MB
NIT.pdf
Tender Documents • 3.11 MB
BOQ_615553.xls
BOQ • 0.31 MB
CORRIGENDUM.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .