Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.0 LAccepted-Finance | L-1 | Accepted-Finance L-1 | |
| 2 | L-2₹5.0 L+₹239.22 (0.05%)Rejected-Finance | L-2 | Rejected-Finance Not L-1 |
Tender Value
₹4.8 L
EMD Value
₹9,600
Closing Date
21 Sept 2026, 10:00 amClosed
Executive Engineer Una Division HPPWD Una
Executive Engineer Una Division HPPWD Una
Restoration of rain damages of internal road at IRB Bangarh km.0.0 to 1.600 (SH Main Gate to MHC Office Mohal Bangarh to repair of pot hole in various RDS)(Deposit work )
2026_PWD_143417_1
Job 02 R/O R/D of internal road at IRB Bangarh
Open Tender
Civil Works
Percentage
30 days
Una
As per bid document
8 documents required · 8 mandatory
₹350
₹9,600
6 Oct 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
21 Sept 2026
15 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing , laying spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (pug mill) carriage of mixed material by tipper to site, laying in uniform layers in sub-base/ base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100KN (Eighty to hundred kilo newton) capacity to achieve the desired density including lighting barricading and maintenance of diversion etc. as per tables 400.11 & 400.12 and technical specification clause 406. including carriage of material within all leads and lifts and other incidentials.The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government.. | 33.75 | Per cubic metre | 1,500 | ₹50,625 |
| 2 | Providing and applying evenly a primer coat with bitumen emulsion (SS-1)on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg (zero point seventy kilogram to one point zero kilogram) per square metre using mechanical means as per technical specification clause 502 and as per direction of Engineer-in-charge including carriage of materials within all leads and lifts. and other incidentals.The rate including octroi royality,malkana toll taxes,GST, labour cess or taxes imposed by the Government | 450 | Per square metre | 86.15 | ₹38,767.5 |
| 3 | Repair to pot holes and removal of loose material, trimming of sides, cleaning of surface by providing tack coat with bitumen emulsion , 20mm thick premix carpet VG-30 and seal coat type B specification clause 1904.2,503 and 508.1 including carriage of materials within all leads and lifts and other incidential. The rate includes sale tax octori, royality,malkhana ,toll tax,GST,labour cess or other taxes imposed by the Government. NOTE: 1) All Type of material shall be arranged by the contractor vide Notification by Additional Secy.to the Govt. of HP vide letter No.PBW(B)©(17)2/0212 dated 7.8.2018 2) The rates shall be inclusing of all types of taxes including GST etctra) 3) The bidder are requested to submit their bid as per notification issued by the Principal Secy.PW to the Govt.of HP vide letter No.PBW(B) A(3)1/2020 dated 22.7.2020 & Govt. of HP vide letter No.PBW(B) A(3) 1/2020-1 dated 7.10.2021 | 1,007 | Per square metre | 386.35 | ₹3,89,054.45 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
SBD.pdf
Tender Documents • 2.91 MB
BOQ_213093.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .