| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹36.2 LAccepted-AOC | ₹36.2 L Quoted ₹56.5 L | 1 | Accepted-AOC L1 |
| 2 | 2₹57.4 LRejected-AOC | ₹57.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | STEBY ENTERPRISES L1 | BINDHU ENTERPRISES L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for identification, rectification of tube puncture up to 10 Joints including Arc filling by spool piece, edge preparation and assisting for hydraulic test including IBR welding charges. | 34 | Activity | 34,18,428 ₹40.3 L | 34,34,000 ₹40.5 L |
| 2.00 | Charges for additional joint of tube size between 44.5 to 76.1mm OD exceeding 10 joints. | 160 | No. | 10,00,960 ₹11.8 L | 10,40,960 ₹12.3 L |
| 3.00 | Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work. | 34 | No. | 6,26,994 ₹7.4 L | 6,46,000 ₹7.6 L |
| 4.00 | Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for boiler tube replacement work and removal of sky climber, return back to stores after completion of works. | 7 | No. | 1,50,780 ₹1.8 L | 1,53,300 ₹1.8 L |
| 5.00 | Charges for Shifting the position of sky climber inside the furnace for Boiler tube replacement and erosion fill up work inside the furnace. | 5 | No. | 34,830 ₹41,099.40 | 35,250 ₹41,595 |
| 6.00 | Charges for water washing of boiler inter-pass area (area inclusive of re-heater coils, water wall Screen tubes, S.H Screen tubes etc.) | 15 | No. | 2,32,395 ₹2.7 L | 2,35,500 ₹2.8 L |
| 7.00 | Charges for IBR welder for Arc filling of area 150 x 25 mm2 area for 3 layers | 16 | No | 32,544 ₹38,401.92 | 35,200 ₹41,536 |
| 8.00 | Charges for fin welding by cleaning, surface preparation and welding. | 60 | Mtr. | 62,340 ₹73,561.20 | 66,000 ₹77,880 |
| 9.00 | Removal & relaying of Insulation and Re fixing Skin casing inclusive of necessary Scaffolding arrangements for replacement of failed tubes & bends in pressure parts. | 30 | M2 | 48,600 ₹57,348 | 54,000 ₹63,720 |
| 10.00 | Charges for providing refractory in the pressure parts tubes where ever necessary including transportation of refractory from stores and water from 0 m level to the required elevation, etc complete. | 1,000 | Kg. | 21,500 ₹25,370 | 22,500 ₹26,550 |
Tender Value
Refer Docs
EMD Value
₹39,900
Closing Date
19 Jan 2026, 2:00 pmClosed
CE/ TTPS
Chief Engineer, Tuticorin Thermal Power Station, Tuticorin
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler for the period from 01 04 2026 and upto 31 03 2027 or till the date of completion of entire quantity which ever comes earlier
2026_EB_638404_1
CE/TTPS/SE/M-II/No.60/2026-27
Open Tender
Miscellaneous Works
365 days
TTPS
As per BQR conditions in NIT
8 documents required · 8 mandatory
₹0
₹39,900
Yes
23 Mar 2026
2 Jan 2026
20 Jan 2026
2 Jan 2026
19 Jan 2026
2 Jan 2026
Charges for identification, rectification of tube puncture up to 10 Joints including Arc filling by spool piece, edge preparation and assisting for hydraulic test including IBR welding charges.
Charges for additional joint of tube size between 44.5 to 76.1mm OD exceeding 10 joints.
Charges for leading, lifting and arranging platform and scaffolding wherever required in the boiler and dismantling after completion of work.
Charges for transporting of 1 No. sky climber from Boiler maintenance stores to site, erection of sky climber for boiler tube replacement work and removal of sky climber, return back to stores after completion of works.
Charges for Shifting the position of sky climber inside the furnace for Boiler tube replacement and erosion fill up work inside the furnace.
Charges for water washing of boiler inter-pass area (area inclusive of re-heater coils, water wall Screen tubes, S.H Screen tubes etc.)
Charges for IBR welder for Arc filling of area 150 x 25 mm2 area for 3 layers
Charges for fin welding by cleaning, surface preparation and welding.
Removal & relaying of Insulation and Re fixing Skin casing inclusive of necessary Scaffolding arrangements for replacement of failed tubes & bends in pressure parts.
Charges for providing refractory in the pressure parts tubes where ever necessary including transportation of refractory from stores and water from 0 m level to the required elevation, etc complete.
Charges for fire crete castable refractory cement
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
BOQ_764051.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid